|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 300 cm measured at a height of 1 metre above ground level and removal of rubbish upto a distance of 50 metre, outside the periphery of the area cleared. |
| 2 | Repairing to plaster i/c cutting & the patch in propershape & preparing the surface of the wall complete:- (a) With cement mortar 1:4 (1 cement: 4 fine sand) |
| 3 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. up to floor five level excluding cost of centering,shuttering, finishing and reinforcement : 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,staircases and spiral stair cases up to floor five level excluding the cost of centering,shuttering, finishing and reinforcement, with : 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size). |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeThermo-Mechanically Treated bars |
| 6 | 2nd class (local first class) brick work in foundation and plinth in cement mortar 1:4 (1 cement: 4 coarse sand) |
| 7 | Steel work welded in built up sections, framed work in cutting, hoisting, fitting in position & priming coat of red lead paint . In gratings, framed guard bars, ladders, railings, brackets and similar works. |
| 8 | Finishing walls with water-proofing cement paint of approved quality on new work (three or more coats) to given shade. |
| 9 | Painting (two or more coats) with synthetic enamel paint of approved quality of black or chocolate colour on wood work to give an even shade. |
| 10 | Providing form works i/c centering and shuttering so as to give a rough finish, strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ reinforced concrete and plain concrete work in Columns, pillars, posts and struts (square, rectangular or polygon in plan). |