}

Tender For In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023-24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road, meerut-Uttar Pradesh

Public Works Department has published Tender For In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023-24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road. Submission Date for this Tender is 29-02-2024. Road Work Tenders in meerut Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42451655
Corrigendum : Tender For In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023-24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road
Open Tender
NCB
Uttar Pradesh
Meerut
29-02-2024

Tender Details

Tender For In View Of The Increasing Traffic Pressure In Meerut Metropolis In The Financial Year 2023-24 Construction Work Of The Link Road To Connect Baghpat Road With Railway Road- 1 Excavation In Soil Using Hydraulic Excavator And Tippers With Disposal Upto 1000M Excavation For Roadwork In Soil With Hydraulic Excavation Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers Trimming Bottom And Side Slopes, In Accordance With Requirement Of Lines, Grades And Cross-Sections, And Transporting To The Embankment Location With A Lift Uptp 1.5M And Lead Upto 1000 M As Per Technical Specification Including All Material, Labour, Taxes But Excluding Gst 2 Removal Of Unserviceable Soil Including Excavation, Loading And Disposal Upto 1000 Metres Lead But Excluding Replacement By Suitable Soil Which Shall Be Paid Separately As Per Clause 305.Ve The Desired Density, Including All Material, Labour, Taxes But Excluding Gst 3 Loosening, Leveling And Compacting Original Ground Supporting Embankment To Facilitate Placement Of First Layer Of Embankment, Scarified To A Depth Of 150 Mm, Mixed With Water At Omc And Then Compacted By Rolling So As To Achieve Minimum Dry Density As Given In Table 300-2 For Embankment Construction.Including All Material, Labour, Taxes But Excluding Gst 4 Construction Of Sub-Grade And Earthen Shoulders With Approved Material Obtained From Borrow Pits With All Lifts & Leads, Transporting To Site, Spreading, Grading To Required Slope And Compacted To Meet Requirement Of Table No. 300-2 Lead Up To 12 Km Distance Including All Material, Labour, Taxes But Excluding Gst 5 Construction Of Granular Sub-Base By Providing Close Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Front End Loader At Omc, And Compacting With Vibratory Roller To Achievve The Desired Density, Complete .As Per Referencetomort&H Specification 401Sn Including All Material, Labour, Taxes But Excluding Gst 6 Providing, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mix Plant Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers With Grader In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller To Achieve The Desired Density. Including All Material, Labour, Taxes But Excluding Gst 7 Providing And Applying Primer Coat With Ss1 Grade Bitumen Emulsion On Prepared Surface Of Granular Base Including Clearing Of Road Surface And Spraying Primer At The Rate Of 0.70To 1.00 Kg / Sqm Using Mechanical Means. Including All Material, Labour, Taxes But Excluding Gst 8 Providing And Applying Tack Coat With Bitumen Emulsion Using Emulsion Pressure Distributor At The Rate Of @ 0.25Kg Per Sqm On The Prepared Bituminous Surface Cleaned With Mechanical Broom.As Per Referencetomort&H Specification 503 Sn.5.02 Rates Are Including All Labour, Material, T&P, Taxes & Labour Cess But Excluding Gst 9 Providing And Laying Dense Graded Bituminous Macadam With Higher Capacity Batch Type Hmp Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Bindervg-30 @ 4.5 Per Centby Weight Of Total Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specificationcomplete In All Respects.As Per Referencetomort&H Specification 505Sn. 5.4 Including All Material, Labour, Taxes But Excluding Gst 10 Providing And Applying Tack Coat