|
| 1 | 6\"x3\" Boards (Black back flex with 1/4\" metal pipe with installations for décor and signages) |
| 2 | 6\"x3\" Standees (Black back flex with 1/4\" metal pipe with installations for décor and signages with metal pipes to be painted in black oil color) |
| 3 | 7\"x4\" Fence Boards (Black back flex with 1/4\"metal pipe withinstallation on thesurroundings fencingaround the ground ) |
| 4 | 8\"x3\" PerimeterBoards (Black back flex with 1/4\"metal pipe withinstallation near the FOPwith both side framingand flex with hookadjustment ) |
| 5 | 150\"x8\" Board (Black back flex with 1\"metal pipe withinstallations for behindthe public sitting area) |
| 6 | Arch (Arch gates with 3\" boxpoles and average sizeof 27\" W and 14\" H withblack back flex and 1\"-1.5\" metal pipes to beused and installed atspecified locations) |
| 7 | 20\"x10\" Award Ceremony Backdrop (Black back flex with 1/4\"metal pipe with selfstanding installation) |
| 8 | Entry Gate Arch (Arch gates with 4\" boxpoles and average sizeof 37\" W and 16\" H withblack back flex and 1\"-1.5\" metal pipes to beused and installed atspecified locations) |
| 9 | 10\"x10\" Instructional Boards (Black back flex with 1/4\"metal pipe with selfstanding installation) |
| 10 | Vinyl Installation ( Eco Solvent Vinylinstallation at variouslocations on wall andglass) |
| 11 | Tshirt |
| 12 | Caps |
| 13 | Official Tshirts |
| 14 | Staff Tshirts |
| 15 | Maharashtra Team Track Suit |
| 16 | Locations : 9 Raigad Day 1Mumbai Day 2Pune Day 3Ahmednagar Day 4Sambaji Nagar Day 4Jalgaon Day 5Amravati Day 6Akola Day 6Wardha Day 7Nagpur Day 8Chandrapur Day 9 |
| 17 | Floral (Total Décor to be done at the ShivChhatrapati Shivaji Maharaj statue andsurrounding area at Raigad |
| 18 | Floral(Open jeep to be decorated with traditionalflowers during the whole route ) |
| 19 | Floral (Medium size Flower Bouquets with exoticflowers) |
| 20 | Floral (Medium size pot with flowering plants forgifting ) |
| 21 | Floral (Floral garlands for medium size frames atall locations) |
| 22 | Stage (16ft x 8ft x 1ft(h) with new grey colorcarpet to be constructed at all venues) |
| 23 | Branding (Stage Backdrop 16 x 8 ft at all locations) |
| 24 | Branding (Standees 6x3ft at all locations) |
| 25 | Branding (Road branding boards 6x3ft at all locations) |
| 26 | Branding (Branding on jeep with flex board) |
| 27 | Branding (Satin flags with printing of the logo 3x2ft) |
| 28 | Branding (Eco Solvent Vinyl printing with laminationon cars ) |
| 29 | Rangoli (Rangoli of the event logo and other culturaldesign at all locations) |
| 30 | Entertainment (Dhol Tasha of 20-30 artists each at alllocation) |
| 31 | Entertainment (Lejhim and Mardani Khel act at all locations) |
| 32 | Entertainment (Tutari 4 people at all locations ) |
| 33 | Entertainment (Shankh music at Raigad 6 people) |
| 34 | PA System (PA System with 2 cordless mikes and DJ atall locations) |
| 35 | Clothing (Sports Jackets with full subilimation as perdesign provided for the dignatories ) |
| 36 | Clothing (Caps with full sublimation as per provideddesign) |
| 37 | Clothing (Collared Dry fit Tshirts with full sublimationas per design) |
| 38 | Food (Food boxes with basic snack, 500ml waterbottle and tissue papers to be provided tothe crowd at all locations) |
| 39 | Open Jeep (Open Jeep for the torch rally starting fromRaigad to Chandrapur, fuel cost to beincluded) |
| 40 | Photography andVideography (Still Photographers at all venues) |
| 41 | Photography andVideography (Videographers at all Venues) |
| 42 | Photography andVideography (Drone with operator at all venues ) |
| 43 | Mascot 6ft live mascot of Tiger at all venues) |
| 44 | Torch (Metal torch with chemi fuel usage | handleshould be wooden ) |
| 45 | Torch (Lamp lighting structure at the main venuewith gas kit ) |
| 46 | Scope of Work for OpeningCeremony(Conceptualize, organize, manage,fabricate andexecute the Opening Ceremony for U19 NationalAthletic School Tournament, Chandrapur,MaharashtraThe Opening Ceremony will be an evening event.Major Scope Elements for the OpeningCeremony are listed below:1. The Opening Ceremony will beConceptualized, Planned, Designed,Organized, Produced,Coordinated,Directed, Managed,Executed and Delivered for a period of90-120 minutes (including speeches byVVIPs etc.) in which the core culturalprogram would be of 60-75 mins minutesduration. Minimum two acts in thethemes of the proposed acts should bebefitting not only to the cultural & socialbackground of Maharashtra and but alsoportray the holistic development of theState in recent times in sports. TheAgency must ensure a seamless transitionfrom one act to another and the proposalshould NOT give an impression of actsbeing forcefully stitched together. |
| 47 | Design the theme and branding of the event |
| 48 | Sourcing, appointing, directing and managing of A Category Artist, performers and other creative elements of the ceremonies in relevance to the proposed theme with the State sports department, Cultral Department of Maharashtra and Chandrapur Collectorate. |
| 49 | Monitoring the operations for theceremony |
| 50 | Logistics and production planning for theceremony. Ensuring adherence to all thepolicies related to the Riskmanagement,Manpower Management,Safety Management, etc. |
| 51 | Liaison with concerned authorities for effective venue management planning, coordination, and execution. All activities to be conducted in relation to the Opening Ceremony are to be created, planned and managed as part of the Ceremony responsibilities, included but not limited to VIP welcome, to interact with the cultural departments, coordinating time for arrival, departure, and marshalling of the officials and audience for Opening ceremony including catering services for the crew and performers for rehearsals and the Opening Ceremony |
| 52 | Ensure smooth execution production and delivery of the ceremony in accordance with the requirements of the event |
| 53 | Ceremony venue seating layout and planning. |
| 54 | Agency has to ensure appropriate quantity of installations for Temporary toilet blocks for audience size of nearly 4000 people |
| 55 | Sourcing, Accommodation, Catering & Transportation of artists and performers. |
| 56 | VIP Stage of 100ftx32ft with 4ft height |
| 57 | Performance Stage of 60ftx40ft with 4ftheight |
| 58 | VIP Management: Invitations to be sent out to VVIPS, VIPs & dignitaries inviting them to attend the opening ceremony |
| 59 | . Vehicle Movement: Identification of parking facilities forVIPs Officials Media, etc in close co- ordination with City Police |
| 60 | Venue Signage: Ensure that the direction signage to the venue are deployed and installed in time clearly marking the routes to and from the venue. Also, to ensure installation of in- venue signage for the Opening Ceremony. The signage shall be of Fluorescent material for easy visibility in the night. |
| 61 | Records Management: All operations and activities with relevant photo/documentary evidence must be covered and duly submitted to ensure smooth payments. |
| 62 | Reporting and Documentation: This is an important aspect of Event Management. The Agency is expected to create & maintain detailed reports for the Opening Ceremony, including but not limited to Production reports, Inventory reports, Work-force (Artistes) Planning & Deployment & Legacy Reports with photographs |
| 63 | VVIP Dais Stage and Entertainment stage as per the concept ensuring high standards |
| 64 | VVIP Dais (With Back Drop) |
| 65 | Colorful Flags (big & small to be used inmultiple segments) |
| 66 | Media Riser |
