Tender For Repair And Maintenance Of Central Heating System Under Ge 874 Ews; 2 Attending Complaints For Day To Day / Daily Complaints By Employed Skilled Staff, Checking The Serviceability Of Fan Coil Units And Air Conditioners Of Any Capacity For Having Continous Serviceability Of Fcu / Ac For Any Number Of Times As Desired By Engr-In-Charge Incl Replacement Of Minor Spare Parts Like Gasket, Electronoc Boards And Components, Teflon Tape, Flare Nut, Tightening Of Any Loose Glycol Connections, Shifting Fcu / Ac From One Place To Another Place If Required, Heating Up The Freezed Glycol Line Anywhere About The Premises To Have Continous Flow Of Glycol Fluid, Repairing The Insulation Pipes Of Any Size By Providing Shallow Pipe / Gi Pipe As Deemed Fit For Failing The Insulation Of Pipe Line, Tightening The Loose Electrical Connections As Related With Fcu / Ac, Heating System, Cleaning The Air Filter Incl Radiator Of Fcu To The Entire Satisfaction Of Engr-In-Charge All As Directed. ( I ) Attending Complaints Of Different Nature In A Single Day In Entire Grn Incl Ops Room And Mi Room Will Be Considered One Job. ( Ii ) Any Replacement Of Major Parts Will Be Measured And Paid Seperately Under Respective Items Of Sch A. 3 ( Iii ) Any Nature Of Complaints Related To Fcu, Radiator, Bursting / Cracking / Leakage Ms Pipe Lines, Replacement Of Valves Etc Will Be Completed Round The Clock By Suitable Tradesman ( Welder With Suitable T&P Incl Potable Heating Materials, Skilled Mech Of Chs, Plumber / Fitter With Helper, Supervisor ) . ( Iv ) Job Slip Will Be Maintained By The Contractor Supervisor Under The Supervision Of Je E / M. ( V ) Any Delay, Of More Than 48 Hrs From Intimation, In Attending Complaints Will Be Reported To Higher Authorities And Suitable Penalities Will Be Incurred From Contractor ( Rs 1000 / - Per Job ) 4 Disconnecting All Electrical Connection From Central Heatingburner Of Make Ecoflamemodel No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 And Dismantlingit From Inlet Opening Central Heating Plant And Set Asidefor Repair And Maintenance , Removing Wornout / Defective Spare Parts And The Replacement Of Following Parts Including Servicing And Testing On Completion, Complete All As Specified. ( Note :- Cost Of Spares / Parts To Be Replaced Will Be Measured And Paid Seprately As Supply Only Under Respective Items Mentioned Here-In-Below ) . 5 Supply Only Ignition Transformer Suitable For Burner Make Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 6 Supply Only Oil Flowsequence Controller Suitable For Burner Make Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 7 Supply Only Fuel Feed Pump Suitable For Burnermake Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 8 Supply Only Photocell Suitable For Burnersuitable For Burner Make Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 9 Supply Only Nozzle Suitable For Burnermake Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 10 Supply Only Solenoid Valves Suitable For Burner Make Ecoflame Model No 83141558 25-10 Minor 30.1 Tldmin 15Kg / Hr And Max 28 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make - Ecoflame / Suntec / Siemen / Ce / Danfoss 11 Disconnecting All Electrical Connection From Central Heatingburnerof Makeecoflame Model No 870114 / 2 48-05 Minor 14 Tdcmin 9 Kg / Hr And Max 14.5 Kg / Hr Ip-40And Dismantlingit From Inlet Opening Central Heating Plant And Set Asidefor Repair And Maintanance , Removing Wornout / Defective Spare Parts And The Replacement Of Following Parts Including Servicing And Testing On Completion, Complete All As Specified. ( Note :- Cost Of Spares / Parts To Be Replaced Will Be Measured And Paid Seprately As Supply Only Under Respective Items Mentioned Here-In-Below ) . 12 Supply Only Ignition Transformer Suitable For Burner Make Ecoflame Model No 870114 / 2 48-05 Minor 14 Tdcmin 9 Kg / Hr And Max 14.5 Kg / Hr Ip-40Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 13 Supply Only Oil Flowsequence Controller Suitable For Burner Make Ecoflame Model Minor-14 Dtc Max Pressure 2 Bar ) Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 14 Supply Only Fuel Feed Pump Suitable For Burner Make Ecoflame Model No 870114 / 2 48-05 Minor 14 Tdcmin 9 Kg / Hr And Max 14.5 Kg / Hr Ip-40Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 15 Supply Only Photocell Suitable For Burner Make Ecoflame Model Minor-14 Dtc Max Pressure 2 Bar ) Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 16 Supply Only Nozzle Suitable For Burner Make Ecoflame Model No 870114 / 2 48-05 Minor 14 Tdcmin 9 Kg / Hr And Max 14.5 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 17 Supply Only Solenoid Valves Suitable For Burner Make Ecoflame Model No 870114 / 2 48-05 Minor 14 Tdcmin 9 Kg / Hr And Max 14.5 Kg / Hr Ip-40 Andheating Plant Model No.Whw-200 Capacity 200000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 18 Disconnecting All Electrical Connection From Boiler And Dismantling Burnerof Make Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 From Inlet Opening Central Heating Plant And Set Asidefor Repair And Maintenance , Removing Wornout / Defective Spare Parts And The Replacement Of Following Parts Including Servicing And Testing On Completion, Complete All As Specified. ( Note :- Cost Of Spares / Parts To Be Replaced Will Be Measured And Paid Seprately As Supply Only Under Respective Items Mentioned Here-In-Below ) . 19 Supply Only Ignition Transformer Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Andheating Plant Model No.Whw-100 Capacity 100000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 20 Supply Only Oil Flowsequence Controller Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 21 Supply Only Fuel Feed Pump Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Andheating Plant Model No.Whw-100 Capacity 100000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 22 Supply Only Photocell Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 23 Supply Only Nozzle Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Andheating Plant Model No.Whw-100 Capacity 100000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 24 Supply Only Solenoid Valves Suitable For Burners Ecoflame Model 011 / 32 37-09 Minor 12.1 Tl ( L+S ) Min 6 Kg / Hr And Max 12 Kg / Hr Ip-40 Bar Andheating Plant Model No.Whw-100 Capacity 100000 Kcal / Hr Make Ecoflame / Suntec / Siemen / Ce / Danfoss. 25 Dismantlingboiler Of Capacity 200000 / 100000 Kcal / Hr By Disconnecting All Electric Connections And Unscrewing Glycol Tubing To Isolate Combustion Chamber Of Boiler . Opening The Inlet Cover Ofboiler By Unscrewing The Nut Bolt And Taking Out The Unserviceablecoil Made Out Of Ms From The Chamber With Engagement Of Tripod And Chain Pulley Wihtout Damaging Internal Chamber Including Cleaning Of Carbon Content ( Scaling ) To Max Clean With The Help Of Heavy Duty Compressor Including Disposal Of Waste Outside Of Cantonment Area And Replacement Of Damage Parts Of Boiler Complete All As Directed By Engr-In-Charge. ( Note :- Cost Of Spares / Parts To Be Replaced Will Be Measured And Paid Seprately As Supply Only Under Respective Items Mentioned Here-In-Below ) . 26 Supply Only Burnt Fire Crete Matti All As Specified. 27 Supply Only Asbstos Foam For Insulation Of Gi Tubing All As Specified. 28 Supply Only Inner Glycol Tubing As Per Sample All As Specified. 29 Supply Only Inner Piping Glass As Per Sample All As Specified. 30 Supply And Fixing Of Asbestos Rope On Exhaust Ofbioler Central Heating Plant Up To Wall All As Specified And Directed. 31 Material And Labour For Replacment Of Pressure Guage Suitable For Heating Plant Model No.Whw-200 And Whw-100 As Per Sample All As Specified. 32 Material And Labour For Replacment Oftransperent Fuel Filter Suitable For Heating Plant Model No.Whw-200 And Whw-100 As Per Sample All As Specified. 33 Material And Labour For Replacment Fuel Pipefor Fuel Pump Suitable For Heating Plant Model No.Whw-200 And Whw-100 As Per Sample All As Specified. 34 Material And Labour For Replacment Fueltee Suitable For Heating Plant Model No.Whw-200 And Whw-100 As Per Sample All As Specified. 35 Supply And Fix Butterfly Gate Valve 80 Mm Dia Having Nitrate Seat And Epoxy Coated Disc Ci With Hand Leaver Pressure Rating Pn 1.0 Complete All As Specified And As Directed. Make - C&R / Kirloskar / Zoloto. 36 Supply And Fix Air Release Valve ( Arv ) To Automatically Release Trapped Air From A Heating System25mm Dia. Complete All As Specified And As Directed. Make - C&R / Kirloskar / Zoloto. 37 Disconnecting All Electrical Connections From Blower And Motorof Air Handling Unit At 428 Fd Hosp ( Make Thermax ) Blower Compartment Incl Dismantling Of All Pre Filters, Microfilters, Aluminium Perforated Sheet Over Glass Fibre Wool Panels , Blowermotor Incl Connecting After Repair / Replacements Of Following Parts Including Servicing And Testing On Completion, All As Specified And Directed By Eng-In-Charge. ( Note :- Cost Of Spares / Parts To Be Replaced Will Be Measured And Paid Seprately As Supply Only Under Respective Items Mentioned Here-In-Below ) . 38 Supply Only Prefilters Having Aluminium Frame As Per Sample. 39 Supply Only Micro Filters Having Aluminium Frame As Per Sample. 40 Supply Only Aluminium Perforated Sheet Panel Over 50 Mm Thick Glass Fibre Woolas Per Sample. 41 Supply Onlycentre Bearings For Blower Shaft Incl Ci Housingall As Per Sample. 42 Supply Only V Belts Size B77 As Per Sample All As Specified. 43 Supply Only Foam For Ahu Shatters As Per Sample All Asspecified. 44 Repair Of Rediator Checking For Leakage Of Copper Tubes And Discaling Of Glycol Tubing Including Welding Bleasing As Requaired At Site. 45 Cleaning The Chimney Of Heating Plants From Inside With Wire Brushes And Removing Away All Carbon Deposited And Painting The Outer Surface Of The Chimney With Two Coats Of Heat Proof Black Paint After Preparing The Surface For Repainting Complete All As Directed. 46 Supply And Fixing In Replacement Decorative Wall Mounted Fan Coil Units Of Capacity 4500 Kcal / Hr Cfm 470 Complete With Grill, Esb Casing 3 Speed Motor, Wall Mounting Brackets Inlet Out Let Mainfoldall As Directed And Specified By Engr-In-Charge. Make - Western Model No Wfc-4 Or Equivalent In Caryaire / Zeco / Airflow. 47 Repair Of Damages In Chs Pipeline System With Smaw / Gmaw / Gtaw Welding Work, Including Electrodes / Filler Material, For One Damage Of Upto 2 Meters Long On The Pipeline Complete All As Directed. 48 Supply And Laying, Connecting, Fixing And Testing In Replacement Of 3 Layer Poly Propylene Random Copolymer Composit Pipes 25Mm / 20Mm Bore Od Pipe Conforming To Pn1.6 Complete With Fittings Duly Insulated With 13Mm Thick Closed Cell Elastomeric Insulation 30 To 40 Kg / M3 Density All As Directed And Specified By Engr-In-Charge. 49 M & L For Insulation Of M S Pipe 25 Mm With Puf Slab 30 Mm Thickand Gi Cladding With 26 Gauge Gi Sheet Complete All As Specified And Directed By Engr-In-Charge. 50 M & L For Insulation Of M S Pipe 32 Mm With Puf Slab 30 Mm Thickand Gi Cladding With 26 Gauge Gi Sheet Complete All As Specified And Directed By Engr-In-Charge. 51 Supply & Fixing In Replacemnet Of Gun Metal Steam Stop Valve Of 20Mm Bore Screwed On Both Ends. Make : Sant, Zoloto, Vbi. 52 Supply & Fixing In Replacement Of Gun Metal Steam Stop Valve Of 15Mm Bore Screwed On Both Ends.Make : Sant, Vbi, Zoloto. 53 Supply And Fixing In Replacement Heavy Duty Wiremesh Bounded Fuel Pipe With Flare Nutboth Ends 600 Mm Length As Per Sample Complete All As Directed By Engr-In-Charge. 54 Supply And Fixing In Replacement Fuel Filter Element As Per Sample Complete All As Directed By Engr-In-Charge. 55 Supply And Fixing In Replacement Nitrile Foam Insulation Over Chs Ms Erw Heating Pipes, Of Size 4 Id X 3 / 4 Tk ( 102 Mm X 19Mm ) All As Specified And Directed. Make : Superlon, Sant. 56 Supply And Fixing In Replacement Nitrile Foam Insulation Over Chs Ms Erw Heating Pipes, Of Size 3 1 / 8 Id X 1 / 2 Tk ( 80 Mm X 13Mm ) All As Specified And Directed. Make : Superlon, Sant. 57 Repair And Maintenance Of Wall Mounted Type Fan Coil Unit ( Inner Unit Complete ) Of Make Western Modle - Wfc-04 / Wfc-3000 After Disconnecting Electric Connections Including Servicing And Washing Of Condensor And Replacement Of Following Parts With Existing Make ( Capacity Upto 4500Kcal / Hr ) And Specifications As Approved By The Engineer-In-Charge: Note :-The Cost Of Labour For Repair And Replacement Of Worn Out / Defective Spare Parts Included In This Item And Parts To Be Replaced Shall Be Measured And Paid Separetely And Minor Part Included With This Like Tap Roll Etc. 58 Supply, Installation, Commissioning And Testing Of Blower Motor For Fcu Of Make Western Model No Wfc-04 / Wfc-3000. 59 Supply, Installation, Commissioning And Testing Of Pcb For Fcu Of Make Western Model No Wfc-04 / Wfc-3000 And For Air Conditioner Of Capacity Upto 2 Ton. 60 Supply, Installation, Commissioning And Testing Of Display Board For Fcu Of Make Western Model No Wfc-04 / Wfc-3000. 61 Supply, Installation, Commissioning And Testing Of Nozzle Sets For Inner Units For Fcu Of Make Western Model No Wfc-04 / Wfc-3000, As Per Sample. 62 Supply, Installation, Commissioning And Testing Of Pressure Valve For Inner Units For Fcu Of Make Western Model No Wfc-04 / Wfc-3000, As Per Sample. 63 Supply, Installation, Commissioning And Testing Of Steel Rings For Stopage Of Leakage In Inner Units Pipe For Fcu Of Make Western Model No Wfc-04 / Wfc-3000, As Per Sample. 64 Supply And Fixing 32Mm Bore Gun Metal Globe Gate Valve ( Isi Marked ) Iron Wheel Head, Screwed Both Ends For Iron Pipe Fixed In Repair Complete.Make -Kirloskar / Bvi / L&T / Leader.