}

Tender For Revamping And Gardening Works At Samudrika Panampilly Nagar, kochi-Kerala

Cochin Shipyard Limited has published Tender For Revamping And Gardening Works At Samudrika Panampilly Nagar. Submission Date for this Tender is 18-12-2023. Gardening Tenders in kochi Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

41046565
Tender For Revamping And Gardening Works At Samudrika Panampilly Nagar
Open Tender
Indian
Kerala
Kochi
18-12-2023

Tender Details

Tender For Revamping And Gardening Works At Samudrika Panampilly Nagar; 1 Clearing The Existing Planter Boxes By Removingthe Plants And Soil Up To A Depth Of 50Cm, Includingdemolition Of Pccinside To Increase The Soil Volume, Trasporting And Disposingthe Debris Within The Compound, Filling The Planting Pit Using Gardening Soil Mixed With Manuers, Cocopeat In Equal Proportion Along With Lime Including Cost And Conveyance Of Materials, Tools And Labourers Etc. Complete. ( Manuers, Cocopeat, Lime Etc., Shall Be Supplied By Csl. Gardening Soil Shall Be Supplied By The Contractor. ) 2 Cutting, Removing And Disposal Of Existing Nerium ( Arali ) Plants Includingroots, Excavation For Making Pits Of Size Not Less Than 40 X 40X 40 Cm , Transporting And Disposingthe Debris At Designated Area Within The Compound, Filling The Planting Pit Using Gardening Soil Mixed With Manuers, Cocopeat In Equal Proportion Along With Lime Including Cost And Conveyance Of Materials, Tools And Labourers Etc. Complete. ( Manuers, Cocopeat, Lime Etc., Shall Be Supplied By Csl. Gardening Soil Shall Be Supplied By The Contractor. ) 3 Supplying, Providing Andplanting The Followingsaplings Carefully Without Making Any Damages To The Roots And Stems Of Saplings, Including Cost And Conveyance Of Materials, Tools And Labourers Etc. Complete. Rate Is Inclusive Of Maintenance And Upkeeping Of Newly Planted Sapling During Plantation Period. ( Plantation Period Is The Duration Stipulated For Plantation Of Saplings I.E. 45 Days. ) Subsequent Maintenance, After Completion Of Plantation Period Shall Be Considered Under Respective Item Of Boq. 4 A ) Flowering Plants For Planter Boxes In Full Sun Areas 5 A1 ) Lantana Red Flower 6 A2 ) Lantana Yellow Flower 7 A3 ) Russelia Red Flower 8 A4 ) Russelia Ivory Flower 9 A5 ) Tecoma Orange Flower 10 A6 ) Tecoma Yellow Flower 11 A7 ) Black Lily With Pink Flower 12 A8 ) Ervatamia Miniature With Yellow Leaf And White Flower 13 A9 ) Lolipop Plant With Yellow Flower 14 A10 ) Melastoma With Violet Flower 15 A11 ) Miniature Rose With Pink Flowers 16 B ) Flowering And Foliage Plants For Planter Boxes In Semi Shaded Areas 17 B1 ) Aglonema Lip Stick Colored Leaves 18 B2 ) Spider Lily With White Flowers 19 C ) Ground Cover Flowering And Foliage Plants 20 C1 ) Ornamental Ground Nut With Yellow Flowers After Removal Of Existing Grass In Between Planter Boxes 21 C2 ) Dessotis With Violet Flowers After Removal Of Existing Grass In Between Planter Boxes 22 C3 ) Alternanthera With Red Leaves After Removal Of Existing Grass In Between Planter Boxes 23 C4 ) Rhoeo With Deep Pink Leaves After Removal Of Existing Grass In Between Planter Boxes 24 D ) Flower Beds In Fruit Garden Area With Grass Lawn 25 D1 ) Evolvulus With Blue Flowers ( 3 Flower Bed ) 26 D2 ) Torrenia With Purple Flowers ( 3 Flower Bed ) ( Ordinary ) 27 D3 ) Table Rose With Red And Orange Flowers ( 2 Flower Bed ) 28 D4 ) Correposis With Yellow Flowers ( 2 Flower Bed ) 29 E ) Planting Of Dwarf Trees In Proposed Areas 30 E1 ) Bottle Brush Tree With Red Flowers 31 E2 ) Mulak Chembarthi With Red Flowers 32 E3 ) Plumeria Pudica 33 E5 ) Pavizhamalli With Orange And White Flowers 34 Maintaining The Newly Planted Saplings, Dwarf Trees And Flower Beds Etc. By Engaging A Gardenerfor A Period Of Six Months From The End Of Plantation Period. Rate Is Inclusive Ofplanting, Wateringthe New Plants As Required, Manuring The Plantsin Required Intervals, Deweeding The Peripheral Areas Of Plant, Cutting / Trimming The Branches Of Plants In Required Interval Etc. Including Cost And Conveyance Of Materials, Tools And Labourers Etc. Complete.Maintenance For Six Month Is Covered In This Item Which Commence After Completion Of Plantation Period Of Initial 45 Days.

Key Value

Document Fees
Refer document
EMD
INR 6825.0 /-
Tender Value
INR 3.41 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail