Tender For Creation Of 250 Kva Sub Station At Kanuyan Dhara- Erection of 11 KV (HT) Line(Note: For detailed specifications please refer attached SBD which forms a part of the tender) 2 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles (410, SP-15) with pit excavation. (As per recommended IS/REC Standard) 3 G.I Channel/Flat/Angle in shape of Fabricated X-arm Top Bracket, Angle Braced, Clamp etc. 4 Supplying and fixing of 11 kV Pin Insulators (polymer) with Pins ( 5 KN) (As per recommended IS/REC Standard) 5 Supplying and fixing of 11 kV Disc Insulators (polymer) Complete with fittings (45KN) depending upon conductor size. (As per recommended IS/REC Standard) 6 Supplying and fixing of Galvanized Nuts and Bolts of sizes. 7 Supplying and fixing of Galvanized Stay Set with 50X8 mm Stay Clamp, Guy insulator (02 Nos) anchor plate (200x200x6mm) nut bolts, 2 nos. Turn buckles, 1.80 m long 16 mm diameter solid GS Stay rod & 7/3. 15 dia GI Stranded wire complete 8 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site, Laying, stringing, binding and Jumperig of conductor including joints with PG clamps of required size30 mm2 ACSR ( Weasel) (As per recommended IS/REC Standard) 9 Supply and installation of 11 KV Link Set, 3-phase, 100A (As per recommended IS/REC Standard) 10 Earthing complete, G.I Rod 20 mm 2.5 Mtr. Long through G.I Wire 11 Cement Bottoming 1:2:4 Mix as per REC Standard 0.5 Cubic Mtr.Per Pole 12 Anti Clamping Device 13 Erection of 11/0.433 kV Distribution Transformer(Note: For detailed specifications please refer attached SBD which forms a part of the tender) 14 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and installation of 250 KVA, 11/0.433 kV Distribution Transformer, Energy Efficiency Level-II, Copper Wound, oil filled, with LT cable termination box with detachable Copper Gland Plate.(As per recommended IS/REC Standard) (with one year warranty) 15 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles (410, SP-15) with pit excavation. (As per recommended IS/REC Standard) 16 Supply and installation of Gapless Surge Arrestor,9 kV,10 kA, LA with (polymer) housing, Station Type (As per recommended IS/REC Standard) 17 Supply and installation of 11 kV Horn,Gap Fuse Set, 3-phase, 100A (As per recommended IS/REC Standard) 18 Supply and installation of 11 kV Link Set, 3-phase, 100A (As per recommended IS/REC Standard) 19 Supply and fixing of Un Armoured Single Core PVC Cable 220 mm2 alongwith 12 no. Al. thimble 120 mm2 20 Supplying and fixing of Galvanized Nuts and Bolts of sizes. 21 Supplying and fixing of 11 kV Pin Insulators (polymer) with Pins ( 5 KN) (As per recommended IS/REC Standard) 22 Supplying and fixing of 11 kV Disc Insulators (polymer) Complete with fittings (45KN) depending upon conductor size. (As per recommended IS/REC Standard) 23 Supplying and fixing of Angle Belt 1.5 Mtr for the protection of transformer 24 Supply and fixing of LT Distibution fuse set of standard making using clamps/thimbles with Brass Bolts and washers etc. Complete job as per REC standard (Drilling of holes Prohibited). 25 Supplying and fixing of Angle Brace for transformer bed 26 Supplying and fixing of Cross X-mar 2.8. Mtr 27 Cement Bottoming 1:2:4 Mix as per REC Standard 0.5 Cubic Mtr.Per Pole 28 Excavation of Earthing Pits of dia = 650 mm and depth= 3000 mm, Supplying and fixing of 3 No. sub station earthingby GI Pipe 40 mm or GI Rod 20mm, 2.5 mtr long through GI Strip of 50X6 mm 1 nofor neutral earthing and 25X3 mm 2 nos (for 2 Nos transformer body earth, 2 Nos Pole earth, 1 no. LA Earth and 1 no. GO handle earth). (Note: For LA Earth 1 pipe shall be kept separate) GI Nuts, Bolts and Clamps, refilled with earth enhancement materials and earthing chamber made of brick masonary with RCC Slab Cover. (As per recommended IS/REC Standard) 29 Erection of 1kM of LT Line on Conductor, 3-Ph, 4-wire, 2-Ph, 3-wire & 1-Ph, 2-wire(Note: For detailed specifications please refer attached SBD which forms a part of the tender) 30 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site and erection of 8 Mtr. Long ST Poles (410, SP-15) with pit excavation. (As per recommended IS/REC Standard) 31 Supply and fixing of Mukky clamps for LT Shackle insulators (As per recommended IS/REC Standard) 32 Supplying and fixing of Shackle Insulators (polymer) ( 16KN) (As per recommended IS/REC Standard) 33 Supplying and fixing of Galvanized Nuts and Bolts of sizes. 34 Supply, Loading, Transportation, insurance, Unloading, Carriage and Delivery at Site, Laying, stringing and binding of conductor including joints with PG clamps of required size.30 mm2 ACSR (Weasel) (As per recommended IS/REC Standard) 35 Cement Bottoming 1:2:4 Mix as per REC Standard 0.5 Cubic Mtr.Per Pole