|
| 1 | Supply and fix in repairs DOL starter including Contactors,Relays & Coil , single phase with relay capacity 2.5 to 6.5 Amp suitable for pump sets of capacity upto 3 HP complete all as specified and directed.Make : L&T or equivalent |
| 2 | Supply and fix in repairs DOL starter including Contactors,Relays & Coil , three phase suitable for pump sets of capacity 7.5 HP with relay range 13-22 Amps complete all as specified and directed.Make : L&T or equivalent |
| 3 | Supply and fix in repairs Automatic star-delta starter 3 phase 400/440 volt including contactors, relay, coilsuitable for pump sets of 5 to 10 HPcomplete all as specified and directed.Make: L&T or equivalent/Crompton Greaves Electric Company |
| 4 | Supply and fix in repairs Automatic star-delta starter 3 phase 400/440 volt including contactors, relay, coilsuitable for pump sets of 15 to 30 HPcomplete all as specified and directed.Make: L&T or equivalent/Crompton Greaves Electric Company |
| 5 | Dismantling and removing the motor from the existing position removing the unserviceable copper wire,rewinding the motor with suitable gauge wire, assembling the motor and fitting back to original position testing and commissioning for the following capacity of motor complete all as specified and directed. |
| 6 | (a) 0.5 HP single phase Note : Copper winding required 1 Kg for each Job |
| 7 | (b) 1 HP single phase Note : Copper winding required 1.5 Kg for each Job |
| 8 | (c) 2 HP 3 phase Note : Copper winding required 2.8 Kg for each Job |
| 9 | (d) 5 HP 3 phase Note : Copper winding required6.00 Kg for each Job |
| 10 | (e)7.5 HP 3 phase Note : Copper winding required7.00 Kg for each Job |
| 11 | (f)10 HP 3 phase Note : Copper winding required8.50 Kg for each Job |
| 12 | (g)15-20 HP 3 phase Note : Copper winding required 12.5 Kg for each Job |
| 13 | (h) 25-30 HP 3 phase Note : Copper winding required 18.5 Kg for each Job |
| 14 | All as per item No 5 above but non clogging sewage pumps motor of capacity |
| 15 | (a) 7.5 HP 3 phase |
| 16 | (b) 10 HP 3 phase |
| 17 | Dismantling and removing the pump sets from the existing position, opening the unserviceable pump sets and replacing the both end bearings, gasket, bolts, nuts bushes including overhauling and servicing of impeller and reassembling the same complete all as specified and directed for pump set of following capacities :- |
| 18 | (a) 5 to 7.5 HP, 3 phase |
| 19 | (b) 10 to 20 HP, 3 phase |
| 20 | Dismantling and removing the pump sets from the existing position, opening the unserviceable pump sets including replacement of brass impeller with lock nutson both sides for pump sets and reassembling the same complete all as specified and directed for pump set of following capacities :- |
| 21 | (a) 5 to 7.5 HP, 3 phase |
| 22 | (b) 15 to 30 HP, 3 phase |
| 23 | All as per item No 17 but including replacement of shaft for pump sets of following capacities :- |
| 24 | (a) 5 to 7.5 HP, 3 phase |
| 25 | (b) 15 to 30 HP, 3 phase |
| 26 | Material and Labour for overhauling the sewage pump set (non-clogging) capacity 7.5 to 10 HP, 3 phase by removing from the sewage sump with and including matching the shaft, replacement of gaskets, oil seals, SS nuts, bolts and washers replacement of protection pipe clamps, gun metal bushes and filling the shaft protection pipe with adequate quantity of Lube oil, rs-assembling, re-fixing in position and testing complete all as specified and directed. |
| 27 | Material and Labour for fabrication and fixing of pump set base frame using MS channel ISMC 100 incl two coat of synthetic enamel paint over a coat of red oxide primer and dismantling the corroded and damage base frame for pump set of capacity 5 HP to 30 HP complete all as specified and directed. |
| 28 | Supply and fixing Dozing pump set with motor 5 lph 8 bar complete including PVC piping of required length and size including connecting testing and removing old unserviceable dozing pump complete all as specified and directed. Make : Techno Flow or equivalent |
