Providing And Fitting Fixing Of Pa System Including Necessary Wiring For Pa System At State Guest House, Bholagiri, Agartala ( W ) Tripura Under Rd Agartala Division , Supplying And Fixing Of The Following Pvc Casing Capping With All Accessories Etc. As Required. ( Sor-2021 ( I / E ) -601 ) , Wiring For Fitting Fixing Of Wall Speaker In Pvc Casing & Capping On Wall Etc. As Required:- ( Analysis Rate ) , Mx Tv Out Cable High Performance Flexible Oxygen Free Speaker Wire Cable. ( 50Mtr Coil ) , Supplying And Fitting Fixing Of Ps 300 Tm 10 Watt Speaker High Fidelity 2 Way, 100V Multipurpose, 100 V, Power Taps Of 6W, 3W & 1.5 W. Speaker Type Book Shelf, Connectivity Technology-Auxiliary, Movable Mounting Bracket Supplied, Can Be Mounted In Vertical Or Horizontal Position. ( Analysis Rate ) , Supplying And Fitting Fixing Of Amx 812 Mixer, 8 Channel, Ac & 24 V Dc Operation , Each Channel Has A 1 / 4 Phone Jack, Each Channel Has Gain, Bass, Treble, Pan, Echo And Level Controls With Clip Led Indicator, Echo Section Provided With Delay, Repeat & Level Controls, Tape Section For Record & Play Back Facility As Req. ( Analysis Rate ) , Construction Of Temporary Urinal Point ( Size 1.2M X 1.20M X 1.80 M ) At Different Location In Mela Ground By Using Double Layer Dhari Mat Wall & Shutter Of Door With Split Bamboo Battens 40Mm Wide Including Tying With Gl Wire Erection In Position, Fitting Fixing Etc. And 2 Nos Bricks For Foot Step With A Sock Pit Point ( Size 0.9M Dia And 1.20M Depth ) And Covered By Barak Bamboo And Earth Over 75Mm To 100Mm Dia Barak Bamboo Complete As Per Direction Of Eng-In-Charge. After Completion Of Fair Materials Will Be The Assets Of Concerned Agencies. , Construction Of Temporary Vip Toilet With Commode By Using 6Mm Thick Ply Wood Wall & Floor, Wooden Structure, Pvc Door And Erection In Position, Fitting Fixing And Painting As Per Required Shed With Provision For Door Shutter & Locking Arrangement Etc. And Excavation Of Pit 0.75 M Dia And 1.20 M Depth Incl. Cover Of Pit By Barak Bamboo And Earth Over 75Mm To 100Mm Dia Barak Bamboo Complete As Per Direction Of Eng-In-Charge. After Completion Of Fair Materials Will Be The Assets Of Concerned Agencies. , Supplying, Spreading And Filling Of Sand ( Course ) In The Assam Rifles Ground And Raj Bhavan Wherever Required As Per Direction Of Eng-In-Charge. , Hiring Charge Of Carpet Including Laying And Fixing In Position By Maintaining Proper Column & Rows Including Loading Unloading And Carrying Complete As Per Direction Of Eng-In-Charge. , Providing And Laying Flat Brick Soling Layer On Prepared Subgrade According To Lines, Roads And Cross-Section Shown On The Drawing, Filling Joints With Earth, Free From Clay With A Plasticity Index Not Exceeding 6, Watering And Rolling The Same With Three Wheeled Road Roller 80-100 Kn As Per Mord Technical Specification Clause 412. The Dismantled Construction Materials Will Be The Assets Of The Concerned Agency. , Construction Of Temporary Single Gci Sheet Roof Shed ( Superstructure ) For Led Screen Of Height Range 20Ft To 25Ft And Size Of Shed 30Ft X 8Ft Asper Instruction And One Intermediate Wooden Platform At A Height Of 10Ftproperly Braced By The Wooden Plank And L.50M Interval Intermediate Post 75 Mm To 100Mm Dia Barak Bamboo Post, Post Plate, Rafter, Purlinetop & Bottom For Gci Sheet Roofing Tying With Gl Wire / Rope Including The Cost Of Loading Unloading And Caring Tying, Fitting Fixing Complete As Per Direction Of Eng- In Charge ( No Gci Sheet Will Be Supplied By The Department ) . The Three Side Of The Shed Will Be Covered By The Dark Shed Cloth To Prevent Passing Light. ( After Completion Of The Fair, The Agency Will Be Bound To Dismantle The Construction Within 3 ( Three ) Days With His / Her Own Cost. For That, Extra Charge Will Not Be Claimed By The Concerned Agency. The Dismantled Construction Materials Will Be The Asset Of The Concerned Agency ) . , Providing And Fitting Fixing Of Wooden Platform For Selfie Point ( Size:12Ftx12ft ) & Steps By Using Wooden Post ( Size-0.10Mx0.10M ) , Runner ( Size-0.076Mx0.076M ) , Wooden Plank ( Thickness-0.04M ) Or 12Mm Ply Wood And Nail ( Height As Per Requirement Of Platform ) Complete As Per Direction Of Eng-In-Charge. After Completion Of Fair Materials Will Be The Assets Of Concerned Agencies. , Hiring Charges Of Cooler Including Fitting-Fixing In Position By Maintaining Proper Connection Without Leakage Etc. Including Carrying, Loading-Unloading Complete As Per Direction Of Eng-In-Charge. , Hiring Charges Of Ceilling Fan Including Fitting-Fixing In Position By Maintaining Proper Connection Without Leakage Etc. Including Carrying, Loading-Unloading Complete As Per Direction Of Eng-In-Charge. , Hiring Charges For Providing And Fitting Fixing Of Led Light ( 18 / 20 Watt ) On Hire Basis At Ceiling In Position Including Providing Electric Connection With Necessary Wire As Per Instruction Of Engg-In Charge. , Hiring Charges Of Center Table Made With Glass Cover Including The Cost Oflaying In Position Of Rows And Column As Desired By The Tendering Authority And Loading, Unloading, Carrying And Stacking Complete As Directed By The Engg-In-Charge. , Hiring Charges Of Plastic Chair With Or Without Arm As Desired By The Authority Including The Cost Oflaying In Position Of Rows And Column As Desired By The Tendering Authority And Loading, Unloading, Carrying And Stacking Complete As Directed By The Engg-In-Charge. , Hiring Charges Of Tfdpc Made Wooden Armed Chair With Cushionincluding The Cost Oflaying In Position Of Rows And Column As Desired By The Tendering Authority And Loading, Unloading, Carrying And Stacking Complete As Directed By The Engg-In-Charge. , Hiring Charges Of Executive Class Sofa Set With White Towel For Covering The Sofa Set Including Laying In Position Of Rows And Column As Desired By The Tendering Authority And Loading, Unloading, Carrying And Stacking Complete As Directed By The Engg-In-Charge. , Shuttering Carpenter-System--Hacksaw Frame With Blade , Shuttering Carpenter-System--Triangle File , Shuttering Carpenter-System--1 / 2 Round File , Shuttering Carpenter-System--Drill Bit , Shuttering Carpenter-System--Ring Spanner , Shuttering Carpenter-System--Double End Spanner , Shuttering Carpenter-System--Flat File , Shuttering Carpenter-System--Material For Temporary Scaffolding Up To 3.6 Mtrs , Shuttering Carpenter-System--Base Plate , Shuttering Carpenter-System--Joint Pin , Shuttering Carpenter-System--Vertical , Shuttering Carpenter-System--Ledger , Shuttering Carpenter-System--Cuplocks , Shuttering Carpenter-System--Walkway Challi , Shuttering Carpenter-System--Hand Held Zig Saw , Shuttering Carpenter-System--Hand Drill Machine , Shuttering Carpenter-System--Table Mounted Saw , Shuttering Carpenter-System--Power Drilling Machine , Shuttering Carpenter-System--Planing Machine , Shuttering Carpenter-System--Steel Walkways , Shuttering Carpenter-System--Gi Ladder ( 7 Step ) , Shuttering Carpenter-System--Plumb Bob , Shuttering Carpenter-System--Water Level Tube , Shuttering Carpenter-System--Masons Line , Shuttering Carpenter-System--Hammer , Shuttering Carpenter-System--Spanner , Shuttering Carpenter-System--Wrench , Shuttering Carpenter-System--Pulley , Shuttering Carpenter-System--Rope , Shuttering Carpenter-System--Nut And Bolts ( Various Size ) , Shuttering Carpenter-System--Safety Net , Shuttering Carpenter-System--Safety Shoes , Shuttering Carpenter-System--Safety Gogles , Shuttering Carpenter-System--Safety Helmets , Shuttering Carpenter-System--Cotton Hand Gloves , Shuttering Carpenter-System--Tools Bag , Shuttering Carpenter-System--Safety Belt , Shuttering Carpenter-System--Safety Harness , Shuttering Carpenter-System--Face Mask , Shuttering Carpenter-System--Leather Apron , 5H ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Belbari Rd Block Area , 5I ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Mohanpurrd Block Area , 5J ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Bamutia Rd Block Area , 5K ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Dukli Rd Block Area , 5L ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Hezamara Rd Block Area , 5M ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil / Dismantled Of Existing Structure / Clearing Of Debris / Garbage Departmentally ( Including Fuel, Driver & Other Charges, Etc. Complete ) . ----Lefunga Rd Block Area , 6A ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Amc Area , 6B ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Mmc Area , 6C ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Jirania Np Area , 6D ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Ranirbazar Mc Area , 6E ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Jirania Rd Block Area , 6F ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Mandwi Rd Block Area , 6G ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Old Agartala Rd Block Area , 6H ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Belbari Rd Block Area , 6I ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Mohanpurrd Block Area , 6J ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Bamutia Rd Block Area , 6K ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Dukli Rd Block Area , 6L ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Hezamara Rd Block Area , 6M ) Hiring Charge Of Tripper / Truck For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment Within 1 ( One ) Kmas Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges Etc. Complete ) ----Lefunga Rd Block Area , 7A ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Amc Area , 7B ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Mmc Area , 7C ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Jirania Np Area , 7D ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Ranirbazar Mc Area , 7E ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Jirania Rd Block Area , 7F ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Mandwi Rd Block Area , 7G ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Old Agartala Rd Block Area , 7H ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Belbari Rd Block Area , 7I ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Mohanpurrd Block Area , 7J ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Bamutia Rd Block Area , 7K ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Dukli Rd Block Area , 7L ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Hezamara Rd Block Area , 7M ) Hiring Charge Of Jcb Etc For Excavation Of Different Types Of Soil By Departmentally ( Including Fuel, Driver & Other Charges Etc. Complete ) . Working Of 8 Hours Will Be Considered Per Day----Lefunga Rd Block Area , 8A ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Amc Area , 8B ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Mmc Area , 8C ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Jirania Np Area , 8D ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Ranirbazar Mc Area , 8E ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Jirania Rd Block Area , 8F ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Mandwi Rd Block Area , 8G ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Old Agartala Rd Block Area , 8H ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Belbari Rd Block Area , 8I ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Mohanpurrd Block Area , 8J ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Bamutia Rd Block Area , 8K ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Dukli Rd Block Area , 8L ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Hezamara Rd Block Area , 8M ) Hiring Charge Oftripper / Trucketc For Lifting Of Available Excavatedearth To Filled Up The Depression / Embankment As Per Instruction Of Eng- In – Charge ( Includingloading / Unloading, Fuel, Driver & Other Charges ) Working Of8 Hours Will Be Considered As Per Day----Lefunga Rd Block Area , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand , Sand