|
| 1 | Supply Item |
| 2 | Supply of all Type of Nut Bolts as per Specification of UPCL. |
| 3 | Supply of M S Holding Clamp for PCC Pole with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 4 | Supply of F Clamp for PCC Pole with nut and bolts and washer.(As Per Specification & Drawing of UPCL) |
| 5 | Supply of Stay Clamp for PCC Pole with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 6 | Supply of Earth wire Clamp for PCC Pole with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 7 | Supply of Suspension Clamps With I Hook. (As Per Specification & Drawing of UPCL) |
| 8 | Supply of M S Half Clamp for Fuse Set. (As Per Specification & Drawing of UPCL) |
| 9 | Supply of M.S Clamp for Dead End Clamp with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 10 | Supply of M.S Clamp for Suspension Clamp with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 11 | Supply of Dead End Clamps With I Hook. (As Per Specification & Drawing of UPCL) |
| 12 | Supply of HT Stay Insulator of best Quality Pore Line and without defeats ISI Standard.(As per Specification & Drawing of UPCL) |
| 13 | Supply of Shear Head type Insulated Piercing Connector body moulded from high quality mechanical Climate and UV resistant glass reinforced polyamide hot dipped galvanized bolts & contact teeth ABC size 95 Sq mm to 120 sq mm. MAKE- (TYCO/RPG/3M/SICAME/ENSTO) |
| 14 | Supply of Danger Board complete by providing clamps M.S. Flate 50x6 mm with danger board of M.S. Sheet 2 mm Thick 11\"7\" Size. (As Per Specification & Drawing of UPCL) |
| 15 | Supply of Shear Head type Insulated Piercing Connector body moulded from high quality mechanical Climate and UV resistant glass reinforced polyamide hot dipped galvanized bolts & contact teeth ABC size 120 Sq mm to 25 sq mm. MAKE- (TYCO/RPG/3M/SICAME/ENSTO) |
| 16 | Supply of L.T. Bare NeutralConnectors PG Clamp 95 sq mm to 25 sq mm.(As Per Specification & Drawing of UPCL) |
| 17 | Supply of HT Fuse Set.(As Per Specification & Drawing of UPCL) |
| 18 | Supply of SMC Three Phase L.T. Distribution Box for connection of LT consumer With in built Panel Lock with key, Al bus bar RYB 25x6 mm & Al bus bar N 40x6 mm.MAKE- (SINTEX/Other IS Complied Reputed Company) |
| 19 | Supply of L.T. Bare NeutralConnectors PG Clamp L-L 95 sq mm to 95 sq mm.(As Per Specification & Drawing of UPCL) |
| 20 | Supply of PG Clamp.(As Per Specification & Drawing of UPCL) |
| 21 | Supply of LT Fuse Set.(As Per Specification & Drawing of UPCL) |
| 22 | Supply of Aluminium Crimping Lug Size 120 sq mm made of best Quality Pore Line and Without Defeets ISI Standerd.(As Per Specification & Drawing of UPCL) |
| 23 | Supply of Aluminum Lugs \"O\" type size 25 mm for PVC cable 4x25 sq mm. (As Per Specification & Drawing of UPCL) |
| 24 | Supply of M.S. Half Clamp for LT Distribution box with nut and bolts and washer. (As Per Specification & Drawing of UPCL) |
| 25 | T/F and Pole Installation Work |
| 26 | Cartage of Following Material by private truck from store centre Rudrapur /Haldwani/ Kashipur to dump store approx. distance 21 to 50 Km. including loading into truck and unloading at road work site. |
| 27 | PCC Pole |
| 28 | Small Line Material including Conductor |
| 29 | 63 KVA T/F |
| 30 | 100 KVA T/F |
| 31 | Head Load Cartage of Following Material approx. distance 0 to 1 Km. including loading unloading. |
| 32 | PCC Pole |
| 33 | Small Line Material including Conductor |
| 34 | 63 KVA T/F |
| 35 | 100 KVA T/F |
| 36 | Providing and Installation of Chemical Earthing of distribution transformer including digging of pit of size 2.5Mtr depth and make hole of size 150mm. Placing of earthing electrode (to be supplied by contractor as per upcl norms connecting the same with GI strip (to be supplied by contractor) of size 35X6 mm as per norms minimam length 6M, treated of soil with highly conductive substance in all respect, result of earthing resistance to be recorded before abd after instollation of earthing. The earth resistance after earthing should be less then 1Ohm. Each Transformer by 2 No (1No for Neutral and 1No for Body) |
| 37 | Erection & Fixing of M.S. earthing rod 20×2500 mm for earthing of support as per RESPO drawing No. RES-12 including digging earth rod 0.3 m deep below ground level connected to support with earth wire 16 swg fixing of all accessories in all respect as per Specification of UPCL. |
| 38 | Fabrication of Single Pole, Double pole Straight Cross arm T off Top and Dropper, Brecing Channel of M.S. Channel100x500 mm & M S Angle 65x65x6 mm Cutting and HollingComplete Work as per Specification of UPCL. |
| 39 | Excavation of earth for Stay set pit of size 0.6x0.6x1.2 Mtr Length in all type of soil including proper dressing of sides and ramming of bottom including getting out soil and disposal of surplus excavation soil as directed complete work in all respect. |
| 40 | Fixing and tightening of LT stay set with pole and stay rod on required tension as per specification of UPCL. |
| 41 | Fixing and tightening of HT stay set with pole and stay rod on required tension as per specification of UPCL. |
| 42 | Grouting of stay set complete as per RESPO drawing no. RES-16 with stay rod 16×1800 mm stay wire 7/10 SWG including excavation of earth and grouting of stay in pit with CC 1:4:8 in bottom of pit in size 0.60×0.60×0.60 mtrs, including cost of cement, sand and stone ballast etc. fixing of all accessories complete in all respect as per Specification of UPCL. |
| 43 | Excavation of Earth for Pole structure of Pole Pit of Size (0.9x0.6x1/6) of pole length in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and diposal of surplus soil as directed complete work. |
| 44 | Erection of Following Pole Structure after digging of pit size 0.6×0.6 mtrs & 1/6 length of support on 300×300×75 mm stone pad including fixing with all accessories complete in all respect as per Specification of UPCL. |
| 45 | Single Structure of PCC Pole |
| 46 | Double Structure of PCC Pole |
| 47 | Grouting of Pole in size (0.45x0.45x1/9) length of support in CC ratio 1:4:8 (1Cement :4Graded Stone :20 mm nomial size :8 coarse sand) Block Including cost of material complete in all respect as per specification of UPCL. |
| 48 | Mounting and Installation of of following Capacity Transformer/Plinth/Double Pole Structure with the help of Chain Pulley/Crain Depending upon the nature of Job at work complete in all respect and Energisation of Transformer |
| 49 | 63 KVA T/F |
| 50 | 100 KVA T/F |
| 51 | Installation /Fixing of Fuse Set complete in all respect as per specification of UPCL. |
| 52 | Installation /Fixing of L.A complete in all respect as per specification of UPCL. |
| 53 | Laying and stringing of HT New line on following conductor Fixing with all accessories proper sag including binding etc complete in all respect as per Specification of UPCL. |
| 54 | 11 KV Line in ACSR Rabbit Conductor |
| 55 | Fixing of Danger Board complete in all respact |
| 56 | Laying,Stringing and sagging of LT A.B Cable size (3x120+1x95) complete in all respect as per Specification of UPCL. |
| 57 | Installation of Distribution Box, |
| 58 | Disconnection and Reconnection of LT Consumer |
| 59 | Laying and Fixing of LT XLPE Cable complete in all respect. |