}

Tender For Unit Iv Esp Overhauling Work Stage Ii Sgtpp Wbpdcl In May 2024, sagardighi-West Bengal

West Bengal Power Development Corporation Limited has published Tender For Unit Iv Esp Overhauling Work Stage Ii Sgtpp Wbpdcl In May 2024. Submission Date for this Tender is 21-02-2024. Cleaning Work Tenders in sagardighi West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

41881246
Tender For Unit Iv Esp Overhauling Work Stage Ii Sgtpp Wbpdcl In May 2024
Open Tender
NCB
West Bengal
Sagardighi
21-02-2024

Tender Details

Tender For Unit Iv Esp Overhauling Work Stage Ii Sgtpp Wbpdcl In May 2024- 1 Dry cleaning work: Dry cleaning of ESP starting from ESP inlet funnel to ESP outlet funnel , all ESP hoppers, Gas distribution Screens, all emitting electrodes and collecting plates and other allied zones. Suspension zone in between CERM/EERM Frame and ESP ceiling to be checked and cleaned properly. After desynchronization of Unit, all hopper dooors (288 Nos.) are to be opened for smooth removal of ash and after completion of total overhauling job, all hopper manholes has to be boxed up by replacement of new gasket replacement (100%).Stipulated Period of Work: Day-2 to Day-4- 04 Number of separate manpower gangs to be egngaged for working at a time in 04 ESP Passes. Report to be submitted to department by 4th day evening or 5th day morning 2 Water washing work : HP Water Jet washing ofESP internals (71 nos Fields), including all hoppers, collecting plates, emitting electrodes and other allied zones. At the time of water washing if any chocking found in the hoppers, the choking shall be cleared immediately. All arrangements including hose and booster pump having discharge pressure of 4-5 Kg/sq.cm for the job will be in partys scope. Suspension zone in between CERM/EERM Frame and ESP ceiling to be checked and cleaned properly. Stipulated Period of Work: Day-3 to Day-9 - 02 separate groups of manpower should be working at a time round the clock strictly to finish within stipulated time. Each day Job progress and simultaneous checking report to be submitted within 48 Hrs of Unit De-sync and simultaneous information to party sufficient number HP Hose and 04 number HP Pumps must be available at site for working at a time from 04 different Water outlet points. 3 Internal checking & rectification work: Field gauging of each Collecting Plate to maintain a gap of 400 mm by Go Gauge (71 nos of ESP fields in A, B, C & D Path).Job to be carried out by specialized separate manpower ,experienced to perform identical job at ESP. Re-fitting of new spacers if required. Stipulated Period of Work: Day -6 toDay-20 -Simultaneous work to go on in 02 passes at a time by two separate expert team. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 4 CERM system: Checking and rectification of Collecting rapping system of all the ESP fields thoroughly. Replacement/Fitting of missing components / Repair & Alignment of rapping shafts, bearings, Pin wheel, hammer assembly of all the rapping mechanism, if required after checking forESP Fields .Rectification/Replacement of shock Pad, Anvil Bar and corresponding fasteners, Shock Bar Guide Plate, Guide angle, PL attachments of Rapping and non-rapping sides. Stipulated period of Work: Day -6 to Day-20 - Simultaneous work to go on in 02 passes at a time by two separate expert team. These teams are separate than the manpower engaged in field gauging job. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 5 EERM System: Checking and rectification of Emitting rapping system of all the ESP fields thoroughly. Replacement /Fitting of missing components/ Repair & Alignment of rapping shafts, bearings, Pin wheel, thurst pad,bottom bearing, hammer assembly of all the rapping mechanism, if required after checking forESP Fields. Stipulated Period of Work: Day -6 toDay-20 -Simultaneous work to go on in 02 passes at a time by two separate expert team. These teams are separate than the manpower engaged in field gauging job. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority 6 GDRM System : Checking and rectification of GD Screen rapping system thoroughly. Replacement / Repair & Alignment of rapping shafts, bearings, hammer assembly of all the rapping mechanism, if required after checking. Stipulated Period of Work: Day -10 to Day-16 -Simultaneous work to go on in 02 passes at a time. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 7 Shaft insulator system: Replacement / Repair & Cleaning of Shaft Insulator and its Heater. Proper box up after the job with gasket replacement if found damaged. Cleaning of shaft insulators to be done in 02 phases (after water washing and again before final box up by petrol). Stipulated Period of Work: Day -8 to Day-18 - Thorough cleaning by petrol washing to ensure full dryness. Separate group of electrician is to be engaged. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 8 Support insulator system: Replacement / Repair & Cleaning of Support Insulator and its Heater. Proper box up after the job with gasket replacement if found damaged. Cleaning of shaft insulators to be done in 02 phases (after water washing and again before final box up by petrol).Stipulated Period of Work: Day -8 to Day-18 - Thorough cleaning by petrol washing to ensure full dryness. Separate group of electrician is to be engaged. