Tender For Disintegration Of Existing Hybrid Solar Power Plant And Conversion Including Supply, Installation, Testing, Commissioning Of The Same Into Ongrid Solar Power Plant At Different Mandi Yards Location., Lucknow-Uttar Pradesh
TDR : 42022768
Tender Notice
BOQ
Expired
Lucknow
Uttar Pradesh
Tender For Disintegration Of Existing Hybrid Solar Power Plant And Conversion Including Supply, Installation, Testing, Commissioning Of The Same Into Ongrid Solar Power Plant At Different Mandi Yards Location.
Name of Work: Disintegration of Existing Hybrid Solar Power Plant and Conversion including S/I/T/C of the same intoOngrid Solar Power Plant atDifferentmandi yards Location.
Sl. No.
Item Description
1
Solar Power Plant
2
S/I/T/C of On-grid smart inverter per KW with standard warranty (mention standard warranty period) along with one optimizer for every two PV module to track & monitor each PV moduleincluding MPPT Feature
3
Standard Warranty for On-grid inverter-12 years for Inverter, Extended warranty for On-grid invereter upto 20 years. Standard warranty for Optimizer- 25 years.
4
Labour charges for dismantalling of existing off grid solar plant (as per column no-3) per KW
5
Labour charges for Re-installation of solar plant per KW (without any accessories)
6
S/I/T/C of Balance of system-DCDB, ACDB, DC Cable, AC Cable per KW
7
S/I/T/C Net meter (with Requisite arrangements)
8
Transportation charges for relocation of solar panel from one location to another location per Kilometer. (Size up to 50 Kilowatt)
9
Avarage Salvage value of inverter per Kilowatt as per Sr. No.3
10
Avarage Salvage value of Battery per Kilogram as per Sr. No.3
11
Annual Operation & maintenance cost of ongrid solar plant per Kilowatt
12
S/I/T/C Solar Panel Polycrysteline (inlcuding structure) per KW
13
S/I/T/C Solar Panel Polycrysteline (exlcuding structure) per KW
14
Optional- Testing & submitting performance report of each solar panel (Poly crystalline solar module) at existing solar. Test report should inlcude below parameter after conducting test on each module: 1) I-V Curve Test for Solar System2) Max. Voltage (Vpm) at Pmax, Max. Current (Ipm) at Pmax3) Voltage at Open Circuit (Voc), Current at Short Circuit (Isc)4) Efficiency (%) Calculation of Solar System5) Temperature Measurement of Solar Panels6) Irradiance Measurement of Sun Light7) Series Resistance (Rs) Calculation of Solar Panels8) Conversion of I-V Curve under OPC to data under Standard Test Condition (STC) based upon IEC Standard9) Provide Operating Condition (OPC) and Standard Test Condition (STC) test reports for Verification of Solar Panel Performance (OK, or NO OK)
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.