Providing Fhtcs By Laying Pipe Line Along National Highway Side And Road Restoration-Pipeline Work; 1 Supply 2 100.98.239:Supply Of Pvc Pipe, 10Kg / Cm2, 160Mm Dia. 3 100.98.237:Supply Of Pvc Pipe, 10Kg / Cm2, 110Mm Dia. 4 100.98.236:Supply Of Pvc Pipe, 10Kg / Cm2, 90Mm Dia. 5 100.98.212:Supply Of Pvc Pipe, 6Kg / Cm2, 75Mm Dia. 6 100.98.211:Supply Of Pvc Pipe, 6Kg / Cm2, 63Mm Dia. 7 Od241279 / 2023-2024:Add 3% Of Pvc Specials 8 100.98.446:Supply Of Ci Air Valve, Conforming To Is 14848 - 2000, Double Orifice Type Ds2, Size 50Mm. 9 100.98.440:Supply Of Ci Air Valve, Conforming To Is 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25Mm. 10 100.98.469:Supply Of Ci Double Flanged Sluice Valve Conforming To Is 14846 - 2000, Sluice Valve With Cap Pn 1.0, Size 80Mm. 11 Working Charge 12 15.2.1:Demolishing Cement Concrete Manually / By Mechanical Means Including Disposal Of Material Within 50 Metres Lead As Per Direction Of Engineer - In-Charge.Nominal Concrete 1:3:6 Or Richer Mix ( I / C Equivalent Design Mix ) 13 15.43.2:Dismantling Manually / By Mechanical Means Including Stacking Of Serviceable Material And Disposal Of Unserviceable Material Within 50 Metres Lead As Per Direction Of Engineer -In-Charge:Bituminous Road 14 Od237319 / 2023-2024:Dismantling Stone Pitching And Stacking The Materials At Convenient Place Including Labour Etc. Complete 15 100.1.1:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50M, In All Kinds Of Soil. 16 100.1.5:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M, In Ordinary Rock. 17 100.2.7:Excavating Trenches Of Required Width For Pipes, Cables, Etc., Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc., And Disposing Of Surplus Excavated Soil As Directed, Within A Lead Of 50M, In Medium Rock Where Blasting Is Prohibited. 18 100.9.11:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 160 Mm Nominal Outside Diameter Pipes. 19 100.9.9:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 110 Mm Nominal Outside Diameter Pipes. 20 100.9.8:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 90 Mm Nominal Outside Diameter Pipes. 21 100.9.7:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 75 Mm Nominal Outside Diameter Pipes. 22 100.9.6:Laying Upvc Pipes Of Class 2 To Class 6 And Specials, Lowering To The Trenches Already Made, Placing In Position Aligning The Pipeline To The Lines And Levels And Jointing The Pipes And Specials With Solvent Cement And Testing The Pipeline With Water To The Required Test Pressure ( Excluding Cost Of Pipes And Specials ) : 63 Mm Nominal Outside Diameter Pipes. 23 100.8.1:Fencing One Side Of Trenches, 1.50M Height With Two Rows Of 10Cm Plastic Caution Tape In Vertical Casuarina Pole ( Girth 15Cm To 24Cm ) Fixed At 2M Intervals. 24 16.73:Dry Stone Pitching 22.5 Cm Thick Laid In Courses And Required Profile With Hammer Dressed Stones Having No Side Less Than 15 Cm, With Minimum Depth Of 20 Cm Including Preparing The Bedding Surface Etc. All Complete ( Payment For Stone To Be Made Separately ) 25 Od239543 / 2023-2024:Alteration Of Connection To The Proposedpvc Line From The Replacing Line 26 18.12.7:Providing And Fixing G.I. Pipes Complete With G.I Fittings Including Trenching And Refilling Etc. External Work65 Mm Dia Nominal Bore 27 18.12.6:Providing And Fixing G.I. Pipes Complete With G.I Fittings Including Trenching And Refilling Etc. External Work50 Mm Dia Nominal Bore 28 100.31.1.1:Conveying And Fixing C.I. Sluice Valves ( With Cap ) By Providing Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of The Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 80Mm Diameter, Class I. 29 Od255501 / 2023-2024:Supplying And Fixing 150Mm Ci Surface Box Embeded With Rcc Slab Size 0.6X0.6X0.15 And 160Mm Or Above Size Pvc 10Kg / Cm2 Pipe Actiong As Protection Tube With Including All Cost Of Conveyance , Labour Charges Etc.Complete. 30 100.32.1:Conveying And Fixing C. I. Single Acting Air Valve Of Approved Quality With Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of Air Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 25Mm Single Acting Air Valve. 