}

Tender For Provide 6 Fhtc To Rural Household At Kallimanthayam House Of Kallimanthayam., Dindigul-Tamil Nadu

Local Bodies has published Tender For Provide 6 Fhtc To Rural Household At Kallimanthayam House Of Kallimanthayam.. Submission Date for this Tender is 15-11-2023. Water Pipe Line Tenders in Dindigul Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

40446812
Corrigendum : Tender For Provide 6 Fhtc To Rural Household At Kallimanthayam House Of Kallimanthayam.
Open Tender
Indian
Tamil Nadu
Dindigul
15-11-2023

Tender Details

Tender For Provide 6 Fhtc To Rural Household At Kallimanthayam House Of Kallimanthayam.; 2 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 3 63Mm Pvc Pipe 4 Kg / Sq.Cm 4 63Mm Pvc Coupler 5 63Mm Pvc Elbow 6 63Mm Pvc End Cap 7 63Mm Pvc Gatevalve 8 63Mmx20mm Pvc Saddle 9 20Mm Dia Pvc Fta 10 20Mm Dia Pvc Elbow 11 15Mm Gm Ferrule 12 15Mm Gi Elbow 13 15Mm Gi Pipe 14 15Mm Gi Coupling 15 15Mmflow Valve 16 15Mm Waste Not Tap 17 15Mm Gi Pipe Nipple ( 0.30M Long ) 18 15Mm Gi Pipe Nipple ( 0.90M Long ) 19 Standing Rcc Post & Rcc Platform 20 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 21 63Mm Pvc Pipe 4 Kg / Sq.Cm 22 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 23 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 24 2.Provide 18 Fhtc To Rural Household At Paraipatty H / O Kallimanthayamestimate Amount Rs.1.53 Lakhs 25 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 26 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 27 63Mm Pvc Pipe 4 Kg / Sq.Cm 28 63Mm Pvc Coupler 29 63Mm Pvc Elbow 30 63Mm Pvc End Cap 31 63Mm Pvc Gatevalve 32 63Mmx20mm Pvc Saddle 33 20Mm Dia Pvc Fta 34 20Mm Dia Pvc Elbow 35 15Mm Gm Ferrule 36 15Mm Gi Elbow 37 15Mm Gi Pipe 38 15Mm Gi Coupling 39 15Mmflow Valve 40 15Mm Waste Not Tap 41 15Mm Gi Pipe Nipple ( 0.30M Long ) 42 15Mm Gi Pipe Nipple ( 0.90M Long ) 43 Standing Rcc Post & Rcc Platform 44 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 45 63Mm Pvc Pipe 4 Kg / Sq.Cm 46 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 47 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 48 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 49 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 50 3.Provide 13 Fhtc To Rural Household At Malayandigoundanvalasu H / O Kallimanthayamestimate Amount Rs.1.10 Lakhs 51 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 52 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 53 63Mm Pvc Pipe 4 Kg / Sq.Cm 54 63Mm Pvc Coupler 55 63Mm Pvc Elbow 56 63Mm Pvc End Cap 57 63Mm Pvc Gatevalve 58 63Mmx20mm Pvc Saddle 59 20Mm Dia Pvc Fta 60 20Mm Dia Pvc Elbow 61 15Mm Gm Ferrule 62 15Mm Gi Elbow 63 15Mm Gi Pipe 64 15Mm Gi Coupling 65 15Mmflow Valve 66 15Mm Waste Not Tap 67 15Mm Gi Pipe Nipple ( 0.30M Long ) 68 15Mm Gi Pipe Nipple ( 0.90M Long ) 69 Standing Rcc Post & Rcc Platform 70 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 71 63Mm Pvc Pipe 4 Kg / Sq.Cm 72 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 73 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 74 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 75 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 76 4.Provide 7 Fhtc To Rural Household At Kumarapalayam H / O Kallimanthayamestimate Amount Rs.0.59 Lakhs 77 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 78 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 79 63Mm Pvc Pipe 4 Kg / Sq.Cm 80 63Mm Pvc Coupler 81 63Mm Pvc Elbow 82 63Mm Pvc End Cap 83 63Mm Pvc Gatevalve 84 63Mmx20mm Pvc Saddle 85 20Mm Dia Pvc Fta 86 20Mm Dia Pvc Elbow 87 15Mm Gm Ferrule 88 15Mm Gi Elbow 89 15Mm Gi Pipe 90 15Mm Gi Coupling 91 15Mmflow Valve 92 15Mm Waste Not Tap 93 15Mm Gi Pipe Nipple ( 0.30M Long ) 94 15Mm Gi Pipe Nipple ( 0.90M Long ) 95 Standing Rcc Post & Rcc Platform 96 