| 67 | Lights (intelligent lighting including LEDPar - LED Par Can 54 Star 3W Lights ;Beam Angle. 15, 25, 35, 45 DegreeOptional Feature ; Dimmer. 0 100 PercentLinear Dimmer ; Weight. 3 Point 5kg ;Sharpie - OPTICS. 3-lens HQ optical group(patent pending) Adjustable Beam Angle:from zero to 3.8° Focus: electronic. Lightoutput at 20 meters (65 feet): 59,760 lux,Blinders - Lamp power:4 X 100W LED ;Power supply:AC 100-240 V, 50-60 Hz ;Beam angle:40 Deg. ; Control:DMX512 /RDM / Manual ; Channels:8 CH, SmokeMachin - Air Pressure, 1500w ;Brand/Make, JIA/REOLITE ; ProductionCapacity,Voltage, 1500w, Haze Machin -The G300 combines an incredibly highpowered smoke generator with a waterbased hazer and is the mosttechnologically advanced dual purposemachine, moving lights, conventionallights, moving head, color changers,gobos, ) |
| 68 | 23. Sound : High end audio video production equipment (high-definition projection systems, acoustics, Line Array - JBL VRX -Frequency Range (-10dB), 60 Hz – 20 kHz (Present: VTX V20) ; Horizontal Coverage (-6 dB), 105 degrees nominal (300 Hz - 16 kHz) ; Maximum Peak, Tech Rider as per ArOst - mic wireless sennheiser skm 5200 -STAGE MONITORING SYSTEM- Slanted Wedge Two-Way Monitors- Meyer/JBL/QSC or any reputed make – 500 wa?s minimum 8 2 Sub must for the drummer – Single 15’ Sub Woofer 1, 3 Side fills with Subs, BACKLINE - Bass guitar Amplifier- (Amp Head- Ampeg SVT Pro, Amp Cabinet- Ampeg 810) 1 2 In ears Shure PSM 900 / 1000 or Sennheiser G3/G4 5 3 Guitar Stands 3 4 Power points (at different points), ACCESSORIES - 3 Guitar Stands • 1 Riser on stage with carpet for Drums 8x8x1.6 Feet • 1 Riser for the Console – Approx 60O away from the front of stage • Gazebo Tents for outdoor venues – 4 on stage and 2 for the Console. THE BAND WILL NOT DO A SOUND CHECK WITHOUT THE STAGE AND CONSOLE COVERED MIC - Kick Shure Beta 91 Comp/ Gate 2 Kick Audix D6 /Beta 52/ Senn E902 Comp/ Gate Small 3 Snare Top Shure SM 57 Comp Big 4 Snare Bo?om Shure SM 57 Comp Small 5 Hi Hats Shure SM 81 /Senn E914 Big 6 Tom 1 Beta 56 / Senn E904 Gate Clip On 7 Tom 2 Beta 56 / Senn E904 Gate Clip On 8 Floor Tom 1 Audix D6 /Beta 52/ Senn E902 Gate Clip On Floor Tom 2 Audix D6 /Beta 52/ Senn E902 Gate Clip On Overhead L Shure SM 81 / Senn E914 Big Boom Overhead R Shure SM 81 / Senn E914 Big Boom Sampler L DI Sampler R DI Sound Scaffold Sound Engineer |
| 69 | Audio Visual content complimenOng the overall theme and concept |
| 70 | Overall ceremony venue Décor |
| 71 | LED Walls |
| 72 | Creative Consultant |
| 73 | Choreographer |
| 74 | Props |
| 75 | Costumes |
| 76 | Podium |
| 77 | Cabling |
| 78 | Local Communication and Transportation |
| 79 | Thematic Welcome gates for VVIPS/VIPs and Dignitaries |
| 80 | Welcome gates for General Public and its planning |
| 81 | Main Stage Branding |
| 82 | Branding Standees |
| 83 | Photo Opp Corners |
| 84 | Creative Installation |
| 85 | Pre-Event Show – Cultural or Musical for Spectator Engagement |
| 86 | Welcome of Chief Guest, VVIPs, Dignitaries etc. (act/representation & speeches) |
| 87 | . March-past of contingents, Pledge, Flag Hoisting etc. |
| 88 | . Musical concert and Theme song by Lead singer(s) |
| 89 | Innovative ideas for final act |
| 90 | 2 Bleacher of 5 steps each to be constructed of 180O length for sitng arrangement of players |
| 91 | . 2 Pla?orms of 100O length each of 1O heaight to be constructed for Dignatory and Media sitng |
| 92 | Box Trussing for the performance stag |
| 93 | Barricading (required as per the seaOng arrangment Plan) |
| 94 | Providing, fixing, Installing & dismantlingaOer compleOon of program : Pagoda 5M.X 5M. (Providing, fixing & arranging it onbefore Rehearsal Day and on FucOon Day)to be used for green room for VVIP andarOs |
| 95 | 75 VVIP Dais chairs or sofa sets |
| 96 | Green rooms for Artist and Performer |
| 97 | Green rooms for VVIPs and VIPs |
| 98 | Providing and fixing Decorative acrylic/glass podium of good quality on hire basis with necessary branding |
| 99 | Floral Décor wherever necessary for scurOng, podium and 30 bouqets for the guests |
