Fixing Of Labour Rate Contract For Carriage, Erection, Testing And Commissioning For Creation Of 25 / 63Kva Sub Stations, Laying Of 11Kv Ht Line And Laying Of Lt Line On 8 Mtr Long St Poles In Jurisdiction Of Electric Division Jpdclreasi”- 1 Rate contract for Laying of LT Line on 8 meter ST Pole using ACSRConductor (1P, 2P, 3P) (Material to be provided by the Corporation) 2 Erection of ST Pole 8.0 Mtr long (ST 410 SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. 3 Fixing of GI M-Clampwith Shackle Insulators (16KN Polymer/Porcelain) along withNuts & Bolts of sorts 4 Laying and stringing of ACSR Squirrel/Weasel Conductor through insulators including proper binding & twisting with soft Aluminium Wire. 5 Painting of 8.0 mtr long ST poles with two coats ofAl. Paint for smooth surface. 6 Fixing of Galvanised Stay setwith 50x8mm stay clamp, Guy Insulator (2 Nos), Anchor Plate (200x200x6mm) nuts and Bolts, 2Nos Turn Buckles, 1.8 long, 16mm diameter solid GS Stay rod & 7/3.15mm dia GI Standard wire complete 7 Rate contract for Laying of 11KV Line on 8 meter ST Pole using ACSR Weasel Conductor (Material to be provided by the Corporation) 8 Erection of ST Pole 8.0 Mtr long (ST 410 SP15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. 9 Fixing of GI V cross-arm with top Bracket including clamp and GI Channel X-arm includingclamps, braces, nuts bolts etc. 10 Laying and stringing of ACSR Weasel Conductor on Cross arms through insulators including proper binding & twisting with soft Aluminium Wire. 11 Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 12 Fixing of 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 13 Fixing of Galvinized Nuts and Bolts 14 Painting of 8.0 mtr long ST poles with two coats ofAl. Paint for smooth surface. 15 Fixing of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete. 16 Fixing of Earthing complete by G.I pipe 40mm or G.I rod 20mm 2.5mtr long through GI strip/chemical earthing 17 Cement bottoming1:2:4 mix as per standards 0.45cum/Pole (cement and other material to be provided by the contractor) 18 Labour Rate Contract for Erection, Testing and commissioning of 25KVA/63KVA Distribution substation(Material to be provided by the Corporation) 19 Erection of 11/0.433KV, 3-phase 25 KVA/63KVA Distribution Transformer with Bimetallic Terminal Connectors Energy Level-2, (Aluminium wound) and with LV cable box having detachable Aluminium Gland plate 20 Erection of Steel TubularPole 9.0 Mtr long (ST-410 SP-33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc. including painting of poles with two coats ofAl. Paint for smooth surface. 21 Fixing of Gapless Surge Arrestor, 9kV, 10kA, LA with polymer housing, Station type 22 Fixing of 11KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, vertical type 23 Fixing of 11kV Horn Gap Fuse set 3-phase, 200 Amp 24 Fixing of 50/70/95sqmmsingle core cable, 1.1kv grade, PVC insulated stranded conductor FRLS type 25 Fixing of 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 26 Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5KNLighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm 27 Fixing of GI Channel/Angle/Flat ofdifferent sizes including clamps 28 Fixing of Galvanised Nuts & Bolts 29 Fixing of Earthing of substation - Excavation of earthing pit of dia 650mm & depth 3000mm, installation of Earthing pipe of 40mm nominal bore & 4mm wall thickness & length 2.5 mtr long as per IS 1239. GI strip for neutral earthing of size 25mm x 3mm for connection of transformer body, GO set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials./Chemical Earthing 30 Fixing of 32/63 Amp TPN Switch Disconnector Fuse Unit /LT fuse unit 31 Fixing of LT distribution Box for 25/63KVA DTR with MCCB for incomer and SFUs for outgoing Circuits 32 Cement bottoming of 9.0 Mtr long (ST-410 SP-33)in 1:2:4 mix 0.5cum/Pole (cement and other material to be provided by the contractor) 33 Manual Carriage Charges 34 ST Pole 8 mtr long (ST 410 SP15) 35 Manual carriage of pole from unloading site to site of work upto first 100Mtr. 36 Manual carriage of pole to site of work for every subsequent 50Mtr after first 100 Mtrs. 37 ST Pole 9 mtr long (ST-410 SP-33) 38 Manual carriage of pole from unloading site to site of work upto first 100Mtr. 39 Manual carriage of pole to site of work for every subsequent 50Mtr after first 100 Mtrs. 40 For Distribution Transformer 41 Carriage of 11/0.4KV Distribution transformer upto first 50Mtr. 42 Carriage of 11/0.4KV Distribution transformer for every subsequent 50Mtr. 43 For Sundry/Line material iterms 44 Manual carriage of Line material upto first 100Mtr. 45 Manual carriage of line material for every subsequent 50mtrs after first 100mtr.