Execution Of Work And Supply Of Building Material Under The Work Of Sr To Conservation Of Chote Khan And Bade Khan Tomb Mubarakpur, Hauz Khas-Ii, New Delhi , Conservation Work , R R Stone (Size 0.45X 0.30X 0.25) Or As Per Site Requirments. , U/ S Lime (Rajgarh/ Katni)(In Proper Airtight Packing) , Surkhi Best Quality (Well Brunt Brick) Free From Clay/Silt/Organic Matters/Foreign Matters/Etc.) , Coarse And Superior Quality (Free From Clay/Silt/Organic Matters/Foreign Matters/Etc.) , Belgiri (Dry Fruit) , Gur/ Sheera Good Quality , Gum (White) Best Quality , Molasses , Brick Agg 20Mm N/S (Free Fromforeign Materials.) , Brick Zira (Well Graded) , Provision For Fixing Of Steelness Steel Jaali With Wooden Frame In Ventilator & Opening With Fixing Of Teak Wood Batten Frame & Fixing Ss Jaali 50Mm X 25Mm In 304 Grade Including All Necessary Fitting I.E. Nils, Fevicol, And Battens With Labour Complete , Providing & Fixing Red Sandstone Parnala With Fine Chisel Of Stone In U Shape And Fixing In The Outlet Of The Terrace For Rain Water Including Fixing With All Labour & Material Etc Complete. (Size Of Parnala 1.20X0.30X0.15M) , Steel Work In Built Up Tubular (Round, Square Or Rectangular Hollow Tubes Etc.) Trusses Etc., Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer, Including Welding And Bolted With Special Shaped Washers Etc. Complete.Hot Finished Seamless Type Tubes , Designing, Fabricating, Testing, Installing And Fixing In Position Curtain Wall With Aluminium Composite Panel Cladding, With Open Grooves For Linear As Well As Curvilinear Portions Of The Building , For All Heights And All Levels Etc. Including (A) Structural Analysis & Design And Preparation Of Shop Drawings For Pressure Equalisation Or Rain Screen Principle As Required, Proper Drainage Of Water To Make It Watertight Including Checking Of All The Structural And Functional Design (B) Providing, Fabricating And Supplying And Fixing Panels Of Aluminium Composite Panel Cladding In Pan Shape In Metalic Colour Of Approved Shades Made Out Of 4Mm Thick Aluminium Composite Panel Material Consisting Of 3Mm Thick Fr Grade Mineral Core Sandwiched Between Two Aluminium Sheets (Each 0.5Mm Thick). The Aluminium Composite Panel Cladding Sheet Shall Be Coil Coated, With Kynar 500 Based Pvdf / Lumiflon Based Fluoropolymer Resin Coating Of Approved Colour And Shade On Face # 1 And Polymer (Service) Coating On Face # 2 As Specified Using Stainless Steel Screws, Nuts, Bolts, Washers, Cleats,Weather Silicone Sealant, Backer Rods Etc. (C) The Fastening Brackets Of Aluminium Alloy 6005 T5 / Ms With Hot Dip Galvanised With Serrations And Serrated Washers To Arrest The Wind Load Movement, Fasteners, Ss 316 Pins And Anchor Bolts Of Approved Make In Ss 316,Nylon Separators To Prevent Bi-Metallic Contacts All Complete Required To Perform As Per Specification And Drawing The Item Includes Cost Of All Material & Labour Component, The Cost Of All Mock Ups At Site, Cost Of All Samples Of The Individual Components For Testing In An Approved Laboratory, Field Tests On The Assembled Working Curtain Wall With Aluminium Composite Panel Cladding, Cleaning And Protection Of The Curtain Wall With Aluminium Composite Panel Cladding Till The Handing Over Of The Building For Occupation. Base Frame Work For Acp Cladding Is Payable Under The Relevant Aluminium Item.S The Contractor Shall Provide Curtain Wall With Aluminium Omposite Panel Cladding, Having All The Performance Characteristics All Complete , As Per The Architectural Drawings, As Per Item Description, As Specified, As