Tender For 16 Nos In V.Pudhukottai Panchayat At Vedasandur Block Of Dindigul District Under Jjm - 2023-24, vedasandur-Tamil Nadu

Local Bodies has published Tender For 16 Nos In V.Pudhukottai Panchayat At Vedasandur Block Of Dindigul District Under Jjm - 2023-24. Submission Date for this Tender is 14-11-2023. Couplings Tenders in vedasandur Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40596812
Tender For 16 Nos In V.Pudhukottai Panchayat At Vedasandur Block Of Dindigul District Under Jjm - 2023-24
Open Tender
Indian
Tamil Nadu
Vedasandur
14-11-2023

Tender Details

Tender For 16 Nos In V.Pudhukottai Panchayat At Vedasandur Block Of Dindigul District Under Jjm - 2023-24; 1 Part 01 : Providing Pipe Line Arrangements And Fhtc-24Nos At V.Pudhukottai In V.Pudhukottai Panchayatestimate Amount : Rs. 1.56 Lakhs 2 Supply Of Following Materials Including All Cost Etc Complete 3 63Mm Pvc Pipe 4 Ksc 4 63Mm Pvc Elbow 5 63Mm Pvc Mta 6 50Mm Gi Pipe B Class 7 50Mm Gi Coupling 8 Solvent Cement 9 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 10 A ) For Water Line 11 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 12 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 13 Fhtc Arrangements 14 63Mm Pvc Saddle Piece 15 20Mm Pvc Pipe 10Ksc 16 15Mm Gi Pipe B Class 17 20Mm X 15Mm Gi Reducer 18 15Mm Gi Coupling 19 15Mm Brass Tap 20 15Mm Gi Elbow 21 15Mm Brass Ferrule 22 Flow Control Valve 23 Labour Charges For Cutting Charges For 15Mm Gi Pipe 24 Labour Charges For Threading Charges For 15Mm Gi Pipe 25 Provision For Vertical Rcc Post ( Pipe Stand ) 26 Provision For Rcc Platform ( 0.60Mx0.60M ) 27 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 28 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 29 Providing Name Board 30 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 31 Part 02 : Providing Pipe Line Arrangements And Fhtc-10Nos At Thoppupatty In V.Pudhukottai Panchayatestimate Amount : Rs. 0.68 Lakhs 32 Supply Of Following Materials Including All Cost Etc Complete 33 63Mm Pvc Pipe 4 Ksc 34 63Mm Pvc Elbow 35 63Mm Pvc Mta 36 50Mm Gi Pipe B Class 37 50Mm Gi Coupling 38 Solvent Cement 39 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 40 A ) For Water Line 41 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 42 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 43 Fhtc Arrangements 44 63Mm Pvc Saddle Piece 45 20Mm Pvc Pipe 10Ksc 46 15Mm Gi Pipe B Class 47 20Mm X 15Mm Gi Reducer 48 15Mm Gi Coupling 49 15Mm Brass Tap 50 15Mm Gi Elbow 51 15Mm Brass Ferrule 52 Flow Control Valve 53 Labour Charges For Cutting Charges For 15Mm Gi Pipe 54 Labour Charges For Threading Charges For 15Mm Gi Pipe 55 Provision For Vertical Rcc Post ( Pipe Stand ) 56 Provision For Rcc Platform ( 0.60Mx0.60M ) 57 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 58 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 59 Providing Name Board 60 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 61 Part 03 : Providing Pipe Line Arrangements And Fhtc-32Nos At Mudhaliyarpatty In V.Pudhukottai Panchayatestimate Amount : Rs. 2.00 Lakhs 62 Supply Of Following Materials Including All Cost Etc Complete 63 63Mm Pvc Pipe 4 Ksc 64 63Mm Pvc Elbow 65 63Mm Pvc Mta 66 50Mm Gi Pipe B Class 67 50Mm Gi Coupling 68 Solvent Cement 69 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 70 A ) For Water Line 71 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 72 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 73 Fhtc Arrangements 74 63Mm Pvc Saddle Piece 75 20Mm Pvc Pipe 10Ksc 76 15Mm Gi Pipe B Class 77 20Mm X 15Mm Gi Reducer 78 15Mm Gi Coupling 79 15Mm Brass Tap 80 15Mm Gi Elbow 81 15Mm Brass Ferrule 82 Flow Control Valve 83 Labour Charges For Cutting Charges For 15Mm Gi Pipe 84 Labour Charges For Threading Charges For 15Mm Gi Pipe 85 Provision For Vertical Rcc Post ( Pipe Stand ) 86 Provision For Rcc Platform ( 0.60Mx0.60M ) 87 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 88 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 89 Providing Name Board 90 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 91 Part 04 : Providing Pipe Line Arrangements And Fhtc-21Nos At Minukkampatty In V.Pudhukottai Panchayatestimate Amount : Rs. 1.56 Lakhs 92 Supply Of Following Materials Including All Cost Etc Complete 93 63Mm Pvc Pipe 4 Ksc 94 63Mm Pvc Elbow 95 63Mm Pvc Mta 96 50Mm Gi Pipe B Class 97 50Mm Gi Coupling 98 Solvent Cement 99 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 100 A ) For Water Line 101 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 102 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 103 Fhtc Arrangements 104 63Mm Pvc Saddle Piece 105 20Mm Pvc Pipe 10Ksc 106 15Mm Gi Pipe B Class 107 20Mm X 15Mm Gi Reducer 108 15Mm Gi Coupling 109 15Mm Brass Tap 110 15Mm Gi Elbow 111 15Mm Brass Ferrule 112 Flow Control Valve 113 Labour Charges For Cutting Charges For 15Mm Gi Pipe 114 Labour Charges For Threading Charges For 15Mm Gi Pipe 115 Provision For Vertical Rcc Post ( Pipe Stand ) 116 Provision For Rcc Platform ( 0.60Mx0.60M ) 117 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 118 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 119 Providing Name Board 120 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 121 Part 05 : Providing Pipe Line Arrangements And Fhtc-68Nos At Minukkampatty Ad Colony In V.Pudhukottai Panchayatestimate Amount : Rs. 4.87 Lakhs 122 Supply Of Following Materials Including All Cost Etc Complete 123 63Mm Pvc Pipe 4 Ksc 124 63Mm Pvc Elbow 125 63Mm Pvc Mta 126 50Mm Gi Pipe B Class 127 50Mm Gi Coupling 128 Solvent Cement 129 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 130 A ) For Water Line 131 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 132 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 133 Fhtc Arrangements 134 63Mm Pvc Saddle Piece 135 20Mm Pvc Pipe 10Ksc 136 15Mm Gi Pipe B Class 137 20Mm X 15Mm Gi Reducer 138 15Mm Gi Coupling 139 15Mm Brass Tap 140 15Mm Gi Elbow 141 15Mm Brass Ferrule 142 Flow Control Valve 143 Labour Charges For Cutting Charges For 15Mm Gi Pipe 144 Labour Charges For Threading Charges For 15Mm Gi Pipe 145 Provision For Vertical Rcc Post ( Pipe Stand ) 146 Provision For Rcc Platform ( 0.60Mx0.60M ) 147 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 148 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 149 Providing Name Board 150 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 151 Part 06 : Providing Pipe Line Arrangements And Fhtc-2Nos At Vellairavuthanur In V.Pudhukottai Panchayatestimate Amount : Rs. 0.15 Lakhs 152 Supply Of Following Materials Including All Cost Etc Complete 153 63Mm Pvc Pipe 4 Ksc 154 63Mm Pvc Elbow 155 63Mm Pvc Mta 156 50Mm Gi Pipe B Class 157 50Mm Gi Coupling 158 Solvent Cement 159 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 160 A ) For Water Line 161 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 162 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 163 Fhtc Arrangements 164 63Mm Pvc Saddle Piece 165 20Mm Pvc Pipe 10Ksc 166 15Mm Gi Pipe B Class 167 20Mm X 15Mm Gi Reducer 168 15Mm Gi Coupling 169 15Mm Brass Tap 170 15Mm Gi Elbow 171 15Mm Brass Ferrule 172 Flow Control Valve 173 Labour Charges For Cutting Charges For 15Mm Gi Pipe 174 Labour Charges For Threading Charges For 15Mm Gi Pipe 175 Provision For Vertical Rcc Post ( Pipe Stand ) 176 Provision For Rcc Platform ( 0.60Mx0.60M ) 177 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 178 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 179 Providing Name Board 180 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 181 Part 07 : Providing Pipe Line Arrangements And Fhtc-5Nos At Sikkupallampudhur In V.Pudhukottai Panchayatestimate Amount : Rs. 0.30 Lakhs 182 Supply Of Following Materials Including All Cost Etc Complete 183 63Mm Pvc Pipe 4 Ksc 184 63Mm Pvc Elbow 185 63Mm Pvc Mta 186 50Mm Gi Pipe B Class 187 50Mm Gi Coupling 188 Solvent Cement 189 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 190 A ) For Water Line 191 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 192 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 193 Fhtc Arrangements 194 63Mm Pvc Saddle Piece 195 20Mm Pvc Pipe 10Ksc 196 15Mm Gi Pipe B Class 197 20Mm X 15Mm Gi Reducer 198 15Mm Gi Coupling 199 15Mm Brass Tap 200 15Mm Gi Elbow 201 15Mm Brass Ferrule 202 Flow Control Valve 203 Labour Charges For Cutting Charges For 15Mm Gi Pipe 204 Labour Charges For Threading Charges For 15Mm Gi Pipe 205 Provision For Vertical Rcc Post ( Pipe Stand ) 206 Provision For Rcc Platform ( 0.60Mx0.60M ) 207 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 208 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 209 Providing Name Board 210 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 211 Part 08 : Providing Pipe Line Arrangements And Fhtc-5Nos At Kethampatty In V.Pudhukottai Panchayatestimate Amount : Rs. 0.30 Lakhs 212 Supply Of Following Materials Including All Cost Etc Complete 213 63Mm Pvc Pipe 4 Ksc 214 63Mm Pvc Elbow 215 63Mm Pvc Mta 216 50Mm Gi Pipe B Class 217 50Mm Gi Coupling 218 Solvent Cement 219 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 220 A ) For Water Line 221 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 222 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 223 Fhtc Arrangements 224 63Mm Pvc Saddle Piece 225 20Mm Pvc Pipe 10Ksc 226 15Mm Gi Pipe B Class 227 20Mm X 15Mm Gi Reducer 228 15Mm Gi Coupling 229 15Mm Brass Tap 230 15Mm Gi Elbow 231 15Mm Brass Ferrule 232 Flow Control Valve 233 Labour Charges For Cutting Charges For 15Mm Gi Pipe 234 Labour Charges For Threading Charges For 15Mm Gi Pipe 235 Provision For Vertical Rcc Post ( Pipe Stand ) 236 Provision For Rcc Platform ( 0.60Mx0.60M ) 237 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 238 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 239 Providing Name Board 240 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 241 Part 09 : Providing Pipe Line Arrangements And Fhtc-21Nos At Bommulugoundanpdhur In V.Pudhukottai Panchayatestimate Amount : Rs. 1.33 Lakhs 242 Supply Of Following Materials Including All Cost Etc Complete 243 63Mm Pvc Pipe 4 Ksc 244 63Mm Pvc Elbow 245 63Mm Pvc Mta 246 50Mm Gi Pipe B Class 247 50Mm Gi Coupling 248 Solvent Cement 249 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 250 A ) For Water Line 251 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 252 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 253 Fhtc Arrangements 254 63Mm Pvc Saddle Piece 255 20Mm Pvc Pipe 10Ksc 256 15Mm Gi Pipe B Class 257 20Mm X 15Mm Gi Reducer 258 15Mm Gi Coupling 259 15Mm Brass Tap 260 15Mm Gi Elbow 261 15Mm Brass Ferrule 262 Flow Control Valve 263 Labour Charges For Cutting Charges For 15Mm Gi Pipe 264 Labour Charges For Threading Charges For 15Mm Gi Pipe 265 Provision For Vertical Rcc Post ( Pipe Stand ) 266 Provision For Rcc Platform ( 0.60Mx0.60M ) 267 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 268 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 269 Providing Name Board 270 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 271 Part 10 : Providing Pipe Line Arrangements And Fhtc-13Nos At V.Pudhukottai Ad Colony In V.Pudhukottai Panchayatestimate Amount : Rs. 0.88 Lakhs 272 Supply Of Following Materials Including All Cost Etc Complete 273 63Mm Pvc Pipe 4 Ksc 274 63Mm Pvc Elbow 275 63Mm Pvc Mta 276 50Mm Gi Pipe B Class 277 50Mm Gi Coupling 278 Solvent Cement 279 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 280 A ) For Water Line 281 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 282 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 283 Fhtc Arrangements 284 63Mm Pvc Saddle Piece 285 20Mm Pvc Pipe 10Ksc 286 15Mm Gi Pipe B Class 287 20Mm X 15Mm Gi Reducer 288 15Mm Gi Coupling 289 15Mm Brass Tap 290 15Mm Gi Elbow 291 15Mm Brass Ferrule 292 Flow Control Valve 293 Labour Charges For Cutting Charges For 15Mm Gi Pipe 294 Labour Charges For Threading Charges For 15Mm Gi Pipe 295 Provision For Vertical Rcc Post ( Pipe Stand ) 296 Provision For Rcc Platform ( 0.60Mx0.60M ) 297 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 298 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 299 Providing Name Board 300 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 301 Part 11 : Providing Pipe Line Arrangements And Fhtc-22Nos At Bommulugoundanur In V.Pudhukottai Panchayatestimate Amount : Rs. 1.53 Lakhs 302 Supply Of Following Materials Including All Cost Etc Complete 303 63Mm Pvc Pipe 4 Ksc 304 63Mm Pvc Elbow 305 63Mm Pvc Mta 306 50Mm Gi Pipe B Class 307 50Mm Gi Coupling 308 Solvent Cement 309 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 310 A ) For Water Line 311 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 312 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 313 Fhtc Arrangements 314 63Mm Pvc Saddle Piece 315 20Mm Pvc Pipe 10Ksc 316 15Mm Gi Pipe B Class 317 20Mm X 15Mm Gi Reducer 318 15Mm Gi Coupling 319 15Mm Brass Tap 320 15Mm Gi Elbow 321 15Mm Brass Ferrule 322 Flow Control Valve 323 Labour Charges For Cutting Charges For 15Mm Gi Pipe 324 Labour Charges For Threading Charges For 15Mm Gi Pipe 325 Provision For Vertical Rcc Post ( Pipe Stand ) 326 Provision For Rcc Platform ( 0.60Mx0.60M ) 327 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 328 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 329 Providing Name Board 330 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 331 Part 12 : Providing Pipe Line Arrangements And Fhtc-10Nos At Kottaimedu Ad Colony In V.Pudhukottai Panchayatestimate Amount : Rs. 0.73 Lakhs 332 Supply Of Following Materials Including All Cost Etc Complete 333 63Mm Pvc Pipe 4 Ksc 334 63Mm Pvc Elbow 335 63Mm Pvc Mta 336 50Mm Gi Pipe B Class 337 50Mm Gi Coupling 338 Solvent Cement 339 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 340 A ) For Water Line 341 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 342 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 343 Fhtc Arrangements 344 63Mm Pvc Saddle Piece 345 20Mm Pvc Pipe 10Ksc 346 15Mm Gi Pipe B Class 347 20Mm X 15Mm Gi Reducer 348 15Mm Gi Coupling 349 15Mm Brass Tap 350 15Mm Gi Elbow 351 15Mm Brass Ferrule 352 Flow Control Valve 353 Labour Charges For Cutting Charges For 15Mm Gi Pipe 354 Labour Charges For Threading Charges For 15Mm Gi Pipe 355 Provision For Vertical Rcc Post ( Pipe Stand ) 356 Provision For Rcc Platform ( 0.60Mx0.60M ) 357 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 358 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 359 Providing Name Board 360 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 361 Part 13 : Providing Pipe Line Arrangements And Fhtc-7Nos At Venkatramanpudhur In V.Pudhukottai Panchayatestimate Amount : Rs. 0.51 Lakhs 362 Supply Of Following Materials Including All Cost Etc Complete 363 63Mm Pvc Pipe 4 Ksc 364 63Mm Pvc Elbow 365 63Mm Pvc Mta 366 50Mm Gi Pipe B Class 367 50Mm Gi Coupling 368 Solvent Cement 369 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 370 A ) For Water Line 371 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 372 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 373 Fhtc Arrangements 374 63Mm Pvc Saddle Piece 375 20Mm Pvc Pipe 10Ksc 376 15Mm Gi Pipe B Class 377 20Mm X 15Mm Gi Reducer 378 15Mm Gi Coupling 379 15Mm Brass Tap 380 15Mm Gi Elbow 381 15Mm Brass Ferrule 382 Flow Control Valve 383 Labour Charges For Cutting Charges For 15Mm Gi Pipe 384 Labour Charges For Threading Charges For 15Mm Gi Pipe 385 Provision For Vertical Rcc Post ( Pipe Stand ) 386 Provision For Rcc Platform ( 0.60Mx0.60M ) 387 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 388 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 389 Providing Name Board 390 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 391 Part 14 : Providing Pipe Line Arrangements And Fhtc-4Nos At Mahalaksmipuram In V.Pudhukottai Panchayatestimate Amount : Rs. 0.25 Lakhs 392 Supply Of Following Materials Including All Cost Etc Complete 393 63Mm Pvc Pipe 4 Ksc 394 63Mm Pvc Elbow 395 63Mm Pvc Mta 396 50Mm Gi Pipe B Class 397 50Mm Gi Coupling 398 Solvent Cement 399 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 400 A ) For Water Line 401 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 402 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 403 Fhtc Arrangements 404 63Mm Pvc Saddle Piece 405 20Mm Pvc Pipe 10Ksc 406 15Mm Gi Pipe B Class 407 20Mm X 15Mm Gi Reducer 408 15Mm Gi Coupling 409 15Mm Brass Tap 410 15Mm Gi Elbow 411 15Mm Brass Ferrule 412 Flow Control Valve 413 Labour Charges For Cutting Charges For 15Mm Gi Pipe 414 Labour Charges For Threading Charges For 15Mm Gi Pipe 415 Provision For Vertical Rcc Post ( Pipe Stand ) 416 Provision For Rcc Platform ( 0.60Mx0.60M ) 417 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 418 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 419 Providing Name Board 420 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 421 Part 15 : Providing Pipe Line Arrangements And Fhtc-19Nos At Kottaimedupudhur Ad Colony In V.Pudhukottai Panchayatestimate Amount : Rs. 1.32 Lakhs 422 Supply Of Following Materials Including All Cost Etc Complete 423 63Mm Pvc Pipe 4 Ksc 424 63Mm Pvc Elbow 425 63Mm Pvc Mta 426 50Mm Gi Pipe B Class 427 50Mm Gi Coupling 428 Solvent Cement 429 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 430 A ) For Water Line 431 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 432 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 433 Fhtc Arrangements 434 63Mm Pvc Saddle Piece 435 20Mm Pvc Pipe 10Ksc 436 15Mm Gi Pipe B Class 437 20Mm X 15Mm Gi Reducer 438 15Mm Gi Coupling 439 15Mm Brass Tap 440 15Mm Gi Elbow 441 15Mm Brass Ferrule 442 Flow Control Valve 443 Labour Charges For Cutting Charges For 15Mm Gi Pipe 444 Labour Charges For Threading Charges For 15Mm Gi Pipe 445 Provision For Vertical Rcc Post ( Pipe Stand ) 446 Provision For Rcc Platform ( 0.60Mx0.60M ) 447 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 448 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 449 Providing Name Board 450 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd ) 451 Part 16 : Providing Pipe Line Arrangements And Fhtc-8Nos At V.Ellapatty In V.Pudhukottai Panchayatestimate Amount : Rs. 0.58 Lakhs 452 Supply Of Following Materials Including All Cost Etc Complete 453 63Mm Pvc Pipe 4 Ksc 454 63Mm Pvc Elbow 455 63Mm Pvc Mta 456 50Mm Gi Pipe B Class 457 50Mm Gi Coupling 458 Solvent Cement 459 Earth Work Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying , Jointing And Refilling The Trench With Excavation Soils 460 A ) For Water Line 461 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 462 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 463 Fhtc Arrangements 464 63Mm Pvc Saddle Piece 465 20Mm Pvc Pipe 10Ksc 466 15Mm Gi Pipe B Class 467 20Mm X 15Mm Gi Reducer 468 15Mm Gi Coupling 469 15Mm Brass Tap 470 15Mm Gi Elbow 471 15Mm Brass Ferrule 472 Flow Control Valve 473 Labour Charges For Cutting Charges For 15Mm Gi Pipe 474 Labour Charges For Threading Charges For 15Mm Gi Pipe 475 Provision For Vertical Rcc Post ( Pipe Stand ) 476 Provision For Rcc Platform ( 0.60Mx0.60M ) 477 Labour Charges For Laying Of Pvc Pipe And Specials Fixing Charges Etc., Complete. 20Mm 478 Labour Charges For Laying Of Gi Pipe And Specials Fixing Charges Etc., Complete. 15Mm 479 Providing Name Board 480 Gst Amount For Providing Service To Government Contract Works For The Above Construction & Maintenance Works. { Gst Amount Is The Total Gst Amount For Overall Quoted Amount ( Both Construction And Maintenance ) Above This Row In Column Bb For All Works In This Package } ( Refer Clause 13.2 & 13.3 Of Section 2 Of Instruction To Bidders ( Itb ) Of Sbd )

Key Value

Document Fees
Refer document
EMD
INR 19000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail