| 1 | Taking out carefully Paver blocks from old footpath and stacking properly at suitable nearer site etc. all complete. |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Filling in foundation or plinth by silver sand inlayers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)B) by Find Sand |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
| 5 | Removal of rubbish,earth etc. from the workingsite and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as perdirection of Engineer in charge |
| 6 | Supplying and laying in the specified pattern of interlocking concrete block pavements(ICBP) with concrete blocks (with concrete grade as specified as per table 1 of IS 15658 : 2006) manufactured from BIS license manufacturer, with spacer nib (small protruding profiles on the vertical face of a paver block used as device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 1568) and specified size and shape with aspect ratio the ratio of length t othickness of a paver block, as per cl.no.3.3 of IS: 15658) as per table 2 of IS: 1568 with flexural strength/breaking load as per annexure g of IS:1568, on the prepared base as certified CBR as per table 1 of IRC SP 63 2018 or else as of 25-35 mm thick (grading of the building sand as per clause 6.5.1 of IRC SP-63) paver block with joint filling sand and completing the edges with cut blocks as perCL.No. 8.7 of IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction, levelling and filling up of the edge gap.60 mm thicki) Color Decorative |
| 7 | M.S.or W.I. Ornamental grill of approved design jointscontinuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.(ii) Grill weighing above 16 Kg./sq.mtr and above |
| 8 | Providing and fixing at or near ground level precast cement concrete in kerbs (size: 410 mm x 310 mm x width 150 mm at bottom with circular nosing at top) (Nano kerb) of cement concreat M25 Grade without reinforcement, fixing as per approved pattern and setting in position at site after preparing the bed grade and slopes by laying Cement concrete with jhama khoa (1:4:8) as per specification and direction of Engineer-in-Charge including filling of joints with 10 mm thick cement morter (3:1) and back filling the vertical piece properly with earth duly compactedand curing the morter joints for atleast 3 days including cost and carriage of all materials complete. |
| 9 | Scraping of moss, blisters etc.thoroughly from exterior surface of walls necessitating the use of scraper, wire brush etc.(Payment against this item will be made only when this has been done on the specific direction of the Engineer-in-charge) |
| 10 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly,complete as per manufacturer\"s specification and as per direction of the EIC.In Ground Floor:(a) One Coat |
| 11 | Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer\"s specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.In Ground floor (Two Coat)a) Normal Acrylic Emulsion |
| 12 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn)coating of 150 grams per sq. metre (followed by colourcoated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work).a) With 0.5 mm thick sheet |
| 13 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sandpapering etc. |
| 14 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. includingusing of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface(iv) Two coats (with any shade except white) |
| 15 | Supplying, fitting and fixing Stainless Steel railing consist of 38mm dia and 900mm height vertical balustrade at every two alternative steps, 50mm dia top rail, 3 (three) nos 19mm dia horizontal Strainless steel pipe and base/cover plate with Strainless Steel GRADE 304 containing 7.5% nickle (Interior Grade) Brushed/Mat finish, complete as per direction of the Engineer-in-charge.Weight of Strainless Steel railing per metre 6.5 Kg (approx) |
| 16 | Supplying of Yellow/Black Coloured rubber rumbler as per IRC- 099; along with fixation of the same on road by suitable means at MLCP, including all charges & taxes & as per direction & design of the E.I.C. . |
| 17 | Add GST@18% on Sl. No. 1 to 16 |
| 18 | Add labour cess @1% on Sl. No. 1 to 17 |