}

Tender For Various Work Under Deposit Scheme And Other Related Work Against Pkg. No. 334/2023-24 And 341/2023-24 Under Edd-I, Aligarh., aligarh-Uttar Pradesh

Government Departments has published Tender For Various Work Under Deposit Scheme And Other Related Work Against Pkg. No. 334/2023-24 And 341/2023-24 Under Edd-I, Aligarh.. Submission Date for this Tender is 29-02-2024. Electrification Work Tenders in aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42451235
Tender For Various Work Under Deposit Scheme And Other Related Work Against Pkg. No. 334/2023-24 And 341/2023-24 Under Edd-I, Aligarh.
Open Tender
Indian
Uttar Pradesh
Aligarh
29-02-2024

Tender Details

Various Work Under Deposit Scheme And Other Related Work Against Pkg. No. 334 / 2023-24 And 341 / 2023-24 Under Edd-I, Aligarh.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Roadincluding The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc Poles 8.5 Mtr. 3 St Poles 11 Mtr. 4 St Poles 13 Mtr. 5 Cartage Of Line Material Viz Cable, Conductor / Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps, Cable, Stone Pad & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective End, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 6 Erection Of Single Support / Tri Pole Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 7 Pcc / St Poles 8.5 / 11 / 13 Mtr. 8 Tri Pole. 9 Erection Of Double Pole On Following Poles Including The Work Of Complete Line As Per Respo Norm Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 10 Pcc / St Poles 8.5 / 11 / 13 Mtr. 11 ( A ) Erection & Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 12 ( B ) Providing And Fixing Of Stay Insulator. 13 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 14 Acsr Weasal Conductor. 15 Acsr Dog Conductor. 16 Drilling And Cutting Of Tee Off Channel, V Cross Arms, Top Channel, Cross Bracing Angle, Ms Garding Angle, Dropper Chanel, Stone Pad. As Per Specification Of Uppcl Construction Manual Including Including Loading And Unloading At The Both Ends. 17 Grouting Of Pcc / St Poles 8.5 / 11 / 13 Mtr. Long As Per Respo Norms 18 Making The Plinth Of St Poles. 19 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 20 Fixing Of Following Accessories:- 21 11 Kv Pin Insulator 22 11 Kv Disc Insulator 23 11 Kv V-Type Cross Arm 24 F-Bracket. 25 E-Bracket. 26 Providing / Fixing Of Missing Nut Bolts And Washer 27 Providing & Fixing Ofclamps Of Lt, Cross Arm Holding, F-Clamp, Stay Clamp, Danger Board Clamp With Nut & Bolts. 28 Filling Of 3X70 / 3X120 Sq.Mm. 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 29 Safe Carriageof 3X70 / 3X120 Sq.Mm.11 Kvxlpe Cable From Store Center To Respective Site Of Work Including Loading & Unloading At Both Ends For Proper Completion Of Work. 30 Laying Of 3X70 / 3X120 Sq.Mm. 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 31 Safe Carriage Of 11 Kv Pilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work Including Loading And Unloading At Both Ends. Average Distance Approx. 0 Km To 50 Km. 32 Erection & Grouting Of 11 Kv Pilfer Proof Metering Cubicle Making Connections With Bus Bar, Tapping With Empire Tape With Existing Earthing. The Above Work Includes The Cost Of Labour, T&P, Carrier & Material Etc. Required For Proper Completion Of Work Except Cost Of 11 Kv Vcbs. 33 Installation Of 11 Kv Ct-Pt Combined Metering Unit On Double Pole After Fixing Of Channel With M.S. Clamps And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1 / 8X1 Finally Connected To Earthing Rod Of Size 20Mm X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae ( M ) . The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. 34 Fixing Of 11 Kv Fuse Set As Per Respo Norms. 35 Safe Cartage Of 11 Kv Vcb From Store Center, Sarsol To 33 / 11 Kv S / Ss Madrak. 36 Errection And Instalation Of 11 Kv Vcb Including All Labour Out Going Incoming Connection With Bus Bar 11 Kv Cable Boxes Tapping With Empire Tape & H.T. Tape And Connecting With Earthing At 33 / 11 Kv S / S, Madrak. 37 Earthing Of 11 Kv Vcb Providing & Laying M.S. Earth Strip 50X6 Mm Including Welding Bending Etc. At 33 / 11 Kv S / S, Madrak. 38 Wearing Gi Pipe 6” Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply. 39 Fixing Of Danger Board With Clamp N&Bas Per Respo Norms.

Key Value

Document Fees
INR 1180 /-
EMD
INR 7100.0 /-
Tender Value
INR 7.03 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail