Repair And Testing Of Damaged Single Phase Distribution Transformers , Loading/Unloading & Opening Of Transformer Cover,Draining Oil If Any, Detanking Core And Coil Assembly ,Assessment And Estimation For Repair And Replacement Of Parts, Cleaing Andwashing Of Dust/Rust And Dirt From All Other Parts Including Core Tanks And Cooling Tubes, Retankingafter Replacement Of Parts/Repairs As Required Filling Fresh/New Filtered Transformer Oiltaking Of Transformer For Test And Testing For All The Routine Test As In Case Of New Transformer As Per Relevant Iss & After Satisfactory Repairs & Testing, Marking & Providing Blue Paint Etc.Loading Of Transformers At The Contractors Works(Price Variable With Base Date 01.08.2023 ). , For Both Aluminium And Copper Wound Distribution Transformers , A) 5 Kva , B)10/16/25Kva , Hv Leg Coils With Insulation , Varnishing And Packing Of Coil Assembly Vaccum Impregnation/Oven Dried) (Price Variable With Base Date 01.08.2023) , Aluminium Wound Distribution Transformers , All(For Al Wound) , Copper Wound Distribution Transformers , All(For Cu Wound) , Lv Leg Coils With Insulation ,Varnishing And Packing Of Coil Assembly Vaccum Impregnation/Oven Dried) (Price Variable With Base Date 01.08.2023) , Aluminium Wound Distribution Transformers , All(For Al Wound) , Copper Wound Distribution Transformers , All(For Cu Wound) , Ht Bushing(11 Kv) As Per Relevent Iss , 5 Kva To 25 Kva (For Both Aluminimum & Coppper Wound Distribution Tranformer) , Lt Bushing (0.433 Kv) & Neutral Bushing As Per Relevent Iss , 5 Kva To 25 Kva (For Both Aluminimum & Coppper Wound Distribution Tranformer) , Bushing Rod And Other Metal Parts Including Nuts( Indicate Material And Size Of Bushing Rod) , I) For Hv Bushing , 5 Kva To 25 Kva (For Both Aluminimum & Coppper Wound Distribution Tranformer) , Ii) For Lv Bushing , 5 Kva To 25 Kva (For Both Aluminimum & Coppper Wound Distribution Tranformer) , Set Of Gaskets(Rubberised Cork/ Neoprine) Material & Size Is To Be Indicated , 5 Kva To 25 Kva (For Both Aluminimum & Coppper Wound Distribution Tranformer) , Glass For Oil Level Gauge , All(For Al And Cu Wound) , Oil Drain /Filter Valve(Material & Size Is To Be Indicated) , All(For Al And Cu Wound) , Fresh/ New Filtered Transformer Oil Of Standard Quality With Isi Mark ) (Price Variable With Base Date 01.08.2023) , For All Type Of Transformers , Lt Terminal Plate With Terminals If Required , All(For Al Wound) , Sundry Items Viz. Cover Bolts, Plug Cap Screw, Washers, Insulation Material, Pressure Release Valve Etc. Please Indicate List Of Item Included In Sundry Item Parts If Any,(Denting/ Welding Etc If Required) , All(For Al And Cu Wound) , Painting Of Transformer , Inside With One Coat With Primer & Two Coat Of Zinc Cromate Best Paint. , For Both Aluminimum & Coppper Wound Distribution Tranformer , A) 5 Kva , B) 10 Kva , C) 16/25 Kva , Out Side Of Transformer With Primer Andtwo Coats Of Grey Paint And Marking After De Rusting , For Both Aluminimum & Coppper Wound Distribution Tranformer , A) 5 Kva , B) 10 Kva , C) 16/25 Kva , Filteration Charges Of New Transformer Oil . (If Supplied By Nigam) , M&P Box Unit Complete With Mccb , For All Ratings Of Copper Wound Distribution Transformer , M&P Box Unit , For All Ratings Of Aluminium Wound Distribution Transformer , Internal Circuit Breaker(Icb) , Only For All Ratings Of Aluminium Wound Distribution Transformer , Fixing Charges Of Meter And Protection (M And P ) Box , For All Ratings Of Both Aluminimum & Coppper Wound Distribution Tranformer , Signal Light (For All Ratings Of Both Aluminimum & Coppper Wound Distribution Tranformer) , Fuse Wire On Ht Side (For All Ratings Of Both Aluminimum & Coppper Wound Distribution Tranformer) , Mounting Arrangements