| 1 | Execution of work under following items |
| 2 | Provision for Removal of thick vegetational growth including removing and uprooting of babul trees, scrubes etc during the execution of work etc complete. |
| 3 | Provision for carefully removing the old damaged/cracked plaster and applying fresh plaster in 12 mm cement in 1: 4 ratio including cost and conveyance of labour charges etc. complete. |
| 4 | Taking out the removal of uneven/sunken old brick pathway without damaging and stacking the useful bricks for reuse including cost and conveyance of labour charges, etc. all complete. |
| 5 | Racking out the pointing from the temple platform from the brick joints, filling of cracks, applying new fresh pointing to the brick joints by using lime mortar LSS (1:1:1) mixed with adhesive including all materials, labour, transportation etc all complete |
| 6 | Towards Making,supplying &fixing in position chain link fencing of size 2.50x1.20m with 50x50x6m M.S.Angle frame and dis of wire not less than 3mm all around over the sconcrete blocks with chain link of 5mm square and 8 guage, fixing within the frame, including making necessary holes, providing bolts, nuts, fixing the post in concrete, primer coat etc. complete . |
| 7 | Towards applying exterior paints over the dwarf wall both side and its top with over a coat of primar coat including material and labour charges etc. complete. |
| 8 | Towards applying enamel paint of approved quality over the chain link fencing and gate over a primer coat after removing the older coat by scrapping including cost of material and labour charges etc. complete. |
| 9 | Towards applying white wash to main temple, dome of the temple of the temple of approved quality over a primer coat after removing the older coat by scrapping including c ost of material and labour charges etc complete. |
| 10 | Towards supply and stacking of good earth for base of carpet loan grass including cost of material, transportation and layering, watering etc .complete. |
| 11 | Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) |
| 12 | Supplying and stacking of dump manure at site from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) |
| 13 | Provision for laying Dhrangdhara stone flooring using 10cm thick dressed, cut stone block average size 0.75 x 0.6 x 0.10 laying and joint filling in LSS mortar 1:1:1 (1 lime, 1 sand, 1 surkhi) including cost of all materials and labour charges etc. all complete. |
| 14 | Rough dressing the trenched ground including breaking clods. |
| 15 | Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation. |
| 16 | Fine dressing of the ground. |
| 17 | Provision for constructing brick masonry walls (below chain link fencing) wherever collapsed / broken / weathered using the same size of bricks as per the existing and set in L.S.S. (1.1.1) mortar mixed with adhesives like gur, gugal, methi etc. and applying pointing with same mortar, proper curing, all materials, labour charges, transportation etc. all complete as directed. |
| 18 | Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). |
| 19 | Grassing with selection No. 1 Doob grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the grass and good earth shall be paid for separately). |
| 20 | Boring/drilling bore well of required dia for casing/strainer pipe, by suitable method prescribed in IS: 2800 (part 1), including collecting samples from different strata, reparing and submitting strata chart/ bore log, including hire & running charges of all equipment, tools, plants and machineries required for the job, all complete as per direction of Engineer-in-charge, upto 90 meter depth below ground level. [RMT] |
| 21 | Towards laying cement concrete bed for temple platform flooring using 1:3:6 ( 1 cement, 1 sand 3 stone aggregate) with proper mixing, laying, consolidation including all cost of materials and laour charges etc complete. |
| 22 | Towards removal of old door with chowkhat and supply, making and fixing of wooden panel door thickness 30mm using teak wood as per original including fixtures etc. complete. |
| 23 | Supplying, assembling, lowering and fixing in vertical position in bore well, un plasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge |
| 24 | The provision for purchase and installation of 5 HP submersible pump set along with electric cables and its complete accessories for new boring |
| 25 | Provision for supply of grass (Variety selection No.1)doob grass including carriage at site fresh & free fromweeds having proper roots in green including loading,unloading, carriage and all taxes paid etc. |
| 26 | Towards supply making and fixing of new chowkhat of size as instructed by sub circle incharge using teak wood as per original including fixtures etc. complete. |