Per The Approved Shop Drawings And As Directed By The Engineer-In-Charge. However, For The Purpose Of Payment, Only The Actual Area On The External Face Of The Curtain Wall With Aluminum Composite Panel Ladding (Including Width Of Groove) Shall Be Measured In Sqm. Upto Two Decimal Places. , Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:2:4 (1 Cement : 2 Coarse Sand (Zone-Iii) Derived From Natural Sources : 4 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources) , Laying Kota Stone Slab Flooring Over 20 Mm (Average)Thick Base Laid Over And Jointed With Grey Cement Slurry Mixed With Pigment To Match The Shade Of The Slab,Including Rubbing And Polishing Complete With Base Of Cement Mortar 1 : 4 (1 Cement : 4 Coarse Sand) 25 Mm Thick , Providing & Fixing Water Connection With Lead 100 Mtr Cpvc Pipe 3 Heavy Quality For Drain Water , Pvc Socket 3 , Pvc Band 3 , 25Mm Cpvc Pipe Ft , 25Mm Socket, Elbow, Tee & Solochan Etc , Pvc Water Tank 500 Liters , Ball Cock (Well Reputed Company Cera/ Jagua/Etc.) , Tank Nipple (Set) , Gate Wall , Push Type Bib Cock , Labour Charges For Plumbing Work , Providing & Fixing Electric Cabel From Panel To Drinking Water Cooler & R. O. Point With Switches, Socket & All Fittings Etc Complete 16Mm Flexible Copper Wire 3 Core Isi Marked For Light Connection From Pannel Board To Drinking Water Cooler Point , 4 Sqm Flexible Copper Wire (Roll) , 2.5 Sqm Flexible Copper Wire (Roll) , Mcb With Box 63 Amp Two Way , Switchboard With 4 Switch & 1 Socket , Power Point With Switch & Socket (Set) , Pvc Pipe 2 , Screw, Pvc Tape, Cfl Tube Light Etc , Labour Charges For Electric Work , Removal / Disposal Of Malba By Manually/ Mechanical Transportation 25 Km To 30 Km Upto Dumping Ground Etc Complete , Purchasing Of Essential Articles For Required During The Execution Of Work Pvc Bucket (Standard Size) , Pvc Mug (Standard Size) , Pvc Water Tank 500 Liters , Wire Brush , Pvc Pipe 1.25 (Roll , Cane Basket , Pvc Pan (Tasla , Manilla Rope 1.25 Dia , First-Aid Box With Medicine , Pvc Helmet Heavy Quality , Safety Belt Heavy Quality , Pvc Plastic Sheet , Bamboo Ladder 20Ft , Bamboo Challi 10Ft X 1.50 Ft With Solid Bamboo , Pvc Gum Boot (Pair) , Green Net Cloth , Supply Of Loading Cycle Rickshaw With Wooden Body For Carriage Of Material From Workshop To Site , Cartage , Provision For Hiring Charges Of Concrete Mixture Machine For Making Of Lime Concrete & Lime Plaster During The Execution Of Work From Time To Time With Diesel & Mixture Machine Operator Etc Complete , Provision For Making Of Lime Tank & Water Tank For Slaking Of Lime & Mortar With Earthwork, Cement Concrete & Brickwork Around Tank & Partition Of The Tank Etc Complete. (Size Of Tank 2Nosx3.00X2.00X0.60)(A) Earth Work In Excavation By Mechanical Means (Hydraulic Excavator)/ Manual Means Over Areas (Exceeding 30 Cm In Depth, 1.5 M In Width As Well As 10 Sqm On Plan) Including Getting Out And Disposal Of Excavated Earth Lead Upto 50 M And Lift Upto 1.5 M, As Directed By Engineer-In?Charge Hard Rock (Requiring Blasting , (B) Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:2:4 (1 Cement : 2 Coarse Sand (Zone-Iii) Derived From Natural Sources : 4 Graded Stone Aggregate 40 Mm Nominal Size Derived From Natural Sources , (C) Brick Work With Common Burnt Clay Modular Bricks Of Class Designation 7.5 In Foundation And Plinth In Cement Mortar 1:4 (1 Cement : 4 Coarse Sand) , (A) Detailed Documentation & Site Including Fundamental Drawing Of Architectural Members Of Pathway , B) Photo Documentation Before, During & After Conservation Work