Supply Of Materials For The Open / Covered Gey Water Drain For Community Under Mgnregs Scheme Lwm Work-1 Gp Pothnal Kharabadinni Village - Broken Stone Aggregate 40 Mm Oo88, Broken Stone Aggregate 20 Mm Size Oo88, Broken Stone Aggregate 12 Mm To 10 Mm Size Oo88, Coarse Sand ( Zone Iii ) Oo88, Portland Cement Oo88, Mixer ( Concrete ) - 1 Cum Capacity Oo88, Add Watering Charges At 1 Percentage On Material Oo88, Add Sundries Charges At 1 Percentage On Material Oo88, Size Stone 20 X 20 X 25 Cms Oo88, Bond Stone 20 X 20 X 45 Cm Oo88, Boulders Oo88, Mixer ( Concrete Small Used In Culvert ) Oo88, Mason Class I ( With Tools ) Oo88, Mason Class Ii ( With Tools ) Oo88, Stone Chistler Class Ii Oo88, Casurina Poles 100 - 150 Mm Oo88, Add Handling , Loading And Unloading At 1Percentage On Material Oo88, Add Sundries Charges At 2 Percentage On Material Oo88, Plasticizer / Super Plasticizer Oo88, Hom Of Vibrator 0.71 Days Oo88, Tmt Bars Fe 500 Oo88, Binding Wire Oo88, Silver Oak Or Equivalent Planks 38 Mm Thick Oo88, Add Handling , Loading And Unloading At 2Percentage On Material Oo88, Jungle Wood Runners And Planks Oo88, Add Providing And Removing Scaffolding At 3Percentage On Labour Oo88, Pvc Pipe Of 6Kg Cum 90 Mm Oo88, Spalls / Blasted Rubbles Oo88, Laboratory Asst. ( Sslc Passed ) / Mate / Supervisor Oo88, Pvc Pipe Of 10Kg Cum 90 Mm Oo88, Water Oo88, Gravel 2.36 Mm / Murrum Oo88, Wheeled Dozer ( D50 Beml ) Oo88, Motor Grader 3.35 Meter Blade Oo88, Water Tanker Oo88, Vibratory Roller 8 Tonne Oo88, Water Proofing Cement Paint Oo88, Add Brush, Putty, Sand Paper At 2Percentage On Cost Of Paint Oo88, Painter Class I Oo88, M.S Rods Oo88, Ms Flat Oo88, Fitter Class I Oo88, Welder Grade I Oo88, Add Hom Of Welding And Grinding Machine At 4Percentage On Material Oo88, Ready Mix Primer Paint ( Ready Mix Red Lead Paint ) Oo88, Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Percentage On Cost Of Paint Oo88, Enamel Metal Paint Oo88, Add Brush At 1Percentage On Cost Of Paint Oo88, Cib Oo88