Bids Are Invited For Sitc Of 48 And 12 Core Optical Cable With Accessories 1 20 48- Core Single Mode,Ofc - Supply, Laying , Installation , Splicing, Testing And Commissioning Of 48-Core Single Mode Armoured Cable Supports 40G From Day 1 , 12- Core Single Mode, Ofc - Supply, Laying, Installation, Splicing, Testing And Commissioning Of 12-Core Single Mode Armoured Cable Supports 40G From Day 1 , 48- Port Loaded Liu - Supply, Laying , Installation, Testing And Commissioning 48 Port Liu With Loaded Sc -Lc Coupler And Adaptor Plates With Necessary Accessories , 12- Port Loaded Liu - Supply, Laying , Installation, Testing And Commissioning 12 Port Liu With Loaded Lc -Lc Coupler And Adaptor Plates Etc. With Necessary Accessories To Complete The Job , Single Mode 1.5M Pigtails - Lc Pc Single Mode Os2 1.5M Lszh Pigtails , Single Mode Patch Cord - Lc Pc-Lc Pc Single Mode Os2 3Mtrs Duplex Lszh Patch Cord , Hdpe Pipe Plb 40 Mm - 02 Nos. , Digging Soft - Hard Manual, - Min Depth 03 Feet For Soft And Min Depth 2 By 2.5 Feet For Hard , G.I. Pipe - Minimum 50 Mm, For Hard Area, Crossing Of Road With Cement Repair , Cemented Route Marker - In 50 Mtrs Distance , Laying Of Optical Fiber Cable Through Hdpe Pipe , Laying Of Hdpe Pipe Underground , Cemented Chambers With Covers, Size - L 2.5Ft X B 2.5Ft X D 2Ft , Bamboo Joint Enclosures 48-F With Necessary Accessories , Installation, Commissioning, Testing Of All Above Network Equipments, Components Including Splicing, Otdr Testing, Dressing, Shifting Of Material, Shifting Of Hdpe And Chambers At Working Location Etc Total Quantity : 40495