Tender For Fabrication And Erection---1 Boiler House 2 Dismantling, Fabrication, Erection Of Leak Proof Dampers At Pa, Sa, Fd & Id Fans 3 Dismantling, Fabrication & Erection Of Air Heateroutlet Duct With Cone & Section Upto Inlet Of Travelling Grate Furnace. 4 Dismantling, Fabrication & Erection Boiler Furnace Ash Discharge Hopper 5 Dismantling Of Submerged Belt Complete In All Respect 6 Fabrication & Erection Of Submerged Belt Complete In All Respect 7 Dismantling Of Boiler Exit Duct From Boiler Outlet Toeconomizer Inlet 8 Fabrication & Erection Boiler Exit Duct From Boiler Outlet Toeconomizer Inlet 9 Dis, Fabrication And Erection Work Of Expansion Bellows At Fd, Id, Esp 10 Ducting Work 11 Strengthening Of Ducting Of Boiler. 12 Dis, Fab & Ere Of Airheater Expansion Bellow 13 Dis, Fabrication And Erection Of Id Fan Upper & Lower Casing 14 Dismantling, Fabrication & Erection Of Drum Type Rotary Bagasse Feeder ( With Shalf ) 15 Dismantling, Fabrication & Erection Ofscrew Feeder 16 Dismantling, Fabrication & Erection Of Screw Feeder Casing. 17 Fabrication & Erection Of Man Hole 18 Dis., Fab & Erecting Of Aph Tubes ( Replacement ) 19 Dis, Fab & Erection Of R.O Plant Pressure Vessel Stand 20 Fab & Erection Of Fire Fighting Pipe Line Including Valves, Bends, Flange & Support ( Using New Pipeline & Old Drum To Drum Tubes ) 21 Travelling Grate Front Side Ash Discharge Plate Dis, Fab, & Erection With Structure 22 Fab & Erection Of Travelling Grate Rear Plate Flange ( Flange Type ) 23 Fabrication & Erection Of Pneumatic Spreader Assembly From 8Mm Thk. S.S. Plate With Fabrication & Erection Of Deflector Plate From 20Mm Thk. S.S. Plate With Top & Bottom Flange 24 Dismantling Of Old Pneumatic Spreader Assembly &Internal Deflector Plate 25 Dismantling & Fitting / Replacement Of Id Fan Impeller 26 Fabrication & Erection Of Id Fan Suction Bend 27 Fabrication & Erection Of Id Fan Suction Cone 28 Fabrication & Erection Of Plate & Spindle Type Damper With Flanges 29 Dismantling And Fitting Of Rotory Soot Blower 30 Dismantling & Fitting Of Long Rectractable Soot Blower 31 Dismantling, Fabrication & Erection Of Economizerl.H.S. & R.H.S From 6 Mm Thk. M.S. Plate With Strengthening From 65 X 65 Angles 32 1.5 Kg / Cm2 Prds, Exhaust & Vapour Pipeline Fabrication & Erection From 10Mm Thk. M. S. Plate 33 1.5 Kg / Cm2 New Prds ( 25 Tph ) 400 N.B Valve Dismantling, Overhauling And Fitting 34 Dismantling, Fabrication & Erection Of New Bagasse Discharge Chute At Return Bagasse Carrier With Gate Arrangement Complete Set In All Respect 35 Fabrication And Erection Of Boiler Outlet / Economizer Hopper 36 Fabrication And Erection Of Water Monitor On Fire Fighting Line 37 Fabrication And Erection Of Id Fan Suction Cone 38 Dismantling, Repair & Overhauling & Fitting Of All Accessories Of Ash Handling System With Trial 39 Disconnecting Of Wet Scrubber Duct From Boiler Duct After I.D.Fan 40 Boiling House 41 Platform Work At Various Stations Such As Mill House, Boiler, Turbine, Cranes, Boiling House, C / F House Etc.If Required Any Where. 42 Dismenling Of Electic Motor 43 Fitting Of Motor 44 Repairing Of Exhaust Valve 45 Fab & Erection Of Double Filteration System For Quad & Water Inlet Pipe In Pan Condenser. 46 Arrangement For Lifting Of Vaccum Filtered Drums-3 Nos 47 Replacement Of Exhaust And Vapour Valves In The Boiling House. Dis 48 Replacement Of Exhaust And Vapour Valves In The Boiling Houseerec- 49 Fabrication Of Electric Motor Cover. 50 Strengthening Of Vapour Pipe Inside & Outside With Angle Iron Rings / M.S.Plate. 51 Manhole Work In Vapour Pipes / Headers 52 Modification In Bagacillo Chimney 53 Replacement Of Vapour Pipe.Dis 54 Exhaust And Injection 55 Fab 56 Erec. 57 Replacement Of V.Pipe Bends Dis 58 Exhaust & Injection Bends Fab- 59 Exhaust & Injection Bends Erec. 60 Dis, Fab & Ere Of Final Molasses Pipeline 61 Dis, Fab & Ere Of Suction Pipe For Injection, , Ct Pump 62 Fab & Erecdtion Of M.S.Vessels, Square & Rectangular Tank 63 Increase of shell height with all the fitting and accessories Work. 64 Fab & Erection of M.S.plate work 65 Dis,Cleaning & Ere of pipeline (Juice,Massecuite,Srrup,Molasses etc) 66 Dis,Fab & Ere of Coil(water,juice,ammonia,so2etc) 67 Fab and erection of Motor bed 68 Dis,Fab & Ere of NRV for injection,turbine,sprayetc 69 Saveall of Pan,QuadDIS 70 Saveall of Pan,QuadFAB 71 Saveall of Pan,Quad ERE 72 Unloading of Material from Truck(MS,SS,CI,ACCetc) 73 Dis,Fab & Ere of Jay pipe 74 Fitting of Baffle plates 75 Fabrication of belt conveyor 76 Clarifier coil work a) Dismentling 77 Clarifier coil work (b) Fabrication 78 Clarifier coil work ( c) Erection 79 Dismentling, fabrication & erection of PerforatedM.S platesOf Direct contact juice heaters. 80 Dismentling , fabrication & erection of strainers of Injection, spray , C.T pumps. 81 Dismentling , erection( with allignment) of planetarygear box ofcrystallizers. 82 Nozzles of spray pond, condenser. 83 Dismantling (earh nozzle) 84 Fitting(earh nozzle) 85 Replacement of Double beat valve 86 Fabrication ofexhaust valve casing 87 Opening & Fitting of Juice Heater Covers 88 Dismantling & fitting of S.S Tubes in Juice Heater & Evaporator Body 89 Dismantling, Fabrication & Erection of Mud Mixture Conveyor 90 Dismantling, Fabrication & Erection of Mud Mixture Casing 91 Dismantling, fabrication & erection of down take umbrella of Pan 92 Replacement of 3’’ coil of vertical crystallizer 93 Gutter Work (bigger side will be treated as dia.) 94 Gutter Work Dismantling 95 Gutter Work Fabrication 96 Gutter Work Erection 97 Two round welding work if required anywhere 98 Jammed tube falling film Evaporator 99 Replacement of C.I cross 100 Dismantling and Erection of sluice valve 101 Fabrication / strenghting of beam, vessel, pipe, channel, angle etc. 102 Dismantling of pump 103 Erection and alignment of pump 104 Replacement of readymade bend 105 Replacement of ammonia pipe of pan & Quad 106 Replacing of .S.S coils of vacumm filter 107 Replacing of worn out brass zig zags & S.S screens ofVaccum Filter 108 Dismantling of M.S plate 109 Dismantling of Existing syrup sulphitor & shifting to scrap yard 110 Dis., Fab & Erection of Save all cone of evaporator And pans 111 Shifting of M.S fabricated tank 112 Dismantlinginstallation and alignment of reduction Gear box. 113 Dismantling, Fab & erectioning of agitator 114 Repairing & assembling of complete sugar handingRs. L.S System with stackers 115 Fitting of new batch type machine 116 Fitting of new continuous type machine 117 Replacement of exhaust balloon 118 Repair of Savall of quad and pan 119 Repair of screw type arm of crystallizer 120 Checking & repair of drive of vertical crystallizer 121 Replacement of tube of quad and juice heater 122 Repairing of drive of clarifier 123 Dismantling of cover of S400 semikestner 124 Replacement of S.S. pipelines including pipe fittings 125 Replacement of seamless pipeline including pipe fitting 126 Replacement of Magma mixer with arm, bracket & gear 127 Dismantling, fabrication & erection of underground S.S. pipeline for condensate water 128 Dismantling, fabrication & erection of coneas per requirement 129 Modification of bagasscillo cyclone 130 Dismantling, fabrication, assembly and trial of mechanical Circulator 131 Modification in exhaust & vapour wall 132 Dismantling, fabrication & erection of spray pond header 133 Dismantling, fabricaton & erection of basket housing Cover & bottom discharge chute of centrifugal house 134 Dismantling, fabrication & erection of arms of clarifier 135 Dismantling, fabrication & erection of down tape of evaporator bodies 136 Fabrication & erection of molasses jacket for batch type C/F M/C 137 Hydraulic testing of vertical crystallizers completein all respects 138 Dismantling, fabrication & erection of various stationsfor entertainment cat nor 139 Dismantling & installation of super heater in boiling house 140 Dismantling & installation of oil cooler at turbine 141 Dismantling, fabrication & erection of all high pressure line drains at turbine 142 Repairing work in various continuous pen 143 Replacement/ repairing of cut nor valve for Pen 144 Modification work in juice line below quad station 145 Dis., Fabrication & erection of grit conveyor 146 Dis., Fabrication & erection of sugar hopper 147 Dis., repairing & assembling of spray pond & injection pump 148 Dis., repairing & assembling of batch type Centrifugal machine 149 Dis., Fabrication & erection of vapour/ exhaust line from quad to pan station 150 Dismantling and fitting vapour/exhaust valve 151 Dismantling, fabrication & erection of bagassecillo line 152 Dismantling, fabrication & erection of underground & outside pipeline of all sizes 153 BOILER/TURBINE, COOLING TOWERSUGAR GODOWN/WORKSHOP/STORE/CANE UNLOADER & FACTORY 154 Fab & Erection ofgate 155 Strengthning of tress beams,vessel,pipe with channel,angle,pipe etc any where 156 Roof sheets /ACC /Iron sheet work. Dis- 157 Roof sheets /ACC /Iron sheet work Repair- 158 Replacement & Erection 159 Fab & Erection of M.S.stair/Ladder a) single story 160 Double story 161 Cleaning of Cooling Tower water line 162 Checking & Repairing ofCooling Tower Water line condenser to Cooling Tower 163 Repair of hydraulic grab of cane unlaoder 164 Replacement of square bar of cane unlaoder 165 Repairing and cleaning of cooling tower its nozzle 166 Dismantling, fabrication & erection of underground andOutside pipeline of all sizes 167 Dismantling, fitting & alignment of cooling tower, gear Box and fan 168 Fabrication & erection of NRV of CT Pump 169 Dismantling, fitting of steam blowing pipeline 170 Dismantling, fabrication & erection of turbine silencer 171 Dismantling & fitting of turbine expension bellow 172 Dismantling, fabrication & erection of cooling towerpipeline from cooling tower of turbine 173 MISC .ITEMS. 174 M.S Pipeline per inch dia//ft/length (a ) Dismentling of pipe line. 175 Upto 1” dia to 12’ dai . 176 Above 12” 177 Fabrication of pipe line from M.S.plate or ready-made pipe any dia . 178 Erection of pipe line per inch dia/ft/length(i) Upto 1’ dia to 179 Erection of pipe line per inch dia/ft/length (ii. Above 12” dia 180 M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length )(a) Upto 1”diato 12” dia 181 M.S.Pipe accessories work, dismantling of bends, Tee, reducder, cross, elbow,nipple,nozzle, flanged, and bends. (per inch dia/ft/length (ii.) Above 12” dia. 182 Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) (i) upto 1”diato 12” dia 183 Fabrication of bends, tee, reducer etc.-(p.inch dia/ft) ( ii) above 12 dia.. 184 Erection of bends, tee etc.(per inch dia/ft/length) (i) upto 1” dia to 12” dia 185 Erection of bends, tee etc.(per inch dia/ft/length) ii) Above 12” dia 186 VALVE WORK 187 Dismantling of valves, (per inch dia/pc) Upto 1” dia to 12” dia 188 Dismantling of valves, (per inch dia/pc) Above 12” dia 189 ERECTION OF VALVE 190 Dismantling of valves ,(per inch dia/ft/length) (i) Upto 1” dia to 12” dia 191 Dismantling of valves ,(per inch dia/ft/length( ii) Above 12” dia 192 PLATEFORM WORK (Per SFT) 193 I) Dismantling 194 II) Fabrication and ereection 195 a) Patch work with old material. 196 b)patch with new material . 197 Purling in work.(per RFT) (i) Dismantling 198 Fabrication & Erection 199 Cutting of old flange repairing for reuse & fitting 200 Dis, fabrication and erection of distance piece 201 Repairing of cane unloader bridge 202 AMC of injection and spray pond pumps during crushing season 2024-25 203 AMC of batch type centrifugal machine during crushing season 2024-25