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 97 63Mm Pvc Pipe 4 Kg / Sq.Cm 98 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 99 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 100 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 101 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 102 5.Provide 30 Fhtc To Rural Household At Neelagoundenpatty H / O Kallimanthayamestimate Amount Rs.2.55 Lakhs 103 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 104 63Mm Pvc Pipe 4 Kg / Sq.Cm 105 63Mm Pvc Coupler 106 63Mm Pvc Elbow 107 63Mm Pvc End Cap 108 63Mm Pvc Gatevalve 109 63Mmx20mm Pvc Saddle 110 20Mm Dia Pvc Fta 111 20Mm Dia Pvc Elbow 112 15Mm Gm Ferrule 113 15Mm Gi Elbow 114 15Mm Gi Pipe 115 15Mm Gi Coupling 116 15Mmflow Valve 117 15Mm Waste Not Tap 118 15Mm Gi Pipe Nipple ( 0.30M Long ) 119 15Mm Gi Pipe Nipple ( 0.90M Long ) 120 Standing Rcc Post & Rcc Platform 121 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 122 63Mm Pvc Pipe 4 Kg / Sq.Cm 123 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 124 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 125 6.Provide 42 Fhtc To Rural Household At Thumbichipalayam H / O Kallimanthayamestimate Amount Rs.3.57 Lakhs 126 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 127 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 128 63Mm Pvc Pipe 4 Kg / Sq.Cm 129 63Mm Pvc Coupler 130 63Mm Pvc Elbow 131 63Mm Pvc End Cap 132 63Mm Pvc Gatevalve 133 63Mmx20mm Pvc Saddle 134 20Mm Dia Pvc Fta 135 20Mm Dia Pvc Elbow 136 15Mm Gm Ferrule 137 15Mm Gi Elbow 138 15Mm Gi Pipe 139 15Mm Gi Coupling 140 15Mmflow Valve 141 15Mm Waste Not Tap 142 15Mm Gi Pipe Nipple ( 0.30M Long ) 143 15Mm Gi Pipe Nipple ( 0.90M Long ) 144 Standing Rcc Post & Rcc Platform 145 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 146 63Mm Pvc Pipe 4 Kg / Sq.Cm 147 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 148 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 149 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 150 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 151 7.Provide 7 Fhtc To Rural Household At Rengapalayam H / O Kallimanthayamestimate Amount Rs.0.59 Lakhs 152 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 153 63Mm Pvc Pipe 4 Kg / Sq.Cm 154 63Mm Pvc Coupler 155 63Mm Pvc Elbow 156 63Mm Pvc End Cap 157 63Mm Pvc Gatevalve 158 63Mmx20mm Pvc Saddle 159 20Mm Dia Pvc Fta 160 20Mm Dia Pvc Elbow 161 15Mm Gm Ferrule 162 15Mm Gi Elbow 163 15Mm Gi Pipe 164 15Mm Gi Coupling 165 15Mmflow Valve 166 15Mm Waste Not Tap 167 15Mm Gi Pipe Nipple ( 0.30M Long ) 168 15Mm Gi Pipe Nipple ( 0.90M Long ) 169 Standing Rcc Post & Rcc Platform 170 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 171 63Mm Pvc Pipe 4 Kg / Sq.Cm 172 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 173 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 174 8.Implementation Of Jal Jeevan Mission To Provide 10 Fhtc To Riral Household At Velayuthapalayam H / O Kallimanthayamestimate Amount Rs.0.85 Lakhs 175 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 176 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 177 63Mm Pvc Pipe 4 Kg / Sq.Cm 178 63Mm Pvc Coupler 179 63Mm Pvc Elbow 180 63Mm Pvc End Cap 181 63Mm Pvc Gatevalve 182 63Mmx20mm Pvc Saddle 183 20Mm Dia Pvc Fta 184 20Mm Dia Pvc Elbow 185 15Mm Gm Ferrule 186 15Mm Gi Elbow 187 15Mm Gi Pipe 188 15Mm Gi Coupling 189 15Mmflow Valve 190 15Mm Waste Not Tap 191 15Mm Gi Pipe Nipple ( 0.30M Long ) 192 15Mm Gi Pipe Nipple ( 0.90M Long ) 193 Standing Rcc Post & Rcc Platform 194 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 195 63Mm Pvc Pipe 4 Kg / Sq.Cm 196 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 197 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 198 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 199 