Tender For supply of Lok Nirman Machinery material In Np Maihar Supply Of Lok Nirman Samagri - Ground Floor, Foundation Digging, Pcc Up To 15 Cm (6) - M-10/M-15, Rcc Footing, Rcc Column/Plinth Beam, Brick Work, 9, 4, Plaster, Plaster 12mm, Plaster 15mm, Plaster 20mm, Panting, Lime, Distemper, Oil Paint/Primer, P.C.C. Casting Road Work, Rcc Cast Drain/Culvert, Iron Cutting And Binding, Mixer With Fuel (8 Hrs), Vibrator (8 Hrs) With Fuel, Painting Work For Cleanliness And Other Departmental Work (Complete Work Like Base Painting Etc.), Work Of Writing On Walls And Boards For Departmental Information, Advertisement Etc. (Complete Work Like Base Painting Etc.), Fuel Will Be Paid By The Municipality Along With Loading And Unloading Driver Within The Material Transportation Area By Tractor And Trolley., All Nature Of Centering Steel Plate, Centering All Types Of Wood, Dust Filling In Floor (Building Work), Roof Casting, Centering 10-12 Cm, Iron Banding, Ballast Casting, Dust Spreading, Crushing (Road Work), P.C.C. Flooring, M-10, M-20 And Above, Labor Rate For Flooring, Kota Stone Laying, Floor Tiles, Marble Flooring, Wall Tiles, Granite, Paver Block, For First Floor, Rcc Column/Plinth Beam, Brick Work - 20 Cm, Brick Work - 10cm, Plaster, Whitewashing Lime, Panting Distemper, Painting Oil Pant/Primer, Iron Cutting And Binding, All Nature Of Centering Steel Plate, Centering All Types Of Wood, Roof Casting, Centering 10-12 Cm, Iron Banding, Ballast Casting, P.C.C. Flooring Base, M-10, M-20 And Above, Labor Rate Quota Stone For Flooring, Labor Rate For Flooring Floor Tiles, Labor Rate For Flooring Marble Flooring, Labor Rate Tiles For Flooring, Labor Rate Granite For Flooring, Labor Rate Paver Block For Flooring, For Second Floor, Rcc Column/Plinth Beam, Brick Work - 20 Cm, Brick Work - 10cm, Plaster, Whitewashing Lime, Panting Distemper, Painting Oil Pant/Primer, Iron Cutting And Binding, All Nature Of Centering Steel Plate, Centering All Types Of Wood, Roof Casting, Centering 10-12 Cm, Iron Banding, Ballast Casting, P.C.C. Flooring, M-10, M-20 And Above, Labor Rate Quota Stone For Flooring, Labor Rate For Flooring Floor Tiles, Labor Rate For Flooring Marble Flooring, Labor Rate Tiles For Flooring, Labor Rate Granite For Flooring, Labor Rate Paver Block For Flooring, For Third Floor, Rcc Column/Plinth Beam, Brick Work - 20 Cm, Brick Work - 10cm, Plaster, Whitewashing Lime, Panting Distemper, Painting Oil Pant/Primer, Iron Cutting And Binding, Centering Steel Plate, Centering Wood, Roof Casting, Centering 10-12 Cm, Iron Banding, Ballast Casting, P.C.C. Flooring, M-10, M-20 And Above, Labor Rate Quota Stone For Flooring, Labor Rate For Flooring Floor Tiles, Labor Rate For Flooring Marble Flooring, Labor Rate Tiles For Flooring, Labor Rate Granite For Flooring, Labor Rate Paver Block For Flooring, Sky Folding - Ground Floor, First Floor, Second Floor, Third Floor