| 1 | Construction of 6.00mmx6.00mx3.00m high pump house with RCC framestructure with 230cm thbrick wall,Hollow M S rectangular/square trusses with 0,50 mm th PPG sheeting roof covering,PCC floor, incl internal and external finishes and electrification complete all as per drg and specification. |
| 2 | Construction of RCC M-20 under ground sump 100000 ltr capacity complete incl inlet, outlet,overflow,washout pipe with necessary gate valve and water level indicater all as shown and specified in drg. |
| 3 | Construction of RCC M-20 under ground sump 50000 ltr capacity complete incl inlet, outlet,overflow,washout pipe with necessary gate valve and water level indicater all as shown and specified in drg. |
| 4 | Supply, Installation and testing of centrifugal multistagepumpset \"Kirloskar\" 20 HP 3Ph,415 Volts, 50 Hz and 2900 rpm wih PCC foundation, suction and delivery pipe as require with suitable control panel |
| 5 | Supply, Installation and testing of centrifugal multistagepumpset \"Kirloskar\" 10 HP 3Ph,415 Volts, 50 Hz and 2900 rpm wih PCC foundation, suction and delivery pipe as require with suitable control panel |
| 6 | Supply ,Installation and testing star deltafully automatic stater with 3Ph 100Amp online changeover mounted on M S framework suitable for 20 HP 3Ph pump set. |
| 7 | Supply ,Installation and testing star deltafully automatic stater with 3Ph 63Amp online changeover mounted on M S framework suitable for 10 HP 3Ph pump set. |
| 8 | Supply and laying flat three core water proof PVC insulated sheathed copper conductor submerssible cable 10 sqmm Havelles/Finolex/KEI |
| 9 | Supply & Laying of one number 3.5 core 70 sqmm PVC insulated and PVC sheathed / XLPE steel stripsarmoured power cable of 1.1 KV grade of following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required. |
| 10 | Providing and fixing 100 mm bore M grade G.I. pipes complete with G.I. fittings including trenching and refilling etc incl taking out unserviceble pipe and staking at engr storeyard. |
| 11 | Supply,installation and testing Iron Removal Plant complete wwith pressure filter,carbone chamber,air compressor,bleaching dozzer with backwash facility incl RCC fdn & PCC platform and testing treatedwater of capacity 5000 gallon/Hr. |