|
| 1 | PART1 |
| 2 | Cat6 4 Pair UTP Cable: 23 AWG, Make: D Link/Molex/Finolex /RR |
| 3 | Cat6 Information outlet, Make: D Link/Molex/Finolex /RR |
| 4 | Face plate Singlex.- Cat6, Make: D Link/Molex/Finolex /RR |
| 5 | 3 x 3 Surface mount box for Cat6 Outlet, Make: D Link/Molex/Finolex /RR |
| 6 | Cat6 patch cord,3 mtr, Make: D Link/Molex/Finolex /RR |
| 7 | Cat6 patch cord, 1mtr, Make: D Link/Molex/Finolex /RR |
| 8 | Cat6 patch panel 24 port Fully Loaded, Make: D Link/Molex/Finolex/RR |
| 9 | 9U Wallmount Rack with Accessories, Make:Netrack/MRS/Rack space/Unicorn |
| 10 | 6U Wallmount Rack with Accessories, Make:Netrack/MRS/Rack space/Unicorn |
| 11 | Supply of 25mm ISIPVC Conduit- Ivory |
| 12 | Supply of 32 mm HDPE Pipe |
| 13 | 100X50 DLPTrunking with accessories |
| 14 | 50X50 DLPTrunking with accessories |
| 15 | Router with 2x GE Enabled WAN (1000/100/10 Ba se T) with 2 RJ 45 with all acessories, Make:Netgear/Dlink/TP Link |
| 16 | Fully Managed 24 Port Network Switch with minimum 4“ 1/10G SFP+ Uplink, Make:Netgear/Dlink/HP |
| 17 | 16+1SFP + Uplink 10/100/1000Network Switch, Make:Netgear/Dlink/HP |
| 18 | Wireless-N Access Point, Make:Netgear/Dlink/HP |
| 19 | Power injector for AP, Make:Netgear/Dlink/HP |
| 20 | 1G SFP Module for Access Switches (SM), Make:Netgear/Dlink/HP |
| 21 | Laying of 4 Pair Cat6 UTP /STP Cable |
| 22 | Firing and termination of Information outlet with SMB- Cat6 |
| 23 | Firing and port termination of patch panel- Cat 6 |
| 24 | Fixing & Dressing of wallmount Rack |
| 25 | Laying of 100X50 DLP trunking |
| 26 | Laying of 50X50 DLP trunking |
| 27 | Laying of 25 MM PVC Conduit |
| 28 | Firing of Access point |
| 29 | Certification of Nodes using Fluke Meter |
| 30 | Configuration Charges for Active Devices |
| 31 | Electrical cabling 3Cx1.5 Sq mm through conduit, Modular box and 5A,3 pin plug and switch |
| 32 | od1495699/2021_2022 : od1283429/2021_2022 :Supply and fixing 3D Acrylic letters ENGLISH LETTERS 25-30cm or MALAYALAM<br>LETTERS 20-25cm for name board etc complete as per direction of Engineer incharge at site OD 50/21-22 |