With Bitumen Emulsion Using Emulsion Pressure Distributor At The Rate Of @ 0.20Kg Per Sqm On The Prepared Bituminous Surface Cleaned With Mechanical Broom.As Per Referencetomort&H Specification 503 Sn.5.02 Including All Material, Labour, Taxes But Excluding Gst 11 Providing And Laying Bituminous Concrete Withhigher Capacity Batch Type Hot Mix Plant Using Crushed Aggregates Of Specified Grading, Premixed With Bituminous Binder Vg-30 @ 5.4Per Centof Mix And Filler, Transporting The Hot Mix To Work Site, Laying With A Hydrostatic Paver Finisher With Sensor Control To The Required Grade, Level And Alignment, Rolling With Smooth Wheeled, Vibratory And Tandem Rollers To Achieve The Desired Compaction As Per Morth Specification Complete In All Respectsas Per Referencetomort&H Specification 507Sn. 5.5Including All Material, Labour, Taxes But Excluding Gst 12 Supply And Laying Of 80Mm Thick Precast Cement Concerete I-Shape Interlocking Paver Blocks Isi Markconfirming To Is: 15658-2006 With Top Layer Of Minimum 5 Mm Thicknesshaving Plan Dimension 200X ( 160+120Mm ) Of O.P. Cement , Smooth High Gloss Finish, Skid Resistant; Manufactured From Rubber Moulds Through Vibro-Compression Mechanism. The Compressive Strength Of Concrete Paver Block Shall Not Be Less Than 35Mpaand Weight 4Kg Perincluding Cost Of Material, With A Blanket Layer Of 4.00Cm. Thick Fine Sand. Includinglabour, T & Petc Required For Proper Completion Of The Work As Directed By Engineer-In-Charge.Including All Material, Labour, Taxes But Excluding Gst 13 Cement Concrete With 4 Cm Gauge Approved Stone Grit, Coarse Sand & Cement In The Proportion Of 8:4:1 Including Supply Of All Materials, Labour, Tools & Plants Etc. Required For Proper Completion Of The Work. ( Si No 281 ) Including All Material, Labour, Taxes But Excluding Gst 14 R.C.C. Work With Cement, Approved Coarse Sand & 2 Cm Gauge Approved Stone Grit In Proportions Of As In Item 283 Above But In R.C.C. In 1:1½:3 ( Column And T-Beam ) Excluding Supply Of Reinforcement And Its Bending, But Including Its Fixing And Binding The Same With 24 B.W.G.G.I. Binding Wire And Including Necessary Centering And Shuttering Etc. And Supply Of All Materials, Labour, Tools & Plants Etc. Required For Proper Completion Of The Work Includingcost Of Binding Wire. The Rate Excludes Making Of Drip Course Which Shall Be Paid Extra.Including All Material, Labour, Taxes But Excluding Gst 15 Supplying, Fitting And Placing Hysd Bar Reinforcement In Sub-Structure Complete As Per Drawing And Technical Specifications Including All Material, Labour, Taxes But Excluding Gst 16 Providing Structural Steel For Super-Structure Complete As Per Drawing And Technical Specificationsincluding All Material, Labour, Taxes But Excluding Gst 17 M-150 Brick Work In 1:3 ( One Cement & Three Coarse Sand ) Mortar.In Foundation And Plinth Including Supply Of All Materials Labour, Tools & Plants Etc. Required For Proper Completion Of The Work ( Si No 307 ) Including All Material, Labour, Taxes But Excluding Gst 18 12 Mmthick Plaster With Cement And Fine Sand Of 1.25 Fineness Modules In 1:3 Over Brick Work Minimum Thickness Not To Be Less Than 1Cm. Including Supply Of All Materials, Labour, Tools & Plants Etc. Required For Proper Completion Of The Work. ( Si No 582 ) Including All Material, Labour, Taxes But Excluding Gst 19 Finishing Wall With Water Proof Cement Paint Of Approved Make And Quality On New Work With Two Coat To Give An Even Shade Including Supply Of All Materials, Labour, Tools & Plant Etc. Required For Proper Completion Of The Work. ( Si No 660+661 ) Including All Material, Labour, Taxes But Excluding Gst 20 Dismantling Reinforced Cement Concrete Including Stacking Of Materials As Dericeted By Engineer Inchargewithin A Distance Of 60 Meters.Al As Per S.I.No.694. Including All Material, Labour, Taxes But Excluding Gst 21 Excavation In Foundation In