|
| 1 | CCTV SurveillanceSolution at 41 Junctions (As per RFP Specification) |
| 2 | Camera Type1 (Box/Bullet Camera Wide Range) with IR illuminator |
| 3 | Camera Type2 (PTZ Camera)- At Junctions with IR illuminator - (PTZ location assuming higher side at 3 lane junction-30, later may be reduce or interchange as per actual input by user/ police) |
| 4 | PTZ Joystick Controller |
| 5 | 6 Mtr Pole with Cantilever for Fixed Box Camera with Foundation |
| 6 | Std Pole for PTZ Camera Mounting with Foundation |
| 7 | Industrial grade manageable 8 port poe Switch |
| 8 | Junction Box |
| 9 | 1 KVA online UPS with 30min Backup |
| 10 | Site Infra (Civil Work i.e Trenching, Cable Laying, Cat6 Cable, Power Cable, GI/HDPE Pipe, Fiber) |
| 11 | Electricity Meter(58-41= 17 surplus) |
| 12 | Extra Item If need in this work (Only for providing rate for the items, not including in this work) |
| 13 | ATCS(30 three Arm Junction & 11 four arm Junction) -with using existing Traffic lights/Poles (As per RFP Specification) |
| 14 | ATCS Controller |
| 15 | Vehicle Detection DENSITY |
| 16 | Countdown timer (EN Certified) - Used Existing (1 per arm)QTY134 |
| 17 | Galvanized Cantilever poles - Used Existing (1 per arm) QTY 134 |
| 18 | Galvanized Standard Poles - Used Existing (2 per arm)QTY 134 |
| 19 | Traffic Light Aspects -Red - Used Existing (3 per arm)QTY 402 |
| 20 | Traffic Light Aspects - Green-Straight Arrow - Used Existing (3 per arm) QTY 402 |
| 21 | Traffic Light Aspect - Green Left Arrow - Used Existing (3 per arm) QTY 402 |
| 22 | Traffic Light Aspects - Green Right Arrow - Used Existing (3 per arm)QTY 402 |
| 23 | Traffic Light Aspects? Amber -Used Existing (3 per arm) QTY 402 |
| 24 | Pedestrian lamp heads? Stop Man - Used Existing (2 per arm) QTY 268 |
| 25 | Pedestrian lamp heads? Walk Man - Used Existing (2 per arm)QTY 268 |
| 26 | Junction Box - Used Existing (Per Junction) QTY 41 |
| 27 | Power Cable for Traffic Lights lumsum - Used Existing (Per Junction) QTY 41 |
| 28 | 1 KVA online UPS with 30 min Backup for ATCS Junction - Used Existing (1 Per Junction) QTY 41 |
| 29 | Traffic Enforcement - ITMS Hardware |
| 30 | RLVD System per lane ( Camera & Application) |
| 31 | ANPR system per lane (Camera, Application with IR illuminator ) Standard in city assume 2 Lane at each arm |
| 32 | LPU |
| 33 | Speed solution device based atHighways intersection i.e. Entry/ exist point - Total 16 Location as identified by User/ Ghaziabad Police Department |
| 34 | Speed Monitoring system with device |
| 35 | ANPR Camera with Application (assume 3 Lane) |
| 36 | Pole with cantilever along Switch, UPS with Junction Box |
| 37 | LPU |
| 38 | PA & ECB System |
| 39 | IP based PA System; Switchable, Multi Zone, PA Speakers, voip/Amplifier with Built-in Digital signal Processor (PA system location assuming higher side at 3 arm junction-30, later may be reduce or interchange as per actual input by user/ police) |
| 40 | ECB System (Emergency Call Box) |
| 41 | Cat 6 Cable |
| 42 | Power Cable |
| 43 | System software and Application licenses - Analytics for surveillance, Traffic (including AI) |
| 44 | DB License & Virtualization |
| 45 | Network Management System (NMS) or Enterprise Management System Software (Total Node Sensor Approx 3000+) |
| 46 | Video Management Software |
| 47 | Video Management Softwarewith failover |
| 48 | Video Traffic Analytics Software (including AI) |
| 49 | (nohelmet, Triple Riding, Wrong Way, No Parking, Red-Speed )These use case will be deployed on each ANPR Lane |
| 50 | Video Surveillance Analytics Software (including AI) |
| 51 | (Animal Detection, Smoke /Fire, Crowd Detection, littering,Help detection)Any three use cased will be deployed on each Surveillance Camera and Solid Waste surveillance Camera) (use case may vary)&ATCS Software - Central |
| 52 | RLVD License -Central |
| 53 | ANPR license – Central |
| 54 | Speed Detection Software(software+ License) - Central |
| 55 | E-Challan Application ?Central with NIC portal |
| 56 | Traffic Monitoring and Management System - Central |
| 57 | DB License & Virtualization |
| 58 | Video Summarization System (VSS) |
| 59 | Facial Recognition System (FRS) |
| 60 | Intelligent Video Analytics (IVA) |
| 61 | SOLID WASTE MANAGEMENT -ICT Enabled Solid Waste Management |