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 9 Hopper heater: Hopper heater. Replacement / Repair & Cleaning of Hopper Heater. Checking and repairing of heater jackets for any ash accumulation and damage followed by repairing of the same. Stipulated Period of Work: Day-10 to Day-20. Same electrician group to be engaged as for Support & Shaft insulators. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 10 Guide vane: Checking, Repair/Replacement and strengthening of Guide Vane of ESP Inlet Duct. Stipulated Period of Work: Day-4 to Day-15- A separate/dedicated group of manpower to be engaged for the job apart from the groups working inside the ESP. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 11 CERM ,EERM & GDRM Gearboxes : CERM,EERM & GDRM Gear Boxes. Lubrication of Collecting and Emitting rapping motor and its gearbox. Stipulated Period of Work: Day - 18 to Day-22.Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 12 Insulation Testing of ESP Fields : Meggaring of ESP Fields. After completion of aforesaid jobs, Meggaring of each field to be carried out until it comes to its desired value.Stipulated period of Work:From Day-22 to till desired result is achieved. 13 ESP TR sets: The entire Transformer # Rectifier units should be checked thoroughly and cleaned body only including checking of oil level and changing of silica gel depending upon the condition then.Stipulated Period of Work: Day -18 to Day-22.Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 14 HV Safety Bkrs/Disconnecting Switches : Alignments of all the safety breakers, 72 Nos. (1 for each field) should be checked & rectified. These must also be cleaned. All Pin Insulators (216 Nos) along with copper tubes to be checked cleaned and if required replaced. All Disconnecting switch boxes door rubber gasket replacement is mandatory and to be supplied by SgTPP authority. Stipulated Period of work: Day -8 to Day-18.Through cleaning by petrol wash to ensure full dryness. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 15 ESP MCC panels: All the MCC panels (LTMSB-A,B,C & D) of ESP fields & its ACP (A,B,C & D) Panels, HD & TB Panels also the EC Panels (72 nos), including 11 KV/ 415V Dry type Transformers (08 Nos.) to be cleaned & tightness checked. Stipulated period of Work: Day-12 to Day-16. Strictly electrician group having adequeate knowledge of electrical switchgear system to be engaged for the job.Report to be furnished with megger value on Day-17 itself.ESP MCC panels: All the MCC panels (LTMSB-A,B,C & D) of ESP fields & its ACP (A,B,C & D) Panels, HD & TB Panels also the EC Panels (72 nos), including 11 KV/ 415V Dry type Transformers (08 Nos.) to be cleaned & tightness checked. Stipulated period of Work: Day-12 to Day-16. Strictly electrician group having adequeate knowledge of electrical switchgear system to be engaged for the job.Report to be furnished with megger value on Day-17 itself. 16 ESP manhole doors: Inspection and repair of all manhole Doors of A-path, B-path, C-path & D-path by replacement of Door sealing gasket for 100% doors. Stipulated Period of Time: Subject to completion of above mentioned jobs. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 17 Painting work: Painting of all outdoor equipments of ESP.(Gear Boxes, Doors, Disconnecting Switch Boxes, Shaft & Support Heater enclosures). Surface preparation by manual cleaning, de-rusting by Sand paper etc, then applying one coat of Bison H/B zinc phosphate primer + two coats of synthetic enamel finish paint (Make-Berger paints). The job has to be completed as directed by concerned departmental representative. 18 Repairing of Gas Distribution Screen: Repairing of Gas Distribution Screen based on report after checking. Repairing / Replacement to be done by necessary scaffolding which is under the Scope of Party. Inspection and patch repair of gas distribution box nozzles at the inlet funnel of ESP. Fabrication and replacement of nozzles of gas distribution box is limited to 20 Nos. Stipulated period of Work: Within Day 21. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 19 Checking and calibration of all Ash Level Indicators (ALI) are to be done. If required, ALI to be replaced (total # 144 nos.).Along with RF type probe checking and replacement if required. Stipulated period of Work: Within Day-24-Separate group of electrician to be engaged for the job.Report to be furnished within Day-24 itself. 20 Any type of fabrication job: To set right the ESP internal and leakage rectification of ESP Roof Top and ESP Wall to resist water and air ingress in ESP if required, are also within the scope of the party. Stipulated Period of Work: Within-Day-22. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority. 21 ESP Hopper Repairing Job : If any damage to hopper body/door, internal found for all 144 number ESP Hoppers, required rectification to be done. Stipulated Period of Time: Within day 23. Each day finding report and simultaneous rectification report to be submitted. Rectification job to be strictly carried out as per reports/findings of expert engaged by departmental authority.

Key Value

Document Fees
Refer document
EMD
INR 26852.0 /-
Tender Value
INR 13.42 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail