Upkeepment Of Conveyors And Its Related Equipments In Conveyor-43, 46, Rc-1, Bfd-9A&9B And Pc-1A & 1B.-1 200 Activit Ies Charges For Clearing The Spillage Coal On Walkway Return Side Under The Belt To The Entire Length Of The Conveyor, Deck Sheet, Head End And Tail End Of The Conveyor-43, 46, Rc-1, Bfd-9A & 9B And Primary Crusher Floor Including Hire Charges For T&P Etc., Complete. As Per Price Bid 2 6 Nos Charges For Assisting Work For Providing Belt Joint In Slope Conveyor43, 46, Bfd-9A&9B, Rc-1 Including Arresting The Belt By Providing Clamps, Lifting The Counter Weight, Dismantling The Idlers And Idler Frames And Skirt Board Assembly And Refixing The Same After Vulcanizing The Joint Including T&P Hire Charges And Cost Of Consumables Etc., Complete. As Per Price Bid 3 6 Nos Charges For Assisting Work For Pulley Lagging Works In Conveyors-43, 46, Rc-1 Bfd-9A & 9B Including Arresting The Conveyor Belt Lifting The Counter Weight And Normalizing The System After Pulley Lagging, Trial Operation Including T&P Hire Charges And Cost Of Consumables Etc., Complete. As Per Price Bid 4 8 Operations Charges For Overhauling And Inspection Of Pulley Bearings And Replacement If Necessary In Tail Pulley / Tail Snub Pulley / Bend Pulley And Take Up Movable Pulley In Conveyors-43, 46, Bfd-9A&9B, Rc-1 Including Arresting The Conveyor Belt, Lifting The Counter Weight And Normalizing, The System After Bearing, Overhauling, Trial Operation Including The Cost Of Consumables And T&P Hire Charges Etc., Complete. As Per Price Bid 5 8 Operations Charges For Overhauling And Inspection Of Pulley Bearing And Replacement If Necessary In Head Pulley / Head Snub Pulley / Drive Pulley In Conveyors 43, 46, Bfd-9A & 9B And Rc-1, Including Arresting The Conveyor Belt, Lifting The Counter Weight And Normalizing, The System After Bearing Overhauling, Trial Operation Including The Cost Of Consumables And T&P Hire Charges Etc., Complete. As Per Price Bid 6 4 Operations. Charges For Overhauling And Inspection Of Resilient Coupling In Conveyors43 & 46 And Including Arresting The Conveyor Belt, Lifting The Counter Weight, Dismantling The Resilient Coupling, Arranging For Inspection, Removal Of Old Grease, Cleaning The Gear Teethes, , Packing The New Grease And Normalizing The System, Trial Operation Including The Cost Of Consumables And T&P Hire Charges Etc., Complete.