Providing New Bore Well With Power Pumbat Ward No 6 Chettipalayam In Uthukuli Town Panchayat , Conducting Geophysical Survey, Quality And Quantity Test And Transportation Charges Etc., ( This Includes Labour Charges In The Field, Rent Of The Vehicle For Reaching The Place, Rent Of The Instrument And Excluding Charges For The Geologist) , Drilling Of 150 Mm Dia Deep Bore Wells In Overburden Soilincluding All Labour Charges For Insertion Of Casing Pipes And All Tools Are Plants Up To Causing Pipe , Drilling Of 180 Mm Diabore Wells In Hard Rock Areas Anywhere In Tamil Naduincluding Transportion To The Worksite In Hard Rock Areas And Developing The Bore Wells All Labour Charges And All Tools Are Plants , Supply And Delivery Of 180Mmpvc Casingpipeincluding Cost Of All Tools And Plants Etc Complete , Supply And Delivery Of 5Hp Submercible Motor 75Lpm X 225 M Head With Threephase As Per Is 8034 With Out Panel Board All Accessories Including All Charge Etc Complete. , Supply And Delivery Of 5Hpthree Phasepanel Board With Two Level Guard And Auto Start And All Accessories Including All Charge Etc Complete. , Supplying And Delivery Of 4 Sqmm Submersssible Pvc Insulated And Sheathed 3 Core Flat Type Copper Cable Is 694/1990 Including Cost Of All Materials To Site , Supplying And Delivery Of 50Mm Dia Upvc Pipe Including Costand Conveyancce Of All Materials To Site , Supply And Delivery Of Ms Kioskof Size 0.75Mx0.45Mx0.75M Made Up Ms Angle Of Size 50Mmx50mmx4mm Alround Covered With 16 Gauge Ms Sheet And Kiosk Door Made Up Of Ms Plate Of Size 25Mmx3mm Including Cutting, Welding, Grinding , Locking Arrange , Supply And Delivery Of 63 Mm Pvc Pipes Using 6 Kg/Cm2 Including Cost And Conveyance Of All Materials To Site. , Supply And Run Of 4 X 6 Sqmmpvc Insulated Sc Unsheathedn Cu.Conductor Of 1100V Grade On 7/20 Gi Bear Wire For Service Connection Mains Sd68 , Supply And Run Of 4X6 Sqmmpvc Insulated Sc Unsheathedn Cu.Conductor Of 1100V Grade 32Mm Gi Pipe Suitable Bent At Both Ends With Necessary Angle On Upright And End Supportformains Sd 73 , Earth Work Excavation And Depositing On Bank With Initial Lead Of 10 Meters And Initial Lift Of 2 Meters In Hard Stiff Block Cotton Hard Red Earth Murrains, Gravel, Stony Earth Mixed With Small Size Boulders And Hard Gravel Soil Etc., Complete As Per Standard Specification (Ss 20B) , Plain Cement Concrete 1:4:8 Mix (One Cement And Four Sand And Eight Aggregate) Including Cost Andusing 40Mm Metal Including Cost And Conveyance Of All Materials To Site And All Labour Charges Etc., Complete Complying With Standard Specification. , Supplying And Erecting Centering To Sides And Soffits Including Supports And Strutting With Necessary Including Cost And Conveyance Of All Materials To Site. Complete As Per Standard Specification , Plain Cement Concrete 1:3:6 Mix (One Part Cement, Three Part Sand And Six Part Of Aggrigate) 20 Mm Size Iss Hbg Metal From Approved Quarry Including Cost And Conveyance Of All Materials To Site. , Loweringpvc Rigid Pipes And Specials To Trench And Laying To Proper Gradient And Alignment Jointing With Pvc Couplers With Cement Paste And Testing To The Required Pressure Including Conveyance Of Water For Filling During Testing Etc., Complete Complying With Standard Specification. , Refilling With Excavated Excess Earth Work Including All Labour Charges Etc., Complete Complying With Standard Specification. , Labour Charges For The Erection Of Submersible Pumpset In Borewell Including Fixing And Jointing Submersible Cable With Proper Clamps Upto The Starter To Required Depth And Also Fixing Of Riser Pipes To The Required Depth Valves Erection Clamps, Pressure Gauges Upto The Exterior Wall Of Pump Room And Erection Of Panel Board Consisting Of Tnicn Switches Starter, Voltmeter,Ammeter, Three Pilot Lamps Capacitor Single Phasing Preventor, Water Level Guard And Laying And Jionting The Cables Andtwin Earthing As Per Ie Rules., Complete And Testing The Pumpset And Trail Run For 10 Days. , Exterior Emulsion Paint Two Coats With Good Quality Of Approved Emulsion Paint Including Cost Of All Materials To Site And All Labour Charges For Mixing Applying And Proper Curring Etc., Complete As Per Standard Specifications