Tender For Providing Distribution Line With 15 Fhtc At Jakkalammanpatty House Of Kothapuli, Dindigul-Tamil Nadu

Local Bodies has published Tender For Providing Distribution Line With 15 Fhtc At Jakkalammanpatty House Of Kothapuli. Submission Date for this Tender is 06-12-2023. Pipe Laying Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40861855
Tender For Providing Distribution Line With 15 Fhtc At Jakkalammanpatty House Of Kothapuli
Open Tender
Indian
Tamil Nadu
Dindigul
06-12-2023

Tender Details

Tender For Providing Distribution Line With 15 Fhtc At Jakkalammanpatty House Of Kothapuli; 1. Providing Distribution Line With 15 Fhtc @ Jakkalammanpattyh / O Kothapuli Estimate Amount Rs.0.92 Lakhs 2 63Mm Pvc Pipe 4 Ksc 3 63Mm Pvc Elbow 4 63Mm Pvc Mta 5 50Mm Gi Pipe 6 50Mm Gi Coupling 7 Solvent Cement 8 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 9 A ) For Water Line 10 B ) For Fhtc Line 11 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 12 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 13 Fhtc Arrangements 14 63Mm Pvc Saddle Piece 15 20 Mm Gi Pipe 16 20Mm Gielbow 17 25Mm Pvc Pipe ( 6 Kg / Sqm ) 18 25Mm Pvc Elbow 19 20Mm X 15Mm Gi Reducer 20 20Mm Gm Ball Valve 21 20Mm Gicoupling 22 15Mm Brass Tap 23 20Mm Brass Ferrule 24 Flowcontrol Valve 25 Labour Charges For Cutting Charges For 20Mm Gi Pipe 26 Labour Charges For Threading Charges For 20Mm Gi Pipe 27 Labour For Cutting Open Road For Laying Water Mains Or Sewer 28 Provision For Vertical Rcc Post ( Pipe Stand ) 29 Provision For Rcc Platform ( 0.6Mx0.6M ) 30 Name Board Charges 31 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 32 2 .Providing Distribution Line With 15 Fhtc @ Kathiranampattyh / O Kothapuliestimate Amount Rs.1.66Lakhs 33 63Mm Pvc Pipe 4 Ksc 34 63Mm Pvc Elbow 35 63Mm Pvc Mta 36 50Mm Gi Pipe 37 50Mm Gi Coupling 38 Solvent Cement 39 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 40 A ) For Water Line 41 B ) For Fhtc Line 42 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 43 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 44 Fhtc Arrangements 45 63Mm Pvc Saddle Piece 46 20 Mm Gi Pipe 47 20Mm Gielbow 48 25Mm Pvc Pipe ( 6 Kg / Sqm ) 49 25Mm Pvc Elbow 50 20Mm X 15Mm Gi Reducer 51 20Mm Gm Ball Valve 52 20Mm Gicoupling 53 15Mm Brass Tap 54 20Mm Brass Ferrule 55 Flowcontrol Valve 56 Labour Charges For Cutting Charges For 20Mm Gi Pipe 57 Labour Charges For Threading Charges For 20Mm Gi Pipe 58 Labour For Cutting Open Road For Laying Water Mains Or Sewer 59 Provision For Vertical Rcc Post ( Pipe Stand ) 60 Provision For Rcc Platform ( 0.6Mx0.6M ) 61 Name Board Charges 62 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 63 3 .Providing Distribution Line With 25 Fhtc @ Kemanampatty H / O Koth1.75 Lakhs 64 63Mm Pvc Pipe 4 Ksc 65 63Mm Pvc Elbow 66 63Mm Pvc Mta 67 50Mm Gi Pipe 68 50Mm Gi Coupling 69 Solvent Cement 70 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 71 A ) For Water Line 72 B ) For Fhtc Line 73 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 74 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 75 Fhtc Arrangements 76 63Mm Pvc Saddle Piece 77 20 Mm Gi Pipe 78 20Mm Gielbow 79 25Mm Pvc Pipe ( 6 Kg / Sqm ) 80 25Mm Pvc Elbow 81 20Mm X 15Mm Gi Reducer 82 20Mm Gm Ball Valve 83 20Mm Gicoupling 84 15Mm Brass Tap 85 20Mm Brass Ferrule 86 Flowcontrol Valve 87 Labour Charges For Cutting Charges For 20Mm Gi Pipe 88 Labour Charges For Threading Charges For 20Mm Gi Pipe 89 Labour For Cutting Open Road For Laying Water Mains Or Sewer 90 Provision For Vertical Rcc Post ( Pipe Stand ) 91 Provision For Rcc Platform ( 0.6Mx0.6M ) 92 Name Board Charges 93 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 94 4 .Providing Distribution Line With 30 Fhtc @ Reddiyarchatramh / O Kothapuli Estimate Amount Rs.1.82 Lakhs 95 63Mm Pvc Pipe 4 Ksc 96 63Mm Pvc Elbow 97 63Mm Pvc Mta 98 50Mm Gi Pipe 99 50Mm Gi Coupling 100 Solvent Cement 101 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 102 A ) For Water Line 103 B ) For Fhtc Line 104 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 105 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 106 Fhtc Arrangements 107 63Mm Pvc Saddle Piece 108 20 Mm Gi Pipe 109 20Mm Gielbow 110 25Mm Pvc Pipe ( 6 Kg / Sqm ) 111 25Mm Pvc Elbow 112 20Mm X 15Mm Gi Reducer 113 20Mm Gm Ball Valve 114 20Mm Gicoupling 115 15Mm Brass Tap 116 20Mm Brass Ferrule 117 Flowcontrol Valve 118 Labour Charges For Cutting Charges For 20Mm Gi Pipe 119 Labour Charges For Threading Charges For 20Mm Gi Pipe 120 Labour For Cutting Open Road For Laying Water Mains Or Sewer 121 Provision For Vertical Rcc Post ( Pipe Stand ) 122 Provision For Rcc Platform ( 0.6Mx0.6M ) 123 Name Board Charges 124 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 125 5 .Providing Distribution Line With 10Fhtc @ Thathankottai H / O Kothapuli Estimate Amount Rs.2.0Lakhs 126 63Mm Pvc Pipe 4 Ksc 127 63Mm Pvc Elbow 128 63Mm Pvc Mta 129 50Mm Gi Pipe 130 50Mm Gi Coupling 131 Solvent Cement 132 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 133 A ) For Water Line 134 B ) For Fhtc Line 135 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 136 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 137 Fhtc Arrangements 138 63Mm Pvc Saddle Piece 139 20 Mm Gi Pipe 140 20Mm Gielbow 141 25Mm Pvc Pipe ( 6 Kg / Sqm ) 142 25Mm Pvc Elbow 143 20Mm X 15Mm Gi Reducer 144 20Mm Gm Ball Valve 145 20Mm Gicoupling 146 15Mm Brass Tap 147 20Mm Brass Ferrule 148 Flowcontrol Valve 149 Labour Charges For Cutting Charges For 20Mm Gi Pipe 150 Labour Charges For Threading Charges For 20Mm Gi Pipe 151 Labour For Cutting Open Road For Laying Water Mains Or Sewer 152 Provision For Vertical Rcc Post ( Pipe Stand ) 153 Provision For Rcc Platform ( 0.6Mx0.6M ) 154 Name Board Charges 155 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 156 6 .Providing Distribution Line With 10Fhtc @ Thoppupattyh / O Kothapuli Estimate Amount Rs.1.86 Lakhs 157 63Mm Pvc Pipe 4 Ksc 158 63Mm Pvc Elbow 159 63Mm Pvc Mta 160 50Mm Gi Pipe 161 50Mm Gi Coupling 162 Solvent Cement 163 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 164 A ) For Water Line 165 B ) For Fhtc Line 166 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 167 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 168 Fhtc Arrangements 169 63Mm Pvc Saddle Piece 170 20 Mm Gi Pipe 171 20Mm Gielbow 172 25Mm Pvc Pipe ( 6 Kg / Sqm ) 173 25Mm Pvc Elbow 174 20Mm X 15Mm Gi Reducer 175 20Mm Gm Ball Valve 176 20Mm Gicoupling 177 15Mm Brass Tap 178 20Mm Brass Ferrule 179 Flowcontrol Valve 180 Labour Charges For Cutting Charges For 20Mm Gi Pipe 181 Labour Charges For Threading Charges For 20Mm Gi Pipe 182 Labour For Cutting Open Road For Laying Water Mains Or Sewer 183 Provision For Vertical Rcc Post ( Pipe Stand ) 184 Provision For Rcc Platform ( 0.6Mx0.6M ) 185 Name Board Charges 186 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 187 7.Providing Distribution Line With 18Fhtc @ Velampattyh / Okothapuli Estimate Amount Rs.1.13 Lakhs 188 63Mm Pvc Pipe 4 Ksc 189 63Mm Pvc Elbow 190 63Mm Pvc Mta 191 50Mm Gi Pipe 192 50Mm Gi Coupling 193 Solvent Cement 194 