| 100 | 2 LED Screens of 20Ox12O with 2O LED riser with the following details : Brightness, 12-30 mcd ; Wavelenght, 635 nm ; Max forward current, 20 mA (conOnuous) ; Max reverse voltage, 5 VDC ; Foward voltage, 1.8 VDC, Watchout Server - Processor: Intel® Core ™ i7- 5960X 8 núcleos de Processador Extreme EdiOon (20M Cache, comeu 3,50 GHz).Memory : Kingston HyperX Predator - Kit 16GB * (4x4GB) - DDR4 2133MHz CL13 Intel XMP DIMM. SSD: Kingston HyperX 3K SSD - 120GB SH103S3 / 120G. Mother Board: Asus X99 Pro. Videocard: AMD FirePro ™ W9100. Cooling: Cooler Master - Seidon 120M - LGA 2011 - RL-S12M-24PK-R1.Energy Source: EVGA SuperNOVA 1600 G2 Power Supply. |
| 101 | 6 hostesses for the ceremony |
| 102 | . Performance stage has to be customisedwith the theme of Forest, the mascot andSports with LED screens to be included |
| 103 | German Hanger Player Food Lounge : 300 x 80ft Official Food Lounge : 60 x 60 ft Official Sit out area : 40 x 40 ft (Floor : Wooden platformElectrical / Technology: - Minimum lighting levels of200 lux - Adequate safety lighting - 5A electrical sockets- Sufficient Size electrical panelfor above connectionsP/E structure with top coveredwaterproof SRF materials. Eachstructure with 100 mm raisedwooden flooring using 19mmthick Fire Retardant Plywood,new synthetic carpet in darkgrey color, Partitions shall bemade in prefabricated aluminumsections (ht. up to 2.50 Mts.)with laminated panels ifrequired . Furnished with fireextinguishers to meet necessaryfire regulations governingtemporary structures) |
| 104 | Table (6 x 2 ft) |
| 105 | Table (4 x 2 ft) |
| 106 | Office Chair (Wheeled Chair withLeatherette. Upholstery withBack Support and Side Arms) |
| 107 | Padded Chair (Armrest Cushion chair withcushion at seat and backrest,with steel frame) |
| 108 | Plastic Chairs White Plastic chair with armsupport) |
| 109 | Cabinet 2 Door (Commercial quality steel withdurable powder coated finish.Three-point locking handle (keyincluded) that secures lock rodsto top, bottom and a cam thatlocks behind the left door.Size-42\"H x 36\"W x 18\"D) |
| 110 | Sofa 2 Seater (Width: 750 x Height: 700Length: 1200 Seamless designof plush seating in qualityleather) |
| 111 | Sofa 3 Seater (Width: 750 x Height: 700Length: 1200 Seamless designof plush seating in qualityleather) |
| 112 | Fridge (Fridge should be branded andCapacity of 185 ltr) |
| 113 | Power Point /ExtensionCord (Power cord with universalsockets 6 no’s, 5Amp each,max spike current of13000Amps, with surgeprotection) |
| 114 | Tensile Barrier (Retractable Belt Posts or BeltStanchions Blue in Colour) |
| 115 | Octonorm Partitions (Partitions shall be made inprefabricated aluminumsections (ht. up to 2.50 Mts.)with laminated panels .) |
| 116 | Chemical Toilet Port-a-loo Including Cleaning ,Manpower for Maintence andSuction on All Event days) |
| 117 | Coffee Table (1210x610x400 WoodenPolished Centre table) |
| 118 | Office Bin (30 Litre Office Bin) |
| 119 | White Board (White Board With Stand Sixe 4feet x 2 feet) |
| 120 | Carpet ( rolls) (Carpet 3mm with Laying andInstallation ( 30mtr (l) by 3m(w)) in dark grey color) |
| 121 | Mojo Barricade (Portable hard Baricades of size 8 feet x 4 feet) |
| 122 | Camera Platform (4mx2mx0.5m) (Platforming with carpeting) |
| 123 | AC Branded Standing AC minimumof 3 tons) |
| 124 | Fans (Standing/ Mobile Fans) |
| 125 | Metal Lights 400Watts Metal Lights) |
| 126 | DG Set - 250 KVA ( 3 phase cabling, earthing,change over, distribution panelwhich is suitable for entireduration of the event, to run as) |
| 127 | DG Set - 125 KVA(per site requirement withcapacity switch gear anddistribution cables of adequatesize and length, with allconsumables, operation andmaintenance for 14 days. Thecost of fuel for running per houris to be mentioned in respect ofeach of the DG Set. The finalbills for fuel shall be verifiedagainst the running hours perday in respect of each DG Se) |
| 128 | DG Set - 72 KVA |
| 129 | Staircase CoveringMandap : 160ft x 14f (Metal Structure with 8ft heightwith Tin covering on top) |
| 130 | Matresses set (Matress | pillow with cover | matress covering soft cottonbed sheet | warm rug) |
| 131 | Black Masking (Black Masking for atrequirement) |
| 132 | Napkin (Napkin with aminimum size of 40 cmX 60 cm withembrioderay of thetournament logo on it) |
| 133 | Sports Water Bottle ( 500ml, 6.5\" tall, 2.75\"wide, 0.8\" openingtemperature displaybottle with 4 logos tobe printed on thebottle) |
| 134 | Brochure( Brochure of all thetournament details of5-8pages of goodpaper quality 300 gsm) |
| 135 | LED Par ( LED Par Can 54 Star 3W Lights ; BeamAngle. 15, 25, 35, 45 Degree OptionalFeature ; Dimmer. 0 100 PercentLinear Dimmer ; Weight. 3 Point 5kg ;Body Material.) |
| 136 | Sharpie ( OPTICS. 3-lens HQ optical group(patent pending) Adjustable BeamAngle: from zero to 3.8° Focus:electronic. Light output at 20 meters(65 feet): 59,760 lux) |
| 137 | Blinders Blinders Lamp power:4 X 100W LED ;Power supply:AC 100-240 V, 50-60 Hz; Beam angle:40 Deg. ;Control:DMX512 / RDM / Manual ;Channels:8 CH .) |
| 138 | Smoke Machine (Air Pressure, 1500w ; Brand/Make,JIA/REOLITE ; ProductionCapacity,Voltage, 1500w ) |
| 139 | Haze Machine ( The G300 combines an incredibly highpowered smoke generator with awater based hazer and is the mosttechnologically advanced dualpurpose machine) |
| 140 | Box truss (For 4 Days) Box Truss -Aluminium Alloy Truss24ftxx18ft |
| 141 | Stage (For 4 Days) Performance Stage 20ftx16ft |
| 142 | Sound (For 4 Days) Line Array - JBL VRX -FrequencyRange (-10dB), 60 Hz – 20 kHz(Present: VTX V20) ; HorizontalCoverage (-6 dB), 105 degreesnominal (300 Hz - 16 kHz) ;Maximum Peak |
| 143 | Tech Rider as per Artist - micwireless sennheiser skm 5200 -STAGE MONITORING SYSTEMSlanted Wedge Two-Way MonitorsMeyer/JBL/QSC orany reputed make – 500 wattsminimum 82 Sub must for the drummer –Single 15’ Sub Woofer 13 Side fills with Subs |
| 144 | Decorative Lighting around thewhole Fan Park |
| 145 | 3mx3m Pagodas |
| 146 | Benches for players |
| 147 | Decorative Entry Arch for the FanPark |
| 148 | LED Screen (For 4 Days) ( LED Screen - Brightness, 12-30 mcd ;Wavelenght, 635 nm ; Max forwardcurrent, 20 mA (continuous) ; Maxreverse voltage, 5 VDC ; Fowardvoltage, 1.8 VDC) |
| 149 | Backdrop of stage 20ft x 10ft |
| 150 | Scope of Work (For 4 Days) Engagement of Spectators throughout the day and tournamentHelp sell the food and article sellingstalls to the organizing committee Engagement of Spectators throughout the day and tournamentHelp sell the food and article sellingstalls to the organizing committeeEntertaining activities stallsDesign the theme and branding ofthe Fan Park Sourcing, appointing, directingand managing of A Category Artist,performers and other creativeelements of the ceremonies inrelevance to the proposed themewith the State sports department,Cultral Department of Maharashtraand Chandrapur Collectorate.Colorful Flags (big & small to beused in multiple segments) Performance stage has to becustomised with the theme ofForest, the mascot and Sports withLED screens to be included |
| 151 | 6\"x3\" Boards (Black back flex with 1/4\" metal pipewith installations for road brandingand signages) |
| 152 | 8\"x8\" Boards Black back flex with 1/4\" metalpipe with installations for roadbranding) |
| 153 | 2\"x4\" (Backlight LED aluminium boardswith eco flex printing havingchangeable feature with installations and electrical fitting forroad branding) |
| 154 | 20\"x10\" ( Flex printing with installationon existing hoardings) |
| 155 | 40\"x20\" (Installation of new hoardingstructures with 45x25ft concreteslab with a minimum thickness of 6inches | Use of standard concretemix with a minimum compressivestrength of 3000 psi | Steel frameconstruction with H- shaped steelcolumns with cross-bracing forstability | Apply anti-corrosioncoating | Welded connections tothe steel frame) |