| 29 | Supply and fix 150 Ltrs FRP tank with top cover suitable for Chlorine dozing system with necessary connections including taking down existing tank complete all as specified and as directed.Make: Sintex or Equivalent |
| 30 | Material and Labour for preparation PVC fiber plate of minimum 3 mm thickness blue in colour with letter wiring in stickers, the details of pumpsets & writing MES No with white colourd sticker with suitable size including fitting, clamping etc complete all as specified and directed. |
| 31 | Material and labour for disconnecting the power cable from the control panel, lifting the submersible pump along with the GI tubing 50 mm carefully from the bore well without damaging the existing MS casing pipes using bore well rig from various sites at Margoa, Ponda and unscrewing each length of column pipe, disconnecting submersible pump set and taken to workshop for servicing and bringing back after servicing, cleaning the GI pipes both internally and externally keeping serviceable pipes ready for installation, replacement of stainer, defective filters, jointing the submersible cable with M seal jointing Kit, Re-installing &re-assembling the submersible pump set along with the power control cable lowering into the existing bore well casing using the bore well rig after jointing each length of GI pipes step by step to the entire length and locking the system connection with the external water supply lines and power controls and testing and commissioning at site to the entire satisfaction etc complete all as specified and directed. Note:- Repair and servicing of submersible pump set, rewinding of electric motor, provision ofsubmersible cable and GI tubingetc shall be measured and paid separately under relevant items of Sch \"A\" complete all as specified and as directed. |
| 32 | Material and labour for opening ofany capacity submersible pumpsets, minor repair and servicing by replacing worn out bearings, gun metal bushes, removing the impeller and refixing after repairing shaft and re-assembling the same with necessary nut bolt, packing etc complete all as specified and directed. |
| 33 | Material and labour for removing the burnt winding from the cores the submersible of capacity ranging exceeding 3 HP not exceeding5 HP completely and replacing the same gauge super enameled copper winding wire complete all as specified and directed. |
| 34 | Material and labour for removing the burnt winding from the cores the submersible of capacity ranging exceeding 5 HP not exceeding 10 HP completely and replacing the same gauge super enameled copper winding wire complete all as specified and directed. |
| 35 | Material and labour for removing the burnt winding from the cores the submersible of capacity ranging exceeding 10 HP not exceeding 15 HP completely and replacing the same gauge super enameled copper winding wire complete all as specified and directed. |
| 36 | Supply and fix GI tubing 50 mm dia heavy duty by replacing corroded existing GI tubing including taking up old rusted GI pipe complete all as specified and directed. Make : TATA/Zenith/Jindal Note : Rate include all fittings required like heavy duty long socket, union etc. |
| 37 | Supply and fix GI tubing 40 mm dia heavy duty by replacing corroded existing GI tubing including taking up old rusted GI pipe complete all as specified and directed. Make : TATA/Zenith/Jindal) Note : Rate include all fittings required like heavy duty long socket, union etc |
| 38 | Supply and fix submersible cable 3 core 6 Sqmm multi stranded copper conductor against unserviceable existing cable complete all as specified and directed.Make : Finolex/Policab/Plaza |
| 39 | Supply and fix MCB TPN 32 Amp complete all as specified and directed. Make : L&T, Havells |
| 40 | Supply and fix MCB TPN 40-100 Amp complete all as specified and directed. Make : L&T, Havells |
| 41 | Supply and fix LED phase indicator lamps RYB (set of three)complete all as specified and directed. Make : L&T, Siemens, Meco |
| 42 | Supply and fix DOL starter type MN with single phase preventer upto 5 HP for Borewell motors Havells Cat No IHSDOAMB*A complete all as specified and directed. Make : L&T, Schinder, Havells |
| 43 | Supply and fixStar Deltastarter fully automatic suitable for upto 5-10 HP for borewell motorHavells Cat No IHSASAK2*E complete all as specified and directed. Make : L&T, Schinder, Havells |
| 44 | Supply and fix power capacitor 5 KVAR for borewell complete all as specified and directed.Make : L&T, Schinder, Havells |
| 45 | Supply and fix timer switch for borewell complete all as specified and directed.Make : L&T, HPL, Havells |
| 46 | Material and Labour for cleaning of 0.40/ 0.30 Lakh Glns under ground sump by draining out water from the tank with portable pump sets, removing sludge, mud or any other foreign materials from the bottom and cleaning internal surface by wire brushing washing internally by using bleaching powder and applying 2 coats of lime washing including re-writing the date of cleaning, capacity of the tank etc complete with white paint on black back ground complete all as specified and directed atAltinho Pump House. |
| 47 | Material and Labour for cleaning of 0.20 Lakh Glns under ground sump by draining out water from the tank with portable pump sets, removing sludge, mud or any other foreign materials from the bottom and cleaning internal surface by wire brushing washing internally by using bleaching powder and applying 2 coats of lime washing including re-writing the date of cleaning, capacity of the tank etc complete with white paint on black back ground for the following capacities complete all as specified and directed at Bambolim Military camp. |
| 48 | Material and Labour for cleaning of over head water tank by draining out water from the tank, removing sludge, mud or any other foreign materials from the bottom and internal surface and cleaning surface and cleaning by wire brushing, washing internally by using bleaching powder and applying 2 coat of lime washing including re writing the date of cleaning, capacity of the tank etc complete with white paint on black ground for the following capacities and replacement of water level indicator complete all as specified and directed. |
| 49 | (a) RCC overhead tank of 1.25 lakh gallons capacity at| Bambolim military camp area |
| 50 | (b) 0.20 Lakh gallons at Altinho |
| 51 | (c ) 0.75 Lakh gallons capacity at Bambolim Military Camp Area |
| 52 | Supply and Fix Contractor 4 pole 25 Amps complete all as specified and directed. |
| 53 | Supply and Fix Elmex Contractor of size16 sqmm complete all as specified and directed. |
| 54 | Supply only Air blower Gear Oil complete all as specified and directed. |
| 55 | Supply only blower air filter complete all as specified and directed. |
| 56 | Supply only poly electolyte chemical for disinfection of raw sewage water, ISI marked complete all as specified and as directed. |
| 57 | Supply only alum ferric base chemical for disinfection of raw sewage water, ISI marked complete all as specified and as directed. |
| 58 | Supply only poly aluminium carbon chemical for odour removal of treated sewage water, ISI markedcomplete all as specified and as directed. |
| 59 | Supply only sodium Hypochlorite 5.25% (bleach concentrate for treated sewage water, ISI markedcomplete all as specified and as directed. |
| 60 | Supplyonly ofchlorine testing kit complete all as specified and as directed. |
| 61 | COMPREHENSIVE AMC- 6 MONTH for the following machine models. All breakdown service visits along with 4 quarterly preventive maintenance visits against visit appointment and all electrical and electronic spares will be covered under AMC complete all as specified and directed.Accessories, Metallic spares such as Body parts,structural parts, wear and tear parts,plastic parts, machine alteration & modification, fabrication, will be not covered under AMC and will be chargeable additional as applicable |
| 62 | (a)INDUSTRIAL WASHER EXTRACTOR RVWE 30 Machine 1 |
| 63 | (b) INDUSTRIAL WASHER EXTRACTOR RVWE 30Machine 2 |
| 64 | (c) INDUSTRIAL WASHER EXTRACTOR RVWE 15 |
| 65 | (d)INDUSTRIAL DRYER-RTD 30 |
| 66 | (e)FLAT WORK IRONER-RFWI0416E |
| 67 | (f)VACCUM IRON TABLE |
| 68 | (g)ELECTRIC STEAM GENERATOR--MR-12 |