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 195 A ) For Water Line 196 B ) For Fhtc Line 197 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 198 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 199 Fhtc Arrangements 200 63Mm Pvc Saddle Piece 201 20 Mm Gi Pipe 202 20Mm Gielbow 203 25Mm Pvc Pipe ( 6 Kg / Sqm ) 204 25Mm Pvc Elbow 205 20Mm X 15Mm Gi Reducer 206 20Mm Gm Ball Valve 207 20Mm Gicoupling 208 15Mm Brass Tap 209 20Mm Brass Ferrule 210 Flowcontrol Valve 211 Labour Charges For Cutting Charges For 20Mm Gi Pipe 212 Labour Charges For Threading Charges For 20Mm Gi Pipe 213 Labour For Cutting Open Road For Laying Water Mains Or Sewer 214 Provision For Vertical Rcc Post ( Pipe Stand ) 215 Provision For Rcc Platform ( 0.6Mx0.6M ) 216 Name Board Charges 217 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 218 8 .Providing Distribution Line With 15 Fhtc @ Velnagar H / O Kothapuli Estimate Amount Rs.10.95Lakhs 219 63Mm Pvc Pipe 4 Ksc 220 63Mm Pvc Elbow 221 63Mm Pvc Mta 222 50Mm Gi Pipe 223 50Mm Gi Coupling 224 Solvent Cement 225 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 226 A ) For Water Line 227 B ) For Fhtc Line 228 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 229 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 230 Fhtc Arrangements 231 63Mm Pvc Saddle Piece 232 20 Mm Gi Pipe 233 20Mm Gielbow 234 25Mm Pvc Pipe ( 6 Kg / Sqm ) 235 25Mm Pvc Elbow 236 20Mm X 15Mm Gi Reducer 237 20Mm Gm Ball Valve 238 20Mm Gicoupling 239 15Mm Brass Tap 240 20Mm Brass Ferrule 241 Flowcontrol Valve 242 Labour Charges For Cutting Charges For 20Mm Gi Pipe 243 Labour Charges For Threading Charges For 20Mm Gi Pipe 244 Labour For Cutting Open Road For Laying Water Mains Or Sewer 245 Provision For Vertical Rcc Post ( Pipe Stand ) 246 Provision For Rcc Platform ( 0.6Mx0.6M ) 247 Name Board Charges 248 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 249 9 .Providing Distribution Line With23 Fhtc @ Gandhinagarh / O Palakanuthuestimate Amount Rs.1.17Lakhs 250 63Mm Pvc Pipe 4 Ksc 251 63Mm Pvc Elbow 252 63Mm Pvc Mta 253 50Mm Gi Pipe 254 50Mm Gi Coupling 255 Solvent Cement 256 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 257 A ) For Water Line 258 B ) For Fhtc Line 259 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 260 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 261 Fhtc Arrangements 262 63Mm Pvc Saddle Piece 263 20 Mm Gi Pipe 264 20Mm Gielbow 265 25Mm Pvc Pipe ( 6 Kg / Sqm ) 266 25Mm Pvc Elbow 267 20Mm X 15Mm Gi Reducer 268 20Mm Gm Ball Valve 269 20Mm Gicoupling 270 15Mm Brass Tap 271 20Mm Brass Ferrule 272 Flowcontrol Valve 273 Labour Charges For Cutting Charges For 20Mm Gi Pipe 274 Labour Charges For Threading Charges For 20Mm Gi Pipe 275 Labour For Cutting Open Road For Laying Water Mains Or Sewer 276 Provision For Vertical Rcc Post ( Pipe Stand ) 277 Provision For Rcc Platform ( 0.6Mx0.6M ) 278 Name Board Charges 279 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 280 10 .Providing Distribution Line With 8 Fhtc @ Kittayagondanpatty H / O Palakanuthu Estimate Amount Rs.1.37Lakhs 281 63Mm Pvc Pipe 4 Ksc 282 63Mm Pvc Elbow 283 63Mm Pvc Mta 284 50Mm Gi Pipe 285 50Mm Gi Coupling 286 Solvent Cement 287 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 288 A ) For Water Line 289 B ) For Fhtc Line 290 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 291 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 292 Fhtc Arrangements 293 63Mm Pvc Saddle Piece 294 20 Mm Gi Pipe 295 20Mm Gielbow 296 25Mm Pvc Pipe ( 6 Kg / Sqm ) 297 25Mm Pvc Elbow 298 20Mm X 15Mm Gi Reducer 299 20Mm Gm Ball Valve 300 20Mm Gicoupling 301 15Mm Brass Tap 302 20Mm Brass Ferrule 303 Flowcontrol Valve 304 Labour Charges For Cutting Charges For 20Mm Gi Pipe 305 Labour Charges For Threading Charges For 20Mm Gi Pipe 306 Labour For Cutting Open Road For Laying Water Mains Or Sewer 307 Provision For Vertical Rcc Post ( Pipe Stand ) 308 Provision For Rcc Platform ( 0.6Mx0.6M ) 309 Name Board Charges 310 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 311 11 .Providing Distribution Line With 25 Fhtc @ Thathagoundanur H / O Palakanuthuestimate Amount Rs.1.97 Lakhs 312 63Mm Pvc Pipe 4 Ksc 313 63Mm Pvc Elbow 314 63Mm Pvc Mta 315 50Mm Gi Pipe 316 50Mm Gi Coupling 317 Solvent Cement 318 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 319 A ) For Water Line 320 B ) For Fhtc Line 321 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 322 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 323 Fhtc Arrangements 324 63Mm Pvc Saddle Piece 325 20 Mm Gi Pipe 326 20Mm Gielbow 327 25Mm Pvc Pipe ( 6 Kg / Sqm ) 328 25Mm Pvc Elbow 329 20Mm X 15Mm Gi Reducer 330 20Mm Gm Ball Valve 331 20Mm Gicoupling 332 15Mm Brass Tap 333 20Mm Brass Ferrule 334 Flowcontrol Valve 335 Labour Charges For Cutting Charges For 20Mm Gi Pipe 336 Labour Charges For Threading Charges For 20Mm Gi Pipe 337 Labour For Cutting Open Road For Laying Water Mains Or Sewer 338 Provision For Vertical Rcc Post ( Pipe Stand ) 339 Provision For Rcc Platform ( 0.6Mx0.6M ) 340 Name Board Charges 341 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 342 12 .Providing Distribution Line With 25 Fhtc @ Puthuettamanayakkanpatty H / Opalakanuthuestimate Amount Rs.1.50 Lakhs 343 63Mm Pvc Pipe 4 Ksc 344 63Mm Pvc Elbow 345 63Mm Pvc Mta 346 50Mm Gi Pipe 347 50Mm Gi Coupling 348 Solvent Cement 349 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 350 A ) For Water Line 351 B ) For Fhtc Line 352 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 353 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 354 Fhtc Arrangements 355 63Mm Pvc Saddle Piece 356 20 Mm Gi Pipe 357 20Mm Gielbow 358 25Mm Pvc Pipe ( 6 Kg / Sqm ) 359 25Mm Pvc Elbow 360 20Mm X 15Mm Gi Reducer 361 20Mm Gm Ball Valve 362 20Mm Gicoupling 363 15Mm Brass Tap 364 20Mm Brass Ferrule 365 Flowcontrol Valve 366 Labour Charges For Cutting Charges For 20Mm Gi Pipe 367 Labour Charges For Threading Charges For 20Mm Gi Pipe 368 Labour For Cutting Open Road For Laying Water Mains Or Sewer 369 Provision For Vertical Rcc Post ( Pipe Stand ) 370 Provision For Rcc Platform ( 0.6Mx0.6M ) 371 Name Board Charges 372 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 373 13 .Providing Distribution Line With 55Fhtc @ Pothinayakkanpatty H / O Palakanuthuestimate Amount Rs.5.67 Lakhs 374 63Mm Pvc Pipe 4 Ksc 375 63Mm Pvc Elbow 376 63Mm Pvc Mta 377 50Mm Gi Pipe 378 50Mm Gi Coupling 379 Solvent Cement 380 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 381 A ) For Water Line 382 B ) For Fhtc Line 383 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 384 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 385 Fhtc Arrangements 386 63Mm Pvc Saddle Piece 387 20 Mm Gi Pipe 388 20Mm Gielbow 389 25Mm Pvc Pipe ( 6 Kg / Sqm ) 390 25Mm Pvc Elbow 391 20Mm X 15Mm Gi Reducer 392 20Mm Gm Ball Valve 393 20Mm Gicoupling 394 15Mm Brass Tap 395 20Mm Brass Ferrule 396 Flowcontrol Valve 397 Labour Charges For Cutting Charges For 20Mm Gi Pipe 398 Labour Charges For Threading Charges For 20Mm Gi Pipe 399 Labour For Cutting Open Road For Laying Water Mains Or Sewer 400 Provision For Vertical Rcc Post ( Pipe Stand ) 401 Provision For Rcc Platform ( 0.6Mx0.6M ) 402 Name Board Charges 403 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 404 14 .Providing Distribution Line With 42 Fhtc @ Alagupatty Ad Colony H / O Alagupattyestimate Amount Rs.4.67Lakhs 405 63Mm Pvc Pipe 4 Ksc 406 63Mm Pvc Elbow 407 63Mm Pvc Mta 408 50Mm Gi Pipe 409 50Mm Gi Coupling 410 Solvent Cement 411 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 412 A ) For Water Line 413 B ) For Fhtc Line 414 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 415 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 416 Fhtc Arrangements 417 63Mm Pvc Saddle Piece 418 20 Mm Gi Pipe 419 20Mm Gielbow 420 25Mm Pvc Pipe ( 6 Kg / Sqm ) 421 25Mm Pvc Elbow 422 20Mm X 15Mm Gi Reducer 423 20Mm Gm Ball Valve 424 20Mm Gicoupling 425 15Mm Brass Tap 426 20Mm Brass Ferrule 427 Flowcontrol Valve 428 Labour Charges For Cutting Charges For 20Mm Gi Pipe 429 Labour Charges For Threading Charges For 20Mm Gi Pipe 430 Labour For Cutting Open Road For Laying Water Mains Or Sewer 431 Provision For Vertical Rcc Post ( Pipe Stand ) 432 Provision For Rcc Platform ( 0.6Mx0.6M ) 433 Name Board Charges 434 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 435 15 .Providing Distribution Line With23 Fhtc @ Alagupatty Adhidravedarh / O Alagupatty Estimate Amount Rs.4.33Lakhs 436 63Mm Pvc Pipe 4 Ksc 437 63Mm Pvc Elbow 438 63Mm Pvc Mta 439 50Mm Gi Pipe 440 50Mm Gi Coupling 441 Solvent Cement 442 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 443 A ) For Water Line 444 B ) For Fhtc Line 445 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 446 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 447 Fhtc Arrangements 448 63Mm Pvc Saddle Piece 449 20 Mm Gi Pipe 450 20Mm Gielbow 451 25Mm Pvc Pipe ( 6 Kg / Sqm ) 452 25Mm Pvc Elbow 453 20Mm X 15Mm Gi Reducer 454 20Mm Gm Ball Valve 455 20Mm Gicoupling 456 15Mm Brass Tap 457 20Mm Brass Ferrule 458 Flowcontrol Valve 459 Labour Charges For Cutting Charges For 20Mm Gi Pipe 460 Labour Charges For Threading Charges For 20Mm Gi Pipe 461 Labour For Cutting Open Road For Laying Water Mains Or Sewer 462 Provision For Vertical Rcc Post ( Pipe Stand ) 463 Provision For Rcc Platform ( 0.6Mx0.6M ) 464 Name Board Charges 465 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 466 16 .Providing Distribution Line With 20 Fhtc @ Annai Therasapuramh / O Alagupatty Estimate Amount Rs.4.39Lakhs 467 63Mm Pvc Pipe 4 Ksc 468 63Mm Pvc Elbow 469 63Mm Pvc Mta 470 50Mm Gi Pipe 471 50Mm Gi Coupling 472 Solvent Cement 473 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 474 A ) For Water Line 475 B ) For Fhtc Line 476 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 477 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 478 Fhtc Arrangements 479 63Mm Pvc Saddle Piece 480 20 Mm Gi Pipe 481 20Mm Gielbow 482 25Mm Pvc Pipe ( 6 Kg / Sqm ) 483 25Mm Pvc Elbow 484 20Mm X 15Mm Gi Reducer 485 20Mm Gm Ball Valve 486 20Mm Gicoupling 487 15Mm Brass Tap 488 20Mm Brass Ferrule 489 Flowcontrol Valve 490 Labour Charges For Cutting Charges For 20Mm Gi Pipe 491 Labour Charges For Threading Charges For 20Mm Gi Pipe 492 Labour For Cutting Open Road For Laying Water Mains Or Sewer 493 Provision For Vertical Rcc Post ( Pipe Stand ) 494 Provision For Rcc Platform ( 0.6Mx0.6M ) 495 Name Board Charges 496 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 497 17 .Providing Distribution Line With 25 Fhtc @ Alagupatty New Ad Colony H / O Alagupatty Estimate Amount Rs5.20Lakhs 498 63Mm Pvc Pipe 4 Ksc 499 63Mm Pvc Elbow 500 63Mm Pvc Mta 501 50Mm Gi Pipe 502 50Mm Gi Coupling 503 Solvent Cement 504 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 505 A ) For Water Line 506 B ) For Fhtc Line 507 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 508 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 509 Fhtc Arrangements 510 63Mm Pvc Saddle Piece 511 20 Mm Gi Pipe 512 20Mm Gielbow 513 25Mm Pvc Pipe ( 6 Kg / Sqm ) 514 25Mm Pvc Elbow 515 20Mm X 15Mm Gi Reducer 516 20Mm Gm Ball Valve 517 20Mm Gicoupling 518 15Mm Brass Tap 519 20Mm Brass Ferrule 520 Flowcontrol Valve 521 Labour Charges For Cutting Charges For 20Mm Gi Pipe 522 Labour Charges For Threading Charges For 20Mm Gi Pipe 523 Labour For Cutting Open Road For Laying Water Mains Or Sewer 524 Provision For Vertical Rcc Post ( Pipe Stand ) 525 Provision For Rcc Platform ( 0.6Mx0.6M ) 526 Name Board Charges 527 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 528 18 .Providing Distribution Line With 25 Fhtc @ Theppakulathupattih / O Alagupatty Estimate Amount Rs.5.84Lakhs 529 63Mm Pvc Pipe 4 Ksc 530 63Mm Pvc Elbow 531 63Mm Pvc Mta 532 50Mm Gi Pipe 533 50Mm Gi Coupling 534 Solvent Cement 535 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 536 A ) For Water Line 537 B ) For Fhtc Line 538 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 539 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 540 Fhtc Arrangements 541 63Mm Pvc Saddle Piece 542 20 Mm Gi Pipe 543 20Mm Gielbow 544 25Mm Pvc Pipe ( 6 Kg / Sqm ) 545 25Mm Pvc Elbow 546 20Mm X 15Mm Gi Reducer 547 20Mm Gm Ball Valve 548 20Mm Gicoupling 549 15Mm Brass Tap 550 20Mm Brass Ferrule 551 Flowcontrol Valve 552 Labour Charges For Cutting Charges For 20Mm Gi Pipe 553 Labour Charges For Threading Charges For 20Mm Gi Pipe 554 Labour For Cutting Open Road For Laying Water Mains Or Sewer 555 Provision For Vertical Rcc Post ( Pipe Stand ) 556 Provision For Rcc Platform ( 0.6Mx0.6M ) 557 Name Board Charges 558 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 559 19 .Providing Distribution Line With 25 Fhtc @ Nallupulikottaih / O Pudhuchatramestimate Amount Rs 2.84 Lakhs 560 63Mm Pvc Pipe 4 Ksc 561 63Mm Pvc Elbow 562 63Mm Pvc Mta 563 50Mm Gi Pipe 564 50Mm Gi Coupling 565 Solvent Cement 566 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 567 A ) For Water Line 568 B ) For Fhtc Line 569 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 570 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 571 Fhtc Arrangements 572 63Mm Pvc Saddle Piece 573 20 Mm Gi Pipe 574 20Mm Gielbow 575 25Mm Pvc Pipe ( 6 Kg / Sqm ) 576 25Mm Pvc Elbow 577 20Mm X 15Mm Gi Reducer 578 20Mm Gm Ball Valve 579 20Mm Gicoupling 580 15Mm Brass Tap 581 20Mm Brass Ferrule 582 Flowcontrol Valve 583 Labour Charges For Cutting Charges For 20Mm Gi Pipe 584 Labour Charges For Threading Charges For 20Mm Gi Pipe 585 Labour For Cutting Open Road For Laying Water Mains Or Sewer 586 Provision For Vertical Rcc Post ( Pipe Stand ) 587 Provision For Rcc Platform ( 0.6Mx0.6M ) 588 Name Board Charges 589 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 590 20 .Providing Distribution Line With 15 Fhtc @ Kambilliyanaickenpatty H / Opudhuchatramestimate Amount Rs2.37Lakhs 591 63Mm Pvc Pipe 4 Ksc 592 63Mm Pvc Elbow 593 63Mm Pvc Mta 594 50Mm Gi Pipe 595 50Mm Gi Coupling 596 Solvent Cement 597 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 598 A ) For Water Line 599 B ) For Fhtc Line 600 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 601 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 602 Fhtc Arrangements 603 63Mm Pvc Saddle Piece 604 20 Mm Gi Pipe 605 20Mm Gielbow 606 25Mm Pvc Pipe ( 6 Kg / Sqm ) 607 25Mm Pvc Elbow 608 20Mm X 15Mm Gi Reducer 609 20Mm Gm Ball Valve 610 20Mm Gicoupling 611 15Mm Brass Tap 612 20Mm Brass Ferrule 613 Flowcontrol Valve 614 Labour Charges For Cutting Charges For 20Mm Gi Pipe 615 Labour Charges For Threading Charges For 20Mm Gi Pipe 616 Labour For Cutting Open Road For Laying Water Mains Or Sewer 617 Provision For Vertical Rcc Post ( Pipe Stand ) 618 Provision For Rcc Platform ( 0.6Mx0.6M ) 619 Name Board Charges 620 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 621 21.Providing Distribution Line With 35Fhtc @ Pudhuchatram H / O Pudhuchatram Estimate Amount Rs.8.77 Lakhs 622 63Mm Pvc Pipe 4 Ksc 623 63Mm Pvc Elbow 624 63Mm Pvc Mta 625 50Mm Gi Pipe 626 50Mm Gi Coupling 627 Solvent Cement 628 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 629 A ) For Water Line 630 B ) For Fhtc Line 631 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 632 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 633 Fhtc Arrangements 634 63Mm Pvc Saddle Piece 635 20 Mm Gi Pipe 636 20Mm Gielbow 637 25Mm Pvc Pipe ( 6 Kg / Sqm ) 638 25Mm Pvc Elbow 639 20Mm X 15Mm Gi Reducer 640 20Mm Gm Ball Valve 641 20Mm Gicoupling 642 15Mm Brass Tap 643 20Mm Brass Ferrule 644 Flowcontrol Valve 645 Labour Charges For Cutting Charges For 20Mm Gi Pipe 646 Labour Charges For Threading Charges For 20Mm Gi Pipe 647 Labour For Cutting Open Road For Laying Water Mains Or Sewer 648 Provision For Vertical Rcc Post ( Pipe Stand ) 649 Provision For Rcc Platform ( 0.6Mx0.6M ) 650 Name Board Charges 651 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 652 22.Providing Distribution Line With 47 Fhtc @ Sattaiyappanur H / O Pudhuchatramestimate Amount Rs.4.84Lakhs 653 63Mm Pvc Pipe 4 Ksc 654 63Mm Pvc Elbow 655 63Mm Pvc Mta 656 50Mm Gi Pipe 657 50Mm Gi Coupling 658 Solvent Cement 659 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 660 A ) For Water Line 661 B ) For Fhtc Line 662 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 663 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 664 Fhtc Arrangements 665 63Mm Pvc Saddle Piece 666 20 Mm Gi Pipe 667 20Mm Gielbow 668 25Mm Pvc Pipe ( 6 Kg / Sqm ) 669 25Mm Pvc Elbow 670 20Mm X 15Mm Gi Reducer 671 20Mm Gm Ball Valve 672 20Mm Gicoupling 673 15Mm Brass Tap 674 20Mm Brass Ferrule 675 Flowcontrol Valve 676 Labour Charges For Cutting Charges For 20Mm Gi Pipe 677 Labour Charges For Threading Charges For 20Mm Gi Pipe 678 Labour For Cutting Open Road For Laying Water Mains Or Sewer 679 Provision For Vertical Rcc Post ( Pipe Stand ) 680 Provision For Rcc Platform ( 0.6Mx0.6M ) 681 Name Board Charges 682 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 683 23 .Providing Distribution Line With25 Fhtc @ Thasanaickenpattyh / O Pudhuchatramestimate Amount Rs 2.93Lakhs 684 63Mm Pvc Pipe 4 Ksc 685 63Mm Pvc Elbow 686 63Mm Pvc Mta 687 50Mm Gi Pipe 688 50Mm Gi Coupling 689 Solvent Cement 690 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 691 A ) For Water Line 692 B ) For Fhtc Line 693 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 694 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 695 Fhtc Arrangements 696 63Mm Pvc Saddle Piece 697 20 Mm Gi Pipe 698 20Mm Gielbow 699 25Mm Pvc Pipe ( 6 Kg / Sqm ) 700 25Mm Pvc Elbow 701 20Mm X 15Mm Gi Reducer 702 20Mm Gm Ball Valve 703 20Mm Gicoupling 704 15Mm Brass Tap 705 20Mm Brass Ferrule 706 Flowcontrol Valve 707 Labour Charges For Cutting Charges For 20Mm Gi Pipe 708 Labour Charges For Threading Charges For 20Mm Gi Pipe 709 Labour For Cutting Open Road For Laying Water Mains Or Sewer 710 Provision For Vertical Rcc Post ( Pipe Stand ) 711 Provision For Rcc Platform ( 0.6Mx0.6M ) 712 Name Board Charges 713 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 714 24 .Providing Distribution Line With 20 Fhtc @ Bommanallurh / O Pudhuchatram Estimate Amount Rs1.32 Lakhs 715 63Mm Pvc Pipe 4 Ksc 716 63Mm Pvc Elbow 717 63Mm Pvc Mta 718 50Mm Gi Pipe 719 50Mm Gi Coupling 720 Solvent Cement 721 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 722 A ) For Water Line 723 B ) For Fhtc Line 724 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 725 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 726 Fhtc Arrangements 727 63Mm Pvc Saddle Piece 728 20 Mm Gi Pipe 729 20Mm Gielbow 730 25Mm Pvc Pipe ( 6 Kg / Sqm ) 731 25Mm Pvc Elbow 732 20Mm X 15Mm Gi Reducer 733 20Mm Gm Ball Valve 734 20Mm Gicoupling 735 15Mm Brass Tap 736 20Mm Brass Ferrule 737 Flowcontrol Valve 738 Labour Charges For Cutting Charges For 20Mm Gi Pipe 739 Labour Charges For Threading Charges For 20Mm Gi Pipe 740 Labour For Cutting Open Road For Laying Water Mains Or Sewer 741 Provision For Vertical Rcc Post ( Pipe Stand ) 742 Provision For Rcc Platform ( 0.6Mx0.6M ) 743 Name Board Charges 744 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 745 25 .Providing Distribution Line With 18Fhtc @ Paraiyur H / O Pudhuchatram Estimate Amount Rs 2.0Lakhs 746 63Mm Pvc Pipe 4 Ksc 747 63Mm Pvc Elbow 748 63Mm Pvc Mta 749 50Mm Gi Pipe 750 50Mm Gi Coupling 751 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 752 A ) For Water Line 753 B ) For Fhtc Line 754 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 755 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 756 Fhtc Arrangements 757 63Mm Pvc Saddle Piece 758 20 Mm Gi Pipe 759 20Mm Gielbow 760 25Mm Pvc Pipe ( 6 Kg / Sqm ) 761 25Mm Pvc Elbow 762 20Mm X 15Mm Gi Reducer 763 20Mm Gm Ball Valve 764 20Mm Gicoupling 765 15Mm Brass Tap 766 20Mm Brass Ferrule 767 Flowcontrol Valve 768 Labour Charges For Cutting Charges For 20Mm Gi Pipe 769 Labour Charges For Threading Charges For 20Mm Gi Pipe 770 Labour For Cutting Open Road For Laying Water Mains Or Sewer 771 Provision For Vertical Rcc Post ( Pipe Stand ) 772 Provision For Rcc Platform ( 0.6Mx0.6M ) 773 Name Board Charges 774 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 775 26 .Providing Distribution Line With 25 Fhtc @ Anna Nagar H / O Pudhuchatramestimate Amount Rs.1.12Lakhs 776 63Mm Pvc Pipe 4 Ksc 777 63Mm Pvc Elbow 778 63Mm Pvc Mta 779 50Mm Gi Pipe 780 50Mm Gi Coupling 781 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 782 A ) For Water Line 783 B ) For Fhtc Line 784 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 785 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 786 Fhtc Arrangements 787 63Mm Pvc Saddle Piece 788 20 Mm Gi Pipe 789 20Mm Gielbow 790 25Mm Pvc Pipe ( 6 Kg / Sqm ) 791 25Mm Pvc Elbow 792 20Mm X 15Mm Gi Reducer 793 20Mm Gm Ball Valve 794 20Mm Gicoupling 795 15Mm Brass Tap 796 20Mm Brass Ferrule 797 Flowcontrol Valve 798 Labour Charges For Cutting Charges For 20Mm Gi Pipe 799 Labour Charges For Threading Charges For 20Mm Gi Pipe 800 Labour For Cutting Open Road For Laying Water Mains Or Sewer 801 Provision For Vertical Rcc Post ( Pipe Stand ) 802 Provision For Rcc Platform ( 0.6Mx0.6M ) 803 Name Board Charges 804 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Key Value

Document Fees
Refer document
EMD
INR 76000.0 /-
Tender Value
INR 75.10 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail