115 V Ac Ups System Lot 2 115 V Ac Ups System Lot 2 Numaligarh Refinery Limited , Rating Of 115V Ac Ups200kva, 1Ph , Ac Ups System ( Mcr 2 ) 115V, 100% Parallel Redundant Ups With Common Bypass. 115V, 50Hz, 200Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning. , Ac Ups System ( Cr03 ) , 115V, 100% Parallel Redundant Ups With Common Bypass. 115V, 50Hz, 200Kva, 1Ph, 0.8Pf, Ac Ups System Consisting Of 2X100% Parallel Redundant Configuration With Common Bypass, Including Condition Monitoring As Detailed In The Specification Tp-1Zzza-El-Spe-0017 & Cell Booster, As Per Typical Sld & As Per Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning. , Ac Ups System ( Ac Distribution Panel ) Mcr2, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning. , Ac Ups System ( Ac Distribution Panel ) Cr03, 115V Ac, Single Front, Non-Draw Out, Compartmentalized Db For Ac Ups Having Two Incomer And Outgoers As Per Feeder List & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning. , Battery Set For Ups System, Vented Ni-Cd Type Set Of Ni-Cd Type Battery Bank ( 2 X 100% ) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning And Commissioning. , Battery Set For Ups System, Vented Ni-Cd Type Set Of Ni-Cd Type Battery Bank ( 2 X 100% ) As Per The Duty Cycle Attached Part Of The Requisition Along With Battery Rack And Other Accessories As Per Sld & Requisition Documents And Shall Include Testing After Erection, Pre-Commissioning & Commissioning. , Miscellaneous Battery Isolation Breaker For Each Battery Bank - Flame Proof ( Ex-D ) Suitable For Installation In Gas Group Ii-C As Per Sld & Requisition Documents For All The Above Battery Banks Supplied In This Lot ( 4 Nos. ) , Copper Cables And Accessories Like Lug And Gland, Etc. For Interconnection Of Ups System And Its Acdb & Ups System And Its Battery - As Per Sld & Requisition Documents For All The Above Ups System Supplied In This Lot. Refer Note 16 Of Sos , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Ac Ups , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Ac Ups Battery Bank. Other Accessories ( Like Aprons And Gloves ) For Safe And Proper Commissioning, Operation And Maintenance Of The Battery Bank. , Special Tools And Tackles As Per Manufacturer’S Recommendation For The Above 115V Acdb , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Ac Ups , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Ac Ups Battery Bank , Pre-Commissioning / Commissioning / Start-Up Spares As Per Manufacturer’S Recommendation For The Above 115V Acdb , External Training:Training To 2 Nos. Of Owner Personnel At Oem’S Factory For 1 Week For The Entire Package ( Including Condition Monitoring ) . , Training To 10 Nos. Of Owner Personnel At Nrep Site For 1 Week For The Entire Package ( Including Condition Monitoring ) . , Bidder Shall Provide Per Diem Rate For Supervision Services For Installation Of The Entire Package And For Commissioning / Support Engineer From Oem Shall Be Stationed At Nrep Site For The Duration Of 1 Month From The Date Of Commissioning & Handover For The Entire Package , Cost For Additional Warranty Period Of 24 Months After Commissioning Or 36 Months After Dispatch Whichever Is Earlier” Over And Above The Standard Warranty Period Refer Note-12