|
| 1 | 3000A ,3P,3W AL conduct Sandwich bus duct |
| 2 | 90 Deg Edge & Flat Elbow |
| 3 | Phase Cross Over |
| 4 | Wall Frame assembly |
| 5 | End Flange for sandwich bus duct |
| 6 | Adopter Box for sandwich bus duct |
| 7 | TINNED Aluminium Flexible for sandwich bus duct |
| 8 | Copper Flexible for sandwich bus duct |
| 9 | Rubber Bellow at panel & DG End |
| 10 | Steel structure with hardware’s(Fixing Brackets and Steel support) |
| 11 | VISIT CHARGES TO SITE |
| 12 | SUPERVISION CHARGE FOR SANDWICH BUSDUCT |
| 13 | 2500A ,3P,3W AL conduct Sandwich bus duct |
| 14 | 90 Deg Edge & Flat Elbow |
| 15 | Phase Cross Over for Sandwich bus duct |
| 16 | Wall Frame assembly for Sandwich bus duct |
| 17 | End Flange for sandwich bus duct |
| 18 | Adopter Box for sandwich bus duct |
| 19 | TINNED Aluminium Flexible for sandwich bus duct |
| 20 | Copper Flexible for sandwich bus duct |
| 21 | Rubber Bellow at panel & DG End |
| 22 | Steel support structure with hardware’s |
| 23 | VISIT CHARGES TO SITE |
| 24 | SUPERVISION CHARGE FOR SANDWICH BUSDUCT |
| 25 | 2500A ,3P,3W AL conduct Sandwich bus duct |
| 26 | 90 Deg Edge & Flat Elbow |
| 27 | Phase Cross Over for Sandwich bus duct |
| 28 | Wall Frame assembly for Sandwich bus duct |
| 29 | End Flange for sandwich bus duct |
| 30 | Adopter Box for sandwich bus duct |
| 31 | TINNED Aluminium Flexible for sandwich bus duct |
| 32 | Copper Flexible for sandwich bus duct |
| 33 | Rubber Bellow at panel & DG End |
| 34 | Steel support structure with hardware’s |
| 35 | VISIT CHARGES TO SITE |
| 36 | SUPERVISION CHARGE FOR SANDWICH BUSDUCT |
| 37 | SITE MODIFICATION MATERIAL @1% OF TOTAL EXWORKS FOR SL NO 1 TO 13 [Rating: NA] as per Tech Spec No:SBD-TS-CPBG-FGD-TUT, REV-00[Unit Rate (at Column 13) to be quoted including P&F Charges and Freight Charges upto destination and Freight Charges (%) to be mentioned in unpriced Price Bid Format] |