Tender For Height Raising Work At Ganga River Crossing In Distt. Ghazipur Of 132 Kv Ghazipur-Bhadaura Line Between Tower No. 18 To 21 Under Etd Ghazipur-2 24 Fiber ( Dwsm ) Opgw Fiber Optic Cable 3 Accessories For Tower 4 Number Plate 5 Danger Plate 6 Phase Plate ( Set Of Three With Red, Yellow , Blue ) 7 Pipe Type Earthing Materials Per Tower 8 Hardware For Conductor 9 Double Suspension Fitting For Deer 10 Double Tension Fittingfor Deer 11 Double Tension Fitting For Panther 12 Single Tension Fitting For Panther 13 Accessories For Conductor 14 Vibration Damper Suitable For Panther 15 Vibration Damper Suitable Forspl Deer 16 Mid Span Compression Joint For Spl Deer 17 Mid Span Compression Joint For Panther 18 Repair Sleeve For Spldeer 19 Repair Sleeve For Panther 20 Performed Armour Rod For Spl. Deer 21 Performed Armour Rod For Panther 22 Hardware & Accessories For 23 Supply & Installation Hardware Set For 24 Fibre Opgw 24 Joint Box ( 24 Fibre ) 25 160 Kn Composite Silicon Rubber Insulator String For 220 Kv Tension Fitting Of Anchor Tower. 26 120 Kn Composite Silicon Rubber Insulator String For 220 Kv Suspension Fitting Of Rc Tower. 27 120 Kn Composite Silicon Rubber Insulator String For 132 Kv Tension Fitting 28 70 Kn Composite Silicon Rubber Insulator String For 220 Kv Suspension Fitting 29 Part -B ( Work ) 30 Survey Including Preparation Of Schedule Of Materials, Marking Of Locations ( Route Length ) , Gps Survey Of Line With Co-Ordinates Of Each Tower ( The Length Of Line Shall Be Authenticated By Gps Survey ) 31 Check Survey And Peg Marking. 32 Soil Investigation ( All Kind Of Soil ) 33 Cost Of Excavation Of Foundation ( Normal And Pile ) Pits Including All Earth Work Backfilling Ramming And Leveling Etc. 34 Setting Stub Of 220 Kv River Crossing Tower Including All Foundation Work But Excluding The Cost Of Concreting And Excavation. 35 Setting Stub Including All Foundation Work But Excluding The Cost Of Concreting And Excavation Of Following Towers. 36 220 Kv Dc / De 37 Installation Of Steel Re-Inforcement Bars In Rcc Foundation Including Cost Of Steel Re-Inforcement Bars Cutting, Bending, Placing, Binding Etc. For Dc+5Tower. 38 Cost Of Concreting For Normal Open Cast Foundation For Dc+0 Including Cost Of Cement, Sand, Stone Aggregates Dewatering Vibratingforming Shoring And Shutring And Curing But Excluding Cost And Installation Of Re-Inforcement Steel Bars. 39 1:2:4 Concreting 40 Erection Of Superstructure Of 220 Kv Dc Towers And Anchor Tower And Their Extension Including Transporting Tower Part From 132 Kv S / S Zamania Store To Site And All Work Above Ground Level Excluding Hoisting Of Insulator But Including Fitting Of Danger Plate No. Plate , Phase Plate Fixing And Punching Of The Bolts. 41 Erection Of Superstructure Of 220 Kv Dc River Crossing Tower And Their Extension Including Transporting Tower Part From 132 Kv S / S Zamania Store To Site And All Work Above Ground Level Excluding Hoisting Of Insulator But Including Fitting Of Danger Plate No. Plate , Phase Plate Fixing And Punching Of The Bolts. 42 Tack Welding Of All The Bolt Upto 5 Meter With Application Of Zinc Rich Aluminium Paint. 