|
| 1 | Manufacturing, testing(material including design) & supplying of Hot water storage Tank 6000L capacity SS 316 with mounting platformspumps with all accessoriesetc |
| 2 | Manufacturing, testing(material including design) & supplying of Acid Storage Tank 6000 L capacity SS 316 with mounting platforms, pumps etc |
| 3 | Manufacturing, testing(material including design) & supplying of Alkaline storage tank of capacity 6000L in SS 316 with mounting platforms, pumpsetc |
| 4 | Manufacturing, testing(material including design) & supplying of Recuperation Tank with capacity 6000 L in SS316 with mounting platforms, pumps etc |
| 5 | Manufacturing, testing(material including design) & supplying ofLye & Acid Unloading tanks for storing concentrated Lye and Acid. |
| 6 | Manufacturing, testing(material including design) & supplying of Interconnection Pipesin SS316 with all accessoriessuitable for coupling , valvesand integration with all theMilk silos andother equipments requires CIP |
| 7 | Manufacturing, testing(material including design) & supplying of Centrifugal pump of suitablecapacity |
| 8 | Manufacturing, testing(material including design) & supplying of CIP supply Pump of suitable capacity for two lines( forward & reverse) |
| 9 | Manufacturing, testing(material including design) & supplying of Flow meters,Flow plates ,Condensate, sumps Shell tubes for CIP Supply & return way all accessories |
| 10 | Manufacturing, testing(material including design) & supplying of Control Panel with allrelays, transducers, PLC equipment, HMI, additionalHM’Is extension ports, control wiring, etc |
| 11 | Manufacturing, testing(material including design) & supplying ofExtra HMI / Desk TOP PC Control and monitoring , printer with all software, Hard wareand Topology control Hard ware and software key etc |
| 12 | Manufacturing, testing(material including design) & supplying of All Power supply connection tapping from the AC distribution panels, supply of cables, wiring, Cable traysetc |
| 13 | Manufacturing, testing(material including design) & supplying of Any othercomponents, accessories required for the total integration of the system ( miscellaneous) |
| 14 | Labor charges for the manufacturing, testing, loading,transportation, unloading, installation, testing & commissioning , Software programming , training the plant personalsand handing over the project as LSTKP basis (including cost of design charges) |