| 156 | 20\"x10\" (Installation of new hoardingstructures with 25x15ft concreteslab with a minimum thickness of 6inches | Use of standard concretemix with a minimum compressivestrength of 3000 psi | Steel frameconstruction with H- shaped steelcolumns with cross-bracing forstability | Apply anti-corrosioncoating | Welded connections tothe steel frame) |
| 157 | Selie Point Permanent Installation (8ft L x 6ft W wooden base withmetal structure or civil work to bemade, 10ft H to be given for thestructure with either metal frame orACP panneling, design shall includeforest, sports, army theme withartifical plants and trees of 7-10ft,with also illuminated treesstructures or plantation around thekiosk, green artificial carpet of thickgrass to be put up on the woodenbase) |
| 158 | Selfie Point Temporary Installations (6ft L x 4ft W wooden base withmetal structure to be made, 8ft H tobe given for the structure witheither metal frame or ACPpanneling, design shall include anyinteresting theme related to sportsor forest, army artificial or naturalplants and trees of 7-10ft, with alsoilluminated trees or plantationaround the kiosk, green artificialcarpet of thick grass or carpet to beput up on the wooden base) |
| 159 | LED Strips (All weather proof LED strips to beintalled around the light posts onroads for decorativepurpose |
| 160 | Big Art Installations (Art installations to be doneaccording to design and material i.eacrylic, metal, S.S illuminated backlight etc. with a theme of flora andfuana, animals, sports, army etc.required of size approx size of 16\"Wx 10\"H with civil work as base forpermanent installation) |
| 161 | Small Art Installations (Art installations to be done according to design and material i.eacrylic, metal, S.S illuminated backlight etc. with a theme of flora andfuana, animals, sports, army etc.required of size approx size of 8\"W x6\"H with civil work as base forpermanent installation) |
| 162 | Street Light Posts (Street light posts to be installed including civil work with height ofminimum 20ft with the light ofcapacity of minimum 90-120 W withcertification of IP-65/IP-66, Highquality toughened glass No UV or IRradiation, THD <10% Power factor >0.95Power efficiency >85 SurgeProtection (>10kV) 440V AC protection for more than 30 mins) |
| 163 | Arch Gates (Arch gates with 4\" box poles andaverage size of 30\" W with blackback flex and 1\"-1.5\" metal pipes tobe used and installed at specifiedlocations |
| 164 | T Arches (T Shape Arch with 3\" box poles andsize of 6\" W on top with black backflex and 1\"-1.5\" metal pipes to beused and installed at specifiedlocations) |
| 165 | Rickshaw Branding (2\"x1.5\" eco solvent vinyl with lamination and installation ) |
| 166 | LED Mascot ( Mascot shape of measuring 6ftH x 2.5ftW to be made with back lightacrylic board and self standing structure) |
| 167 | Bus Branding (Branding on around 50 buses to be provided for the travelof players and officials) |
| 168 | High Mast Light pole Installation ( IS 5986 Fe 510 or equivalent , Base Section- 4mm Top Section-3mm, 20 sided polygon, Base Section-10.375 mtrsTop Section-10.375 mtrs, BaseDia-460mm, Top Dia- 150 mm,Telescopic stress fit, Foundation bolts of12 Nos. of M 30, maximumdesign wind speed of 180 km/hr,Diameter of carriage ring(mm)Including arms of2400 mm (approx), Loadcarrying capacity of 750kgs, 2HPwattage, input supply of 415V 50Hz) |
| 169 | Tricolor Cloth masking (Cloth Masking over the bridge in Indian National Color on both the sides 500m L x 3m Hx 2 quantities) |
| 170 | LED Cutouts (Back light LED Cutout boxes ofvarious figures of different shapesof average size of 6ft Hx 3 ft W) |
| 171 | Air Balloon ( Air Balloon with LIGHT Material : PVC Technique : 175 micronThickness : 175 micron Size : 10x10 ft Type : Sky Balloons ) |