Ordinary Soil ( Loam, Clay Or Sand ) Including Lift Upto 1.50 M. And Lead Upto 30 M. And Including Filling Watering And Ramming Of Excavated Earth Into The Trenches Or Into The Space Between The Building And The Sides Of Foundation Trenches Or Into The Plinth And Removal And Disposal Of Surplus Earth As Directed By The Engineer-In Charge Upto A Distance Of 30 M.Si No. 251 ( A ) Including All Material, Labour, Taxes But Excluding Gst 22 Plain / Reinforced Cement Concrete In Open Foundation Complete As Per Drawing And Technical Specifications. ( M-15 ) M-15, Concret Requiredwithout Reinforced ( P.C.C ) Including All Material, Labour, Taxes But Excluding Gst 23 Plain / Reinforced Cement Concrete In Raft, Wall And Deck Etc. Complete As Per Drawing And Technical Specifications. ( M-30 ) R.C.C As Per Drawings Reinforcement Including All Material, Labour, Taxes But Excluding Gst 24 Supplying, Fitting And Placing Hysd Bar Reinforcement In Sub-Structure Complete As Per Drawing And Technical Specifications. ( For R.C.C Works ) Including All Material, Labour, Taxes But Excluding Gst 25 Finishing Wall With Water Proof Cement Paint Of Approved Make And Quality On New Work With Two Coat To Give An Even Shade Including Supply Of All Materials, Labour, Tools & Plant Etc. Required For Proper Completion Of The Work. ( Si No 660+661 ) Including All Material, Labour, Taxes But Excluding Gst 26 Back Filling Behind Abutment, Wing Wall And Return Wall Complete As Per Drawing And Technical Specification& Morth 710.1.4.Of Irc:78 & 2200. Including All Material, Labour, Taxes But Excluding Gst 27 Supply Of 1000 Mm Dia Np-3 Hume Pipe ( S&S Type ) Including All Material, Labour, Taxes But Excluding Gst 28 Laying Of 1000 Mm Dia Np-3 Hume Pipe ( S&S Type ) In Position ( Labour Only ) Including Labour And T&P Etc Required For Completion Of The Work ( Si. No. 10.27 ) , With Labour Cess Including All Material, Labour, Taxes But Excluding Gst 29 Fixing Of Joints In Hume Pipe 1000 Mm Dia With Juit And Cement Etc Including Cost Of All Material, Labour And T&P Etc. ( Si. 10.27 New Item ) With Labour Cess Including All Material, Labour, Taxes But Excluding Gst 30 Supply Of 350 Mm Dia Np-3 Hume Pipe ( S&S Type ) Including All Material, Labour, Taxes But Excluding Gst 31 Laying Of 350 Mm Dia Np-3 Hume Pipe ( S&S Type ) In Position ( Labour Only ) Including Labour And T&P Etc Required For Completion Of The Work ( Si. No. 10.27 ) , With Labour Cess Including All Material, Labour, Taxes But Excluding Gst 32 Fixing Of Joints In Hume Pipe 350 Mm Dia With Juit And Cement Etc Including Cost Of All Material, Labour And T&P Etc. ( Si. 10.27 New Item ) With Labour Cess Including All Material, Labour, Taxes But Excluding Gst 33 Sand Filling In Foundation Trenches As Per Drawing & Technical Specification. Including All Material, Labour, Taxes But Excluding Gst 34 Providing And Fixing Concertina Coil Fencing With Punched Tape Concertina Coil 600 Mm Dia 10 Metre Openable Length ( Total Length 90 M ) , Having 50 Nos Rounds Per 6 Metre Length, Upto 3 M Height Of Wall With Existing Angle Iron ‘Y’ Shaped Placed 2.4M Or 3.00 M Apart And With 9 Horizontal R.B.T. Reinforced Barbed Wire, Stud Tied With G.I. Staples And G.I. Clips To Retailhorizontal, Including Necessary Bolts Or G.I. Barbed Wire Tied To Angle Iron, All Complete As Per Direction Of Engineer-In-Charge, With Reinforced Barbed Tape ( R.B.T. ) / Spring Core ( 2.5 Mm Thick ) Wire Of High Tensile Strength Of 165 Kg / Sq. Mm With Tape ( 0.52 Mm Thick ) And Weight 43.478 Gm / Metre ( Cost Of M.S. Angle, C.C. Blocks Shall Be Paid Separately ) ( Dsr No 16.53 ) Including All Material, Labour, Taxes But Excluding Gst

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 27-02-2024 DATE Date 29-02-2024

Key Value

Document Fees
INR 2714 /-
EMD
INR 956000.0 /-
Tender Value
INR 4.78 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail