|
| 1 | Manali Carrying Capacity Study |
| 2 | EPA approved Ambient Air Quality modeling based on the input of TNPCB for Manali Industrial area |
| 3 | EPA approved Ambient Air Quality modeling based on the input of TNPCB secondary data for Ennore Industrial area(NCTNP & NTECL Vallur power plant) |
| 4 | Establish & collection of 13 AAQ rotating monitoring stations with data collection in Manali areas based on (a) & (b) for one season (3 months) for PM 2.5, PM10 ,SO2, NOX, Benzene & Benzo (a) Pyrene and NH3 covering up, down and cross wind directions and on Max.GLC location as mentioned under 2.1 of scope of work. Frequency of AAQ survey sampling-2 samples/week/3months. |
| 5 | Establish & collection of 10 AAQ fixed monitoring stations with data collection in Manali areas based on (a) & (b) for one season (3 months) for PM 2.5, PM10 ,SO2, NOX, Benzene & Benzo (a) Pyrene and NH3 mandatorily covering up habitations of Thiruvottiyur, Sathangadu, Manali and Kodungayur and remaining six stations are to be fixed in consultation with TNPCB. Frequency of AAQ survey sampling - 2 samples/week/3months |
| 6 | EPA approved Ambient Air Quality modeling for line source emission (Vehicular emission) study in Manali Industrial area for a season. |
| 7 | EPA approved Ambient Air Quality modeling for line source emission (Vehicular emission) study in Ennore Industrial area for a season. |
| 8 | Establish & collection of 8 AAQ fixed monitoring stations with data collection at Ennore (NTECL Vallur 31 Power plant/North Chennai thermal power plants) based on (a) & (b) for one season (3 months) for PM 2.5, PM10 ,SO2, NOX, Benzene & Benzo (a) Pyrene and NH3 covering four stations to the North of the plants and four to the South of the plants as mentioned under 2.1 of scope of work. Frequency of AAQ survey sampling-2 samples/week/3months. |
| 9 | Collections and analysis of monthly 10 Nos of surface water samples in Kosasthalayar River, Buckingham canal & other water bodies in Manali industrial area for a season (3 months) for parameter of BOD, COD and Ammonical Nitrogen. Parameters to be tested as per IS 10,500:2012. Total number of surface water samples is 30. |
| 10 | Collection of analysis of monthly 10 Nos of ground water samples at 1,3 & 5 kms for Core area of Manali industrial zone for one season (3 months) for parameter of BOD, COD and Ammonical Nitrogen. Parameters to be tested as per IS 10,500:2012. Total number of surface water samples is 30. |
| 11 | 24 hours Noise level study in Manali industrial area covering industries, vehicular etc during the season.(10 Nos of sample) |
| 12 | Man power/ Stationery/ Overheads |