|
| 1 | Removing of dust, old scratched paint, grease, metal surface dents by of wire brushes, emery paper, air blowers, old dhoti, brushes with the help of manuallabours, helpers as per site requirement. |
| 2 | Synthetic enamel paint in Dark Grey in 20 Ltr packing for all motors. (DSR Civil 2021 item no. 0834) |
| 3 | Synthetic enamel paint in Royal Blue in 20 Ltr packing for all pumps.(DSR Civil 2021 item no. 0834) |
| 4 | Synthetic enamel paint in Light grey in 20 Ltr packing for all electrical panels and Soft Starter.(DSR Civil 2021 item no. 0834) |
| 5 | Synthetic enamel paint in yellow in 20 Ltr packing for all girders and railings.(DSR Civil 2021 item no. 0834) |
| 6 | Synthetic enamel paint in Dark Blue in 20 Ltr packing for portable water pipe line. (DSR Civil 2021 item no. 0834) |
| 7 | Synthetic enamel paint in black in 20 Ltr packing for UGR Main hole MS plates and Valve platforms.(DSR Civil 2021 item no. 0833) |
| 8 | Turpentine oil in 20 Ltr packing. (DSR Civil 2021 item no. 7770) |
| 9 | ZMB thinner in 20 Ltr packing. (DSR Civil 2021 item no. 8517) |
| 10 | Metal Primer (U.G.) in 20 Ltr packing (DSR Civil 2021 item no. 8510) |
| 11 | Renovation of M.S. Platform in the pump house delivery sluice valves for safe operation by replacement of damaged M.S. Chanel of size100X50mm and angle 65X65X6 the work includes cutting, welding, grinding, finishing etc. of plate form, Chequered plate, railing and ladder as required with transportation loading unloading at site with the help of tools, tackles with heavy/manual labour. |
| 12 | Workmanship & hiring charges of compressor for spray& manual by making group of painters, helpers & required consumable item like, brushes, scrabbles, patties & other required tools making of scaffolding, stairs & arrangement as per site requirement. Job of painting to be carried after cleaning of the existing surfaceof pumps, motors, panels, valve platforms, all ms plates (pump house, transformer room, HT rooms), pipes, valves, railings, ladders and main hole covers etc. in all respect and making smooth surface and considering all safety measures to the manpower to avoid risk factor being a difficult site condition. It also including the cartage of material and equipment as required at sites for execution of work complete in all respect as per direction of Engineer-in charge carried out by painters. |