|
| 1 | Assembling of a 4000 pump motor set at Phularitand feeder breaker premises by fitting of rotating shaft, impeller, long bush, check-nut & housing complete jobs. |
| 2 | Transporting of 4000GPM Pump motor set with baseplate from feeder breaker to Jarlahi sump |
| 3 | Installation of the Pump, Motor & baseplate on the platform of ground level with proper alignment including fitting of coupling belt & greasing packing of the pump |
| 4 | Dismantling, transporting & fitting of suction of the pump |
| 5 | Dismantling, transporting & fitting of 12\"/10\"dia Nipple, 10\"dia M.S.Bend, 10\"dia shortpiece in the delivery side of the Pump |
| 6 | Dismantling, transporting, laying & jointing of 10\"dia M.S. Pipe in the delivery 66Nos.×20\"=1320ft |
| 7 | Dismantling, transporting, laying & jointing of 8\"dia M.S. Pipe in the delivery26Nos.×20\"=520ft |
| 8 | Vertically laying & jointing of 8\"dia M.S. Pipe in the proposed range 08headx06shift=48head |
| 9 | Dismantling, transporting & fitting of 10\"dia hose for jointing of delivery |
| 10 | Dismantling, transporting & fitting of sluice valve & N.R. valve |
| 11 | PVC cable laying, hanging & shifting from pole to starter & starter to the motor in the pump |
| 12 | Providing of bolt & nut with washer |
| 13 | Fabrication & fitting of matching piece of 10\"dia M.S. pipe in the delivery |
| 14 | Fabrication & making of 10\"dia M.S. bend |
| 15 | Fabrication & making of 10\"dia Taper pipe |
| 16 | Fabrication & making of 8\"dia M.S. bend |
| 17 | Fabrication & making of 8\"dia Taper pipe |
| 18 | Providing of rubber joints |
| 19 | Alignment of pump motor set & commissioning the pump |
| 20 | Total impact of GST for the purpose of CTC |