43 Laying, Tensioning, Stringing, Clamping, Jointing Etc Of Acsr Panther Conductorincluding Hoisting Of Insulator Fitting Of All Accessories Hardware And Accessories Etc Of Conductor All Three Phases.The Work Also Includes Shifting Conductor From 132 Kv S / S Zamania Store To Working Site. 44 Laying, Tensioning, Stringing, Clamping, Jointing Etc Of All Six Phases Of Acsr Spl. Deer Conductor And One Opgw Cable Including Hoisting Of Insulator Fitting Of All Accessories Hardware And Accessories For Conductor And Opgw Cable Etc From Anchor To Anchor Span Using 220 Kv River Crossing Tower. The Work Also Includes Shifting Conductor From 132 Kv S / S Zamania Store To Working Site. 45 Laying Of One No. Opgw Including Stringing Of Opgw Shall Be Inclusive Of Installation Of Joint Boxes, Jointing, & Splicing Work And Other Associated Work. 46 Grounding Work Including Earthworkfor Pipe Type Earthing Of Tower Including Coke And Salt . 47 Preparation & Submission Of Document Regarding Ptcc Clearance & Navigational Clearance From Iwai And Other Associated Work & Follow Up Till Getting The Noc From Ptcc & Iwai Of Respective Department. 48 Preparation & Submission Of Document Regarding Electrical Safety And Other Associated Work & Follow Up Till Getting The Noc From Electrical Safety Department. Electrical Safety Inspection Fee Will Be Paid To The Contractor On Actual Basis After Providing Of Inpection Fee Slip. 49 Part C- Dismentalling Of Line 50 De-Stringing Of Conductor, De-Hosting Of Insulator, Rolling Of Dismantleconductor And All Associated Work Of All Three Conductor 51 Dismantling Of Opgw, Rolling Of Dismantled Opgw, And All Associated Work, 52 Dismantling Of Rc Tower, Anchor And Other Towers 53 Transportation Of Dismaintled Material Including Shifting Up To Loading Point Loading Into Vehicle Transportation Unloading And Propor Stacking At Nearest Departmental 132 Kv S / S Zamania Store Approx. Distance 30 Km. 54 Part- D Revetment Work. 55 Revetment Of Tower Foundation Of Proposed 01 No. Rx Tower And 02 No Acnhor Tower, 1 No. 220 Kvdc Tower Or As Per Site Requirementused In 132 Kv Ghazipur -Bhadaura Lineas Per Drawing And Specification Duly Approved From Se Etc-Ii Varanasi. The Job Includes The Following Works : 56 Excavation Of Earth With The Help Of Suitable T&P And Labour, Watering And Ramming Of Excavated Earth. 57 Concrete With Cement, Sand, Stone ( 40Mm Stone Ballast ) In Ratio 1:2:4 In Foundation And Under Floor Including The Cost Of All Material / Labour And T&P Etc. Required For Proper Completion Of Work Satisfactorily. 58 Ist Class Stone Block Masonry Work For The Construction Of Retaining Wall In 1:4 Ratio Cement And Sand Including The Cost Of All Material, Labour & T&P Etc. Required For Proper Completion Of Job Satisfactorily. 59 Concrete In Plinth With 20Mm Stone Ballast Coarse Sand And Cement Mortar In Ratio 4:2:1 Including The Cost Of All Material, Labour & T&P Etc. Required For Proper Completion Of Job Satisfactorily. 60 Earth Filling Under Floor And In Area Between Tower Foundation And Retaining Wall Including The Cost Of Soil To Be Obtained By The Contractor From Outside Including Watering, Ramming And Dressing Of Earth Etc. Complete Including The Cost Of Earth Rayalty, Taxes, Freight Etc And Cost Of All Material, Labour & T&P Etc. Required For Proper Completion Of Job Satisfactorily. 61 Cost Of Pipe For Weep Hole As Per Required 62 Installation Of Steel Reinforcement Bar In Pillar, Beam & In Rcc Foundation Of Cc Pad Wherever Required As Per Drawing Approved By Se, Etc-Ii Varanasi Including Cost Of Steel, Cutting Beding And Placing Etc.