Supply, Installation, Testing And Commissioning Of Various Electrical Items/Equipments For Lighting Arrangement At Bakshi Stadium For 26Th January 2024 (Republic Day Function) - (Esd-Rajbagh, Ed2nd)- 1 Supply of 70 mm² 3½ Core Cable, 1.1 kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type 2 Laying (surface/wall laying without earth excavation), Testing, Commissioning of 25/70 mm² 3½ Core Cable, 1.1 kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type (Cable shall be Supplied by Division/Agency) 3 Supply of 25 mm sq 2 core Aluminium unarmoured Cable 4 Laying (surface/wall laying without earth excavation), Testing, Commissioning of 25 mm sq 2 core Aluminium unarmoured Cable (Cable shall be Supplied by Division/Agency) 5 Supply, Installation, Testing, Commissioning of 1.5 mm sq FRLS Copper Wire of standard make 6 Supply, Installation, Testing, Commissioning of 2.5 mm sq FRLS Copper Wire 7 Supply, Installation, Testing, Commissioning of 4 mm sq FRLS Copper Wire 8 Supply of 120 watt or higher wattagepressure die cast alumnium Flood light (Havells/Syska/Crompton/Bajaj/Philips or equivalent) 9 Installation, Testing, Commissioning of 110/120/130 watt LEDFloodlights using binding wire clamps etc (LED Luminaries shall be Supplied by Division/Agency) 10 Supply and Fixing of Self Adhesive PVC Electrical Insulation Tape 1.80 cm x 7 m x 0.125 mm (ISI Mark) 11 Supply and Fixing of Aluminium Thimbles of sizes 25 to 95 mm sq 12 Supply of 63 Amp MCB DP with Enclosure Box with proper glands 13 Installation, Testing, Commissioning of 63 Amp MCB DP with Enclosure Box with proper glands (Material shall be Supplied by Division/Agency) 14 Installation, Testing, Commissioning of 100 Amp MCCB TPN (Material shall be Supplied by Division) 15 Installation, Testing, Commissioning of 200 Amp Change Over (Material shall be Supplied by Division) 16 Providing and Laying of Earthing of DG sets and Change Over using GI Spike Rod and suitable wiring 17 Supply, Installation, Testing, Commissioning of Extension Cord having 3 sockets, 1 switch and 1 indicator fixed with 4 mm sq copper wire 5 meter long and 16 Amp top 18 Supply and Fixing of Nuts, Bolts and washers of sizes 19 Supply and Fixing of 15 Watt LED Bulb along with Pandent Holder 20 Supply of 25 mm dia Flexible Pipe 21 Laying of 25 mm dia Flexible Pipe with proper holding arrangement/saddles 22 Supply and Fixing of Ties for holding of cable (1pack=100 No.) 23 Supply, Installation, Testing, Commissioning of 3 Pin Top 16 Amps 24 Supply of Saddles for holding cables/conduits (1pack=100 No.) 25 Supply of 32 Amps MCB SP 26 Installation, Testing, Commissioning of32 Amps MCB SP (Material shall be Supplied by Division/Agency) 27 Supply of 16 Amps MCB SP 28 Installation, Testing, Commissioning of 16 Amps MCB SP (Material shall be Supplied by Division/Agency) 29 Providing of skilled man-power for operation/maintaining smooth functioning of DG sets (DG sets available at site) 30 Dismantling of materials after conclusion of event and returnable to Divisional Store at Bemina