Planning, Designing, Construction, Testing And Commissioning Of Commercial Building Of Rcc Framed Structure ( Basement 2 + Gf + 6 Floors+ Terrace ) “Pm Ekta Mall” At Pandri Haat Campus, Pandri , Raipur ( Chhattisgarh ) Which Meet Green Building Norms And Obtain The Certification Of The Same By Incorporating Stipulated Specification Along With All Services ( Civil And Em ) As Per Nbc- 2016 / Cpwd / Cgpwd Specification, Including Site Survey, Soil Investigation, Provision Of Parking Planning And Design Of Required Services, Preparation Of Preliminary Architectural Detailed Working Drawings, Structural Analysis Design, Planning, Designing , Execution Of All Civil And E M Services, Obtaining All Statutory Approvals Including Dismantling Of Existing Building, Cutting / Transplant Of Trees, Environment Clearance / Environment Impact Assessment ( Eia ) And Commencement Certificate From Local Body And Commissioning Of Services Etc. As Per Detailed Scope And Specifications For Civil And E M Works Including Internal Water Supply Sanitary Installations, Internal Electrical Installations And Fans, External Civil And Electrical Service Connections, Power Wiring , Telephone Conduiting And Wiring, Lightning Conductor System, Lifts, Escalators, Addressable Intelligent Fire Alarm System, Fire Fighting System With Wet Riser And Sprinkler System Pressurized Mechanical Ventilation I / C Chiller, Illuminated Signage, Lan System, Ip Based Epabx System, Wifi System , Ip Based Cctv System, Façade Lighting, Façade Projection Mapping, Water Supply Pump Sets, Dewatering Pumps And Panels, Online Ups System With 30 Minutes Backup, Dg Set, Integrated Building Management System, Audio -Visual / Conference System, Auditorium, Solar Water Heating System, Compound And Street Lighting With Led, Stp , Horticulture Work Etc And Any Other Component Necessary For Completion, Making The Facilities Functional, Obtaining Fire Clearance, Water Connection, Electrical Connection And Lift From Authorities Concerned, Obtaining Occupancy Certificate / Building Use ( Bu ) Permission From Local Body, Obtaining Green Certification, Preparation And Submission Of “As Built Drawings” And Handing Over Of The Building All Complete As Per Directions Of Engineer-In-Charge Including 1 Year Of Operation And Maintenance 3 Years Of Defect Liability Period.