31 100.32.3:Conveying And Fixing C. I. Double Acting Air Valve Of Approved Quality With Bolts, Nuts, Rubber Insertions Etc., Complete, But Excluding The Cost Of Air Valve ( Tail Pieces, If Required, Will Be Paid Separately ) : 50Mm Double Acting Air Valve. 32 100.47.1.5:Leak Rectification Work In 75Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earthwork Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Remaining Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe To The Site, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Any Available Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Without Causing Any Damages To The Existing Utilities And Refilling The Trenches Using Excavated Earth In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Watching, Ribbon Fencing, Traffic Controlling Etc., Complete As Per The Direction Of Departmental Officers Including The Cost Of Pipe And Upvc Specials; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: All Socketed Jointing. 33 100.47.2.2:Leak Rectification Work In 110Mm Upvc ( Class 2 To 6 ) Pipeline Including Detecting And Locating Leak, Earth Work Excavation In All Kinds Of Soil For Exposing Leak Portion Of The Pipe Including Tar Cutting / Concrete Cutting, Cutting The Pipe Diametrically Perpendicular To The Axis Of Pipeline Without Causing Any Damages To The Balance Portion, Dismantling And Lifting The Pipe From Trenches, Smoothening The Cut Ends, Conveying The New Pipe, Cutting And Lowering New Pipe Into The Trenches, Placing In Position, Aligning The Pipe To Line And Level And Jointing The New Pipe With The Existing Pipe With Solvent Cement Or Repairable Joint And Testing The Pipeline By Operating The Valves Concerned, And Rectifying The Defects If Noticed And Refilling The Trenches In Layers Not Exceeding 20Cm Depth Including Consolidating Each Layers By Ramming, Watering, Charges For Removing Surplus Soil From Work Site, Without Causing Any Damages To The Existing Utilities, Including Hire For Tools And Plant, Conveyance Of Tools And Materials, Bailing Out Water, Providing Caution Boards, Lighting, Ribbon Fencing, Watching, Traffic Control Etc., Complete As Per The Direction Of Departmental Officers, Including The Cost Of Pipe & Specials But Excluding The Cost Of C.I.R. Joints; Upvc Pipes And Specials Shall Be Of Good Quality And Conforming To Relevant Standards: Socket & C.I.R. Jointing. 34 Od241368 / 2023-2024:Interconnection Of 400Mm Di And 75Mm Pvc Including Excavation, Necessary Specials And Labours 35 Od250598 / 2023-2024:Interconnection Of 300Mm Di To 160Mm Pvc Pipe, Including The Cost Of Fabricated Saddle 36 4.1.3:Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level:1:2:4 ( Cement : 2 Coarse Sand ( Zone-Iii ) : 4 Graded Stone Aggregate 20 Mm Nominal Size ) 37 House Connections 38 100.60.13.1.2:Providing 15Mm ( 1 / 2 Inch ) House Connection With 15Mm Water Meter From Existing Pvc / Hdpe Mains Up To 110 Mm Dia., Up To A Length Of 5M Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression / Gm / Brass Specials Viz. Brass Ferrule, Brass Hexagonal Nipple, Gm Full Way Wheel Valve, Bend, Mta, Fta, Couplers, Pvc Service Saddle Of Suitable Size Etc. And Connecting With The Mains, Testing The Joints Etc. Complete Including Trenching And Refilling In All Kinds Of Soil Up To A Depth Of 1.50M For Main Line Tracing And Trench Of Average Cross Section 0.3M X 0.75M For Laying Connection Pipe And Service Pipe, Fixing Water Meter, Lighting, Watching, Providing Caution Boards, Traffic Control Etc. Complete Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges, Including The Cost Of Tested Class B Multijet Water Meter With Isi Mark And Weather Resistant Pp / Pe Meter Box Of Minimum Size 300Mm X 200Mm X 150Mm, But Excluding Charges For Cutting The Concrete / Tarred / Bituminous Roads Etc, And As Per The Direction Of The Departmental Officers. 39 100.60.15.1.1:Providing Additional Length Of House Connection Pipe Using 20 Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pn16 Specials And Testing The Joints Etc., By Trenching And Refilling In All Kinds Of Soil With Trench Of Average Cross Section 0.3M X 0.75M For Laying Of Connection Pipe And Service Pipe, Lighting, Watching, Providing Caution Boards, Traffic Control Etc., Including Cost Of Materials, Hire For Tools, Cost Of Consumables And Labour Charges Etc. Complete, But Excluding The Cost Of Cutting Of Concrete / Tarred / Bituminous Roads Etc., And As Per The Directions Of The Department Officers. 40 Od237422 / 2023-2024: Providing And Fixing Water Tap Post Using 75 Mm Pvc Pipe 41 100.60.12.3.1:Providing 15Mm Pvc Tap In The Water Meter Assembly For 15Mm Connection, Using 20Mm Indian Standard Class 6 Upvc Pipes And Specials Including Cost Of Materials, Consumables, Hire Charges For Tools And Labour Charges Etc. Complete And As Per The Direction Of Departmental Officers. 42 100.60.22.1.1:Providing 15Mm ( 1 / 2 Inch ) Gm Check Valve In The Water Meter Assembly For 15Mm Water Connection, Using 20Mm ( 1 / 2 Inch ) Pe Pipe, Pe80, Pn16, Conforming To Is 4984: 2016 Or Later Edition And Pp Pn 16 Compression Specials Including Cost Of Materials, Consumables, Hire For Tools And Labour Charges Etc. Complete And As Per The Directions Of The Department Officers. 43 Road Restoration 44 3.5.3:Excavation In Soil Using Hydraulic Excavator And Tippers With Disposal Upto 1000 Mexcavation For Roadwork In Soil With Hydraulic Excavator Of 0.9 Cum Bucket Capacity Including Cutting And Loading In Tippers, Trimming Bottom And Side Slopes, In Accordance With Requirements Of Lines, Grades And Cross-Sections, And Transporting To The Embankment Location With A Lift Upto 1.5 M And Lead Upto 1000 M As Per Technical Specification Clause 302.3 45 4.1.A.1:Granular Sub-Base With Well Graded Material ( Table 400.1 ) ( A ) By Mix In Place Methodconstruction Of Granular Sub-Base By Providing Well Graded Material, Spreading In Uniform Layers With Motor Grader On Prepared Surface, Mixing By Mix In Place Method With Rotavator At Omc, And Compacting With Smooth Wheel Roller To Achieve The Desired Density, Complete As Per Technical Specification Clause 401. ( I ) For Grading I Material 46 4.9:Wet Mix Macadamproviding, Laying, Spreading And Compacting Graded Stone Aggregate To Wet Mix Macadam Specification Including Premixing The Material With Water At Omc In Mechanical Mixer ( Pug Mill ) , Carriage Of Mixed Material By Tipper To Site, Laying In Uniform Layers In Sub-Base / Base Course On A Well Prepared Sub-Base And Compacting With Smooth Wheel Roller Of 80 To 100Kn Weight To Achieve The Desired Density Including Lighting, Barricading And Maintenance Of Diversion, Etc As Per Tables 400.11 & 400.12 And Technical Specification Clause 406.By Mechanical Means With 1 Km Lead 47 5.1.1A:Prime Coat :- Low Porosityproviding And Applying Primer Coat With Bitumen Emulsion ( Ss-1 ) On Prepared Surface Of Granular Base Including Cleaning Of Road Surface And Spraying Primer At The Rate Of 0.70-1.0 Kg / Sqm Using Mechanical Means As Per Technical Specification Clause 502 48 5.2.3A:Tack Coat Providing And Applying Tack Coat With Bitumen Emulsion ( Rs-1 ) Using Emulsion Distributor At The Rate Of 0.25 To 0.30 Kg Per Sqm On The Prepared Granular Surfaces Treated With Primer & Cleaned With Hydraulic Broom As Per Technical Specification Clause 503. 49 5.12.A.3.2A:Seal Coat - Manual Means - Type C - Bitumen S-65Providing And Laying Seal Coat Sealing The Voids In A Bituminous Surface Laid To The Specified Levels, Grade And Cross Fall Using Type A, Type B And Type C As Per Technical Specification Clause 510A. By Manual Means :- Case - Iii : Type C ( Ii ) Bitumen ( S-65 ) 50 5.9.1.2A:20Mm Thick Open-Graded Premix Carpet Using Bituminous ( Penetration Grade / Modified Bitumen ) Binder - Bitumen S-65Providing, Laying And Rolling Of Open-Graded Premix Carpet Of 20 Mm Thickness Composed Of 13.2 Mm To 5.6 Mm Aggregates Either Using Penetration Grade Bitumen Or Emulsion To Required Line, Grade And Level To Serve As Wearing Course On A Previously Prepared Base, Including Mixing In A Suitable Plant, Laying And Rolling With A Three Wheel 80-100 Kn Static Roller Capacity, Finished To Required Level And Grades To Be Followed By Seal Coat Of Either Type A Or Type B Or Type C As Per Technical Specification Clause 508.Case - I By Manual Means ( Ii ) Bitumen ( S-65 )