Rate Contract For Chipping And Painting, Cleaning, Priming And Painting Of Outside Hull, Internal Tanks, Superstructure, Mechinary Compartment, Bilges, Decks And Pipes Of Vesselsunder Repairs- Surface Preparation And Painting At Various Locations 2 General Cleaning ( Removal Of Loose Dust By Wire Brushing / Mopping / Light Scrapping ) 3 Removal Of Marine Growth / Barnicals 4 Manual Cleaning ( Thorough Chipping / Hard Scraping, ) 5 Surface Roughness By Light Discing 6 Mechanical Cleaning To Bare Metal ( St2 / St3 ) 7 Chemical Cleaning 8 Fresh Water Cleaning / Hosing 9 High Pressure Water Jet Cleaning With ContractorS Equipment 10 High Pressure Water Jet Cleaning With HslS Equipment 11 Application Of One Coat Of Primer / Conventional Paint / Epoxy Paint / Oil Coat / Cement Wash ( Either By Brush Or By Airless Spray ) With ContractorS Equipment 12 Application Of One Coat Of Primer / Conventional Paint / Epoxy Paint / Oil Coat / Cement Wash ( Either By Brush Or By Airless Spray ) With HslS Equipment 13 Note: 1 ) Above Operations In Fuel Tanks 75% Extra Will Be Considered And Other Than Fuel Tanks 50% Extra Will Be Considered.2 ) Above Operations In Bilges 150% Extra Will Be Considered3 ) Above Operations For Various Foundations, Outfit Items, Deck Machinery, Engine Room Machinery 100% Extra Will Be Considered. 4 ) Above Operations For Stp / Sludge / Sewage / Soil Tank 100% Extra Shall Be Considered.5 ) Repetition Of Above Operations Due To Various Exigencies Shall Be Paid At Extra. I.E. 2Nd Time - 50%, 3Rd Time - 25%, So On.6 ) Washing / Cleaning For The Purpose Of Application Of Paint And Removal Of Rust, Grease, Oil, Burnt Marks Shall Not Be Paid At Extra. 14 Ballast Tanks / Cofferdam / Void Spaces / Fw Tanks / Sw Tanks / Fore & Aft Peak / Decantation / Center Keelson / Fuel Tanks / Chain Locker And Enclosed Spaces Where Spaces Are Measured In Cumtr / Ton Capacity 15 General Cleaning ( Removal Of Loose Dust By Wire Brushing / Mopping / Light Scrapping ) 16 Manual Cleaning ( Thorough Chipping / Hard Scraping ) 17 Mechanical Cleaning To Bare Metal ( St2 / St3 ) 18 Fresh Water Cleaning / Hosing / Mopping 19 Chemical Cleaning 20 Apply One Coat Of Paint / Oil / Epoxy Paint / Cement Wash. 21 Note: Repetition Of Above Operations Due To Various Exigencies Shall Be Paid At Extra. I.E. 2Nd Time - 50%, 3Rd Time - 25%, So On. 22 Stp / Sludge / Sewage / Soil Tank: Bail Out Sludge, Scrap, Clean, Chip Entire Tank, Wire Brush, Mopping Of Tank And To Apply Paint. [ Minimum Charges For 3 Cumtr Shall Be Paid ] 23 Repeated Cleaning Shall Be Paid As Per Tank Cleaning Rates As Per Serial No. 2.07 24 Disposal Of Oil / Water / Mud / Muck / Sludge 25 Pump Out Water With ContractorS Portable Pump. 26 Water Removal / Bailing Out Water 27 Oil / Muck / Mud / Sludge Removal 28 Letter / Number Painting 29 Letter Painting On Display Board / Name Board 30 Paint Of Draught Marks Fwrd, Aft, Midship And P&S Either Light Load Line Or Full Load Line. 31 Painting Of Plimsol Marks ( P&S ) / Imo Number 32 Painting Of ShipS Name, Port Of Registry On Bow & Stern In English & Hindi. 33 Painting Of Bow Thrust Emblem 34 Painting Of Funnel Marking. 35 Painting Of Pendent Numbers. 36 Inscription ( Marking New Inscription By Dot Punