Tender For Supply Of Equipment / Material, Design, Erection, Testing & Commissioning For Sop Tonagar Panchayat Jawali For Dumping Site At Jawali By Providing 11 / 0.4Kv 25Kva Sub Station A / W Ht And Lt Linein Electrical Section Jawali Uesd Jawali ( Ts No. 133 / 2023-24 ) -11 Kv Ht Line 2 Prov. Acsr ( 6 / 1 / 3.35, 50 Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } 3 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) 4 Prov. Muffs With Concerete Filling 5 X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 6 Go Switch Handle Supporting: [ Channel Iron ( 75X40x5 Mm ) , Length : 460 Mm 7 Cross Arm: [ Channel Iron ( 100X50x6 Mm ) , Length: 1270 Mm I / C Tolerance Of 100 Mm Either Side ) 8 Angle Iron ( 50X50x6 Mm ) , Length: 750 Mm X 2 No. X 8 Structures 9 Pole Top Bracket [ Msci:100X50x6 Mm- 100 Mm ] 10 Prov. & Fabrication Of Belt Set - Ms Angle Iron: 50X50x6, Length :1800 Mm & X-Bracing Set - Ms Angle Iron: 50X50x6, Length: 2125 Mm Fordoub. Pole Str. I / C Clamp ( 2 No. Per Set ) 11 Prov. X-Arm ( Horizontal ) - Ms Channel Iron: 100X50x6, Length: 2340 Mm X 2 No. ] ? Formation 12 Prov. Pin Insulator With Gi Pin 13 Prov. Disc Insulator Set Cleave & Tounge Halicaly Formed Fitting 14 Prov. Go Ab Switch Unit ( 11Kv, 400A, ) O / D Type ( Prov. By Hpsebl ) 15 Prov. D.O Fuse Unit 16 Prov.Stay Set Complete Ht I / C Egg 17 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 7.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 18 Prov. Ht Earthing Set Complete 19 Prov. Gi Wire 8 Swg. ( Prov. By Hpsebl ) 20 Prov. Half Clamps: [ On Double Pole Dead End Structure: 4 No; On Run Thro Structure: 2 No ] 21 Prov. Full Clamps: [ On Double Pole Dead End Structure: 4 No, Single Pole Run Thro Structure: 2 No ] 22 Prov. Danger Plate ( 250X200x1.6 Mm ) ( Prov. By Hpsebl ) 23 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 24 Prov. Barbed Wire 25 Prov. Aluminium Paint 26 Erection Of 9 Mtr. St Pole Single Structure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 27 Erection Of 9 Mtr. St Pole Double Structure I.E. Digging Of Pit, Fixing Of Insulator, X-Arms, K.B. Set, Top Clamp, Barbed Wire, Danger Plate, Drilling Of Holes And Filling Of Pit + Rammingcomplete In All Respect. 28 Erection Of Stay Set Ht I.E. Digging Of Pit, Fixing Of Stay Road, Filling Of Pit, Nozzeling & Tightning. 29 Erection Of Ht Earthing Set Complete 30 Erection Of G.O. Switch 400 Amp. Comp. 31 Fixing Of Jumper 32 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 33 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding ( Single Wire Per Km ) . 34 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.100 Km ) 35 25 Kva Trsanformer 36 Prov. Distribution Transformer ( Ordinary ) , 11 / 0.4 Kv, 25 Kva 37 Prov. Steel Tubular Poles ( 9 M, Working Load > 200 Kgf / M² ) 38 Prov. Muffs With Concerete Filling 39 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Incomer Line 40 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X1 Nos For LaS 41 Prov. X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] For Supporting Do Fuse Unit & Go Switch 42 Prov. Transformer Bed, Belting & Knee Bracing 43 Prov. X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 44 Prov. X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : ( 460Mm ) X 2 Nos For Supporting Main Channel Of Transformer ] 45 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 46 Prov. Ms Angle Iron ( 35X35x5 Mm ) , Length : ( 460 ) X 2 Nos 47 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 950 Mm ) X 2 Nos For Bed Knee Bracing 48 Prov. Transformer Lt Distribution Box And Go Switch Fixing Assembly 49 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 50 Prov. Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X 1 Nos 51 Prov. Go Switch Handle Supporting: [ Channel Iron ( 75X40x6 Mm ) , Length : 460 Mm 52 Prov. Go Ab Switch Unit ( 11Kv, 400A, 25 Ka ) Tripple Pole O / D Type ( Prov. By Hpsebl ) 53 Prov. D.O Fuse Unit 54 Prov. Lighting Arrester, 9 Kv Station Class ( Porcelain Type ) 55 Prov. Discs Insulator Sets ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90 Kn ) Including Dead End Clamps Etc. ) 56 Prov. Stay Set Complete 57 Prov. Stay Wire ( 7 / 3.15 Mm ) ( 6.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 58 Prov. Pipe Earthing Set 59 Prov. Lt Distribution Panel Box Withmccb 40 Amp 3P 35Ka , Ics =100 % Icu, Kit-Kit 200 Amp For 25 Kva Dtr ( Prov. By Hpsebl ) 60 Prov. Half Clamp ( M.S. Flat 50X6 Mm ) 61 Prov. Full Clamps ( M.S. Flat 50X6 Mm ) 62 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 63 Prov. Aluminium Thimble ( Prov. By Hpsebl ) 64 Prov. Aluminium Thimble ( Prov. By Hpsebl ) 65 Prov. Danger Plate ( Prov. By Hpsebl ) 66 Prov. Barbed Wire 67 Prov. Lt Cable ( 3.5 Core ) 95 Mm² 68 Prov. Energy Meter 3-?, 4 Wire Ct Operated Static Tri-Vector Meter With Box ( Ct-100-200 / 5A ) ( Prov. By Hpsebl ) 69 Prov. Aluminum Paint. 70 Prov. Prov. 6 / 1 / 3.35, 50Mm² 71 Prov. Transformer Structure Chain Link Fencing , Angle Iron , Gate Etc & Protection Plinth ( Civil Work As Per Hpsr ) . 72 Erection Of 100 Kva S / Stn. I.E. Digging Of Pit For Pole & Earthing Two No. Poles & 3 Nos. For Earthdrilling Of Holes In X-Arms, Preparation Of Plateform Str. Members C.I., A.L. I.E. X-Arms & K.B. Set, Errection Of D / P, Concreating Of Rcc Muff Errection Of Plateform, Errection Of X-Arms, D.O., L.A., Mccb, Switch Lt Box, Energy Meter, Errection Of Transformer, Earthing Connection To G.O. Switch, Transformer L.A. Etc., Errection Of Stay Set, Jumper, Pipe Earthing 3 Nos Set, L.T. Cable, Barbed Wire And Painting Complete In All Respect. 73 Prov. Transportation Charges & Mannual Carriage Of 25 Kva Pole Mounted Distribution S / Stn. 74 3-Ph Lt Line 75 Prov. Aaac ( 7 / 3.15 50Mm² ) { Neutral Conductor Including 1% ( Sag, Jumpering And Wastage } 76 Prov. Steel Tubular Poles ( 8 M, Working Load > 180 Kgf / M² ) 77 Prov. Rcc Muffs 78 Prov. C.I. X-Arm ( 600X75x40 ) I / C Clamp 79 Prov. Stay Set L.T. I / C Egg & Clamp ) . 80 Prov. Stay Wire ( 7 / 3.15 M ) ( 6.0 Kg Per Stay Set ) ( Prov. By Hpsebl ) 81 Prov, Full Clamp 82 Prov. Gi Wire ( Prov. By Hpsebl ) 83 Prov. D.I. Iron 84 Prov. Shackle Insulator. 85 Prov. Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16 Mm F Or More ( With Flat And Spring Washers ) ] 86 Prov. Aluminium Paint 87 Prov. Spiral Pvc Spacers ( Prov. By Hpsebl ) 88 Erection Of St Pole 8 Mtr. Long , Digging Of Pit, Errection Of X-Arm, Shackle Insulator, Filling Of Pit , Painting Of Pole & Ramming With Concerete Filling Of Rcc Muff 89 Erection Of L.T. Stay Set I.E. Digging Of Pit, Fixing Of Stay Road, Noseling & Titening. 90 Sagging Of Conductor I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 91 Sagging Of Gi Wire I.E. Laying, Stringing And Sagging & Binding With Insulator ( Single Wire Per Km ) . 92 Mannual Carriage Of Material 1 Km Ht Line Considering Average Distance From Road To Site Of Work ( 0.060 Km ) 93 Office Chair For Esd Jawali And Ed Jawali Office 94 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.