| 62 | Solid Waste Management Application Software Development and Commissioning of Integrated SWM Application (web/mobile Compatible), SMS integration, Geocoding/ Geofencing/ Survey of sites (Offices/ dumping grounds/stations/ bins), asset tracking including cameras, weigh bridge and MSI application for Project health checkup/audit and complain Redressal system. This is Master view for Staff and Administrators. |
| 63 | Dust bin tag/sensor RFID(Location /Qty may be change as per end-user input) |
| 64 | Dust bin Tracking System Web portal |
| 65 | Other Accessories (Electric and Network Cabling Infrastructure) |
| 66 | Integration with existing Weighbridge |
| 67 | Integration with all the solution in ICCC |
| 68 | Surveillance Camera (Bullet) for Weighing Points |
| 69 | Surveillance Camera (Bullet) for MRF |
| 70 | Surveillance Camera (Bullet) for Transfer Points |
| 71 | Std. Polefor Reader & camera with switch (8Port) & Junction box & UPS |
| 72 | Installation and Commissioning of above solution |
| 73 | Training Charges for Above Solution |
| 74 | Environmental Sensor |
| 75 | Environmental Sensor |
| 76 | EMS System web portal |
| 77 | Variable Messaging Board with Pole & Structure |
| 78 | Command Control Room (Hardware Component) |
| 79 | 70\" (diagonally) with LED Light Source complete configuration - Main Control Room (4X3) Cube (12 screen) |
| 80 | Video Wall Controller & Application |
| 81 | Workstations |
| 82 | IP Based MFP Printer |
| 83 | LED Screen |
| 84 | Video Conferencing System |
| 85 | Surveillance System (Camera) for Control Room for 8 CCTV with NVR solution |
| 86 | Biometric access control system |
| 87 | IP PBX with required license & System, ACD and Call &Recording license with system, IP Phones with 5 head set |
| 88 | UPS with 1 Hr Battery backup - 20 KVA |
| 89 | IP PA Console |
| 90 | Network Component (Servers in City Control Room) |
| 91 | L3 Switch 24port –Manageable |
| 92 | Routers |
| 93 | Core Switches |
| 94 | Firewall and IPS/IDS |
| 95 | 24 Core rack mounted LIU with all accessories including fibber, patch card etc. |
| 96 | Central antivirus security |
| 97 | Patch Cord (1 Mtr.) |
| 98 | Patch Cord (3 Mtr.) |
| 99 | 24 Port Patch Panel (Fully Loaded) |
| 100 | 42U Network Rack |
| 101 | Load balancer and ddos |
| 102 | Next Generation Firewall |
| 103 | KVM Switch |
| 104 | Cloud Infra |
| 105 | L3 Switch 24port –Manageable |
| 106 | Routers |
| 107 | ICCC Component |
| 108 | Integration (Surveillance, Solid-waste, ITMS, Environment & other internal application) |
| 109 | Application ICCC Integrated command and Control Center Application as per the RFP requirement |
| 110 | Hardware (Including Server + IT Infrastructure+Non-IT Infrastructure + Utilities etc.) |
| 111 | Control Room Infra & Network Connectivity |
| 112 | Furniture for Operator Desks |
| 113 | Furniture for Manager\"s Desk |
| 114 | Furniture for Meeting Table and Chairs |
| 115 | Furniture for Contact Center Operator Desks |
| 116 | Furniture for Security Room Desks |
| 117 | Furniture for \"Technical Support Team Desks |
| 118 | Furniture for War Room |
| 119 | VESDA/ Fire Alarm & Suppression System |
| 120 | Network Connectivity (Junction, Entry /Exit, and solid waste location network connectivity) |
| 121 | Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- Setup Cost |
| 122 | Internet Bandwidth at CC@30 Mbps for multi purpose use. Setup Cost |
| 123 | Row, Incremental Fiber Cost- Customer Scope |
| 124 | Onsite ( 5 Years) |
| 125 | O & M(5Yrs) Project Manpower (ITMS Expert, Surveillance Expert, Pantry Staff, Electrical and Plumbing Team) |
| 126 | Manpower Cost |
| 127 | Project Manager (5 Yrs) |
| 128 | CCC Manager (5 Yrs) |
| 129 | Solution Support Personnel at CCC (5 Yrs) |
| 130 | Operators (5+4+3) In three Shift (5 Yrs) |
| 131 | Initial Project Implementation Manpower (5 Yrs) |
| 132 | Disaster Recovery Centre (For 1 year) The Data will be directly stored on Cloud Server |
| 133 | Storage (only 100% for E- Challan) |
| 134 | Storage for Other Apps |
| 135 | Cloud Installation & Set-up (One time) |
| 136 | Network Cost for 5 Yrs |
| 137 | Network connectivity from field to CC ( Junction, Entry /Exit, and solid waste location)- for 5 yrs |
| 138 | Internet Bandwidth at CC@30 Mbps for multipurpose use - 5 Yrs |
| 139 | Extra Item If need in this work (Only for providing rate for the items, not including in this work) |