Construction Of 10000 Litre Capacity Oht At Ward No. 15 Aladiyoor In Perungulam Town Panchayat. , Earth Work Excavating And Depositing On Bank With Initial Lead Of 10M & Initial Lift Of 2M In Hand Stiff Clay, Stiff Black Cotton, Hard Red Earth, Shales, Murram, Gravel, Stone Earth Mixed With Small Size Boulders Ss.20B Etc, Complete As Per Standard Specification. , Plain Cement Concrete 1:4:8 ( One Cement Four Sand And Eight Aggregate ) Using 40Mm Gauge Hard Broken Granite Jelly For Foundation Including Cost And Conveyance Of All Materials Including Labour Charge For Mixing Laying Curing, Watering If Found Necessary And Laid In Layers And Not More Than 30 Cm Thick Etc., As Per Standard Specification. , Reinforcementcement Concrete 1:1.5:3 Using 20Mm Iss Hard Broken Granite Jelly Including Cost And Conveyance Of All Materials Including Labour Charge For Mixing Laying Curing, Watering If Found Necessaryetc., Complete As Per Standard Specification. , For Items 1.50M To 4.50Mbelow G.L , For Items 0M To 1.50Mbelow G.L , For Items Above G.L And Upto4.50M , For Items Above0m To 4.51Mto 7.32 From G.L , For Items Above7.33M &Up To 10.98M From G.L , Supplying And Erecting Steel Centering For Sides And Sophist Of Including Necessary Supports And Shuttering To The Required Height For Rcc Items Using Ms Sheets Or Suitable Size Of Bg10 Stiffened With Welded Ms Angles Of Size 25Mm X 25Mm X 3Mm Of Boarding. Laid Over Silver Oak Joints Of Size 10Cm X 6.5Cm Spaced At 90Cm Center To Center And Supported By Casuarinas Props Of 10Cm To 13Cm Dia Spaced At75cm Centre To Centre Complying With Standard Specifications Etc., Completed. , Below G.L Items , 0 To 3.30M , 5.31 To 6.30 M , 0 To 3.30M , 5.31 To 6.30M , Square Column , 0 To 3.30M , 3.31 To 4.30 M , 4.31 To 5.30M , 5.31 To 6.30 , Supplying Fabricating And Placing In Position Of Rts Steel Rods For Reinforcement Including The Cost Of Steel And Binding Wire Etc., Complete And As Directed By Departmental Officers. , Painting Two Coats With Approved Exterior Emulsionpaint Over One Coat Of Priming Coat Over Cement Plastered Exposed Surface Of The Reservoir Including Cleaning, Preparing The Surface And Curing Preparing The Surface And Curing Etc., Complete. , Supply And Fixing Ofms Ladder To Outside Of Tank Including Cost And Conveyance And Fixing All Labour Charges Etc., Complete. , Providing And Fixing Of Rcc Inner Access Ladder With Rcc 1:1.5 :3 Using 20Mm Hbg Stone For Oht Including Casting Of Reinforcement, Placing Grill In Positional, Centering Shuttering Charges, Mixing Concrete Curing Etc., To Required Height , Supply And Fixing Ofmanhole Cover 60 X 60 Cm ( Heavy Duty ) With Frame Including Cost And Conveyance Of All Materials To Site Etc., Complete. , Earth Work Open Excavation And Depositing On Bank With In The Initial Lead Of 10M And A Lift Of 2M In Hard Stiff Clay, Stiff Block Cotton, Hard Red Earth, Shales, Murram, Gravel, Stoney Earth And Earth Mixed With Small Size Boulders Etc., As Per Ss 20 A. Tndss No: 23 & 24 Vi ( S2 ) Vi, Vii 9, 10With Standard Specifications. , Supply And Delivery Of Pvc & Gi Pipes And Specilas Including All Cost And Conveyance Charges.. Etc , Pumping Main Line 90Mm Dia Pvc Pipes 6 Kg / Cm2 , Delivery Line75mm Dia Pvc Pipes 4 Kg / Cm 2 , 25Mm Dia Ginalli , Brick Work In Cement Mortor 1:5 Mix ( One Cement, Five M.Sand ) Using New Best Countrybricks Of Size 8 ¾”X 4 ¼”X 2 ¾”From Approved Quarry Including Cost And Conveyance Of All Materials To Site. Loading And Unloading Charges And Labour Charges For Mixing, Laying And Curing Etc. Complete. Complying With Std. Specifications. , Plastering In Cement Mortor 1:5 Mix ( One Cement, Five M.Sand ) 12Mm Thick Including Cost And Conveyance Of All Materials To Site, Loading And Unloading Charges And Labour Charges For Mixing, Laying And Curing Etc. Complete. Complying With Std. Specifications. , Colour Washing Two Coats With Good Quality Of Colour Pigments Including Cost Of All Materials To Site And All Other Labour Charges For Mixing, Applying And Proper Curring Etc., Complete As Per Standard Specificationsfor 10Sqm , Refilling With Excavated Earth Including All Cost And Conveyance Charges.. Etc , Lowering The Pvc Pipes And Specials And Gradient , Alignment Including All Cost And All Labour Charges.. Etc