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 200 9.Implementation Of Jal Jeevan Mission To Provide 10 Fhtc To Riral Household At Esakkampatty H / O Kallimanthayamestimate Amount Rs.0.85 Lakhs 201 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 202 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 203 63Mm Pvc Pipe 4 Kg / Sq.Cm 204 63Mm Pvc Coupler 205 63Mm Pvc Elbow 206 63Mm Pvc End Cap 207 63Mm Pvc Gatevalve 208 63Mmx20mm Pvc Saddle 209 20Mm Dia Pvc Fta 210 20Mm Dia Pvc Elbow 211 15Mm Gm Ferrule 212 15Mm Gi Elbow 213 15Mm Gi Pipe 214 15Mm Gi Coupling 215 15Mmflow Valve 216 15Mm Waste Not Tap 217 15Mm Gi Pipe Nipple ( 0.30M Long ) 218 15Mm Gi Pipe Nipple ( 0.90M Long ) 219 Standing Rcc Post & Rcc Platform 220 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 221 63Mm Pvc Pipe 4 Kg / Sq.Cm 222 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 223 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 224 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 225 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 226 10.Provide 10 Fhtc To Rural Household At Vangarachinnampatty H / O Kallimanthayamestimate Amount Rs.0.85 Lakhs 227 Dismantling And Removing The Damage P.C.C Concrete Portion Including All Labour Charges And All Other Incidental Charges Etc., Complete. 228 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 229 63Mm Pvc Pipe 4 Kg / Sq.Cm 230 63Mm Pvc Coupler 231 63Mm Pvc Elbow 232 63Mm Pvc End Cap 233 63Mm Pvc Gatevalve 234 63Mmx20mm Pvc Saddle 235 20Mm Dia Pvc Fta 236 20Mm Dia Pvc Elbow 237 15Mm Gm Ferrule 238 15Mm Gi Elbow 239 15Mm Gi Pipe 240 15Mm Gi Coupling 241 15Mmflow Valve 242 15Mm Waste Not Tap 243 15Mm Gi Pipe Nipple ( 0.30M Long ) 244 15Mm Gi Pipe Nipple ( 0.90M Long ) 245 Standing Rcc Post & Rcc Platform 246 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 247 63Mm Pvc Pipe 4 Kg / Sq.Cm 248 Cement Concrete Mix 1:4:8 Using 40Mm Iss Size Hbg Including Cost And Conveyance Of All Materials To Site Including Cost Of Cement And Labour For Mixing , Laying, Watering And Curing And Compacting Concrete And Labour For Formwork And All Other Incidental Charges Such As Baling Out Water Providing Protective Bunds Coffer Dams Etc., Complete For Foundation Concrete. 249 Cement Concrete 1:2:4 Mix Using 20Mm Iss Hbg Metal Including Cost And Conveyance Of All Matials To Site And All Labour Charges Etc., Complete. 250 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 251 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package } 252 11.Provide 15 Fhtc To Rural Household At Vallichinnacanaickan Pudurh / O Kallimanthayamestimate Amount Rs.1.27 Lakhs 253 Supply And Delivary Of The Following Sizes Of Pvc / Gi Pipeswith Confirming To Is And Other Specifications At Site Of Work Including All Taxes, Loading, Unloading, Freight, Stacking, Transit And Insurance Etc., Complete As Directed By The Dept.Officers. 254 63Mm Pvc Pipe 4 Kg / Sq.Cm 255 63Mm Pvc Coupler 256 63Mm Pvc Elbow 257 63Mm Pvc End Cap 258 63Mm Pvc Gatevalve 259 63Mmx20mm Pvc Saddle 260 20Mm Dia Pvc Fta 261 20Mm Dia Pvc Elbow 262 15Mm Gm Ferrule 263 15Mm Gi Elbow 264 15Mm Gi Pipe 265 15Mm Gi Coupling 266 15Mmflow Valve 267 15Mm Waste Not Tap 268 15Mm Gi Pipe Nipple ( 0.30M Long ) 269 15Mm Gi Pipe Nipple ( 0.90M Long ) 270 Standing Rcc Post & Rcc Platform 271 Earthwork Excavation Hard Stiff Clay And Hard Rock Earth And Pipe Laying Jointing And Refilling The Trench With Excavation Soils 272 63Mm Pvc Pipe 4 Kg / Sq.Cm 273 Towards The Cost Of Painting And Lettering Of Name Board With Scheme Details Including All Charges Etc., Complete 274 Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 07-11-2023 TENDER EXTENDED Date 15-11-2023

Key Value

Document Fees
Refer document
EMD
INR 15000.0 /-
Tender Value
INR 14.26 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail