Construction Of Burial Ground At Nemmeli Street And Nemmeli Mettu Street , Earth Work Excavation In All Classes Of Soils Such As Hard Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Ordinary Earth, Earth Mix With 50% Fair Sized Boulders Etc., With Initial Lead And Lifts Including Laying, Spreading, Leveling, Sectioning Breaking Clods Etc., Includingall Incidental Charges Etc., Complete As Per Standard Specification . For Foundationsss 20B , Cement Concrete Of Mix 1:4:8 ( One Cement Four And Eight Aggregates ) Using 40Mm Gauge Hard Broken Including Cost Conveyance Of All Materials To Site Including Labour Charges, Transporting And Placing In Position Including Shoring, Strutting Forming Protective Bunds, Cofferdams Bailing Out Of Water Labour For Mixing Compacting, Finishing And Curing, Working At Depths, Tools And Plants And Incidental Charges Such As Sheeting, Shoring And Bracing And Their Subsequent Removal Etc., Complete As Per Standard Specification. , Supplying & Erecting Centering For Sides & Soffiots Including Necessary Supports & Strutting Upto 3.29M Height For Plane Surfaces In All Floors With All Cross Bracings Using Mild Steel Sheets Of Size 90 X 60Cm & 10 Gauge Stiffened, Welded With Steel Angle Of Size 25 X 25 X 3Mm For Boarding Laid Over Silver Oak Joists ( Country Wood ) Of Size 10 X 6.5Cm Spaced @ About 90Cm C / C And Supported By Casurina Props Of 10 - 13Cm Dia. Spaced @ 75Cm C / C Etc., Complete Complying With Standard Specifications And As Directed By The Departmental Officers. Rate For 10M2.For The Following Items. ( Rcc Floor Slab, Roof Slab, Rectangular / Square, Tee / Ell Beams, Lintels, Staircase Waist Slabs, Landing Slabs, Landing Beam, Portico Beam Etc., ) . , Rcc1:1½:3 ( One Cement One Point Five Sand And Three Aggregates ) Mix Using 20Mm Gauge Hard Granite Broken Stone Jellyin All Rcc Works Connected To The Work Excludingshuttering , Centering And Cost Of Reinforcement Grills Butincludingcuring , Finishingetc Complete With Standard Specification And As Directed By Engineer Incharge. , Supplyingandfabrication Of Steel And Placing In Position Ms / Ribbed Tor Steel Grills For Rcc Works As Per Design Given Including Cost Of Steel And Gi Binding Wire In Floors Etc, . Complete Complying With Standard Specification In Force And As Directed By Department Officials.- , Brick Work In Cm 1:5 ( One Part Of Cement & Five Parts Of Sand ) Mix Using Third Class Country Brick Kiln Burnt Bricks 8 ¾ X 4 ¼ X 2 ¾ Including Cost And Conveyance Of Materialsto Work Site And Including All Labour Charges For Mixing, Laying, Curing The Concrete Etc., Complete As Per Standard Specifications And As Directed By Departmental Engineers –Tnbp No:31 , Plastering Walls With Cement Mortar 1:5 ( One Cement Five Sand ) 12Mm Thick In All Floors And All Exposed Surfaces Including Cost And Conveyance Of Materials To Site And All Labour Charges, Curing Etc Completeand As Directed By Department Officials.. , Painting Two Coats With Ready Mixed Plastic Emulsion Paint S.I.358 Plastic Emulison Paint Ofapproved Quality And Colour Over A Priming Coat, Including Thoroughscraping, Clean Removal Of Dirt, Etc Complete And Including Necessary Plaster Of Paris, Putty, Wherever Required Including Cost And Conveyance Of All Materials Etc.And All Lobour Charges Etc.Complete As Per Standard Specification And As Directed By The Departmental Officers. Tnbp No:66-A. , Supplying And Fixing Of M.S Grill Of Approved Design For Doors, Windows And Ventilators Using Necessary Mild Steel Flats For Inner And Outer Memebers Which Should Be Fixed To Window Frames Inclusive Of Priming Coat Of Best Approved Quality Red Oxide Primer Etc., Complete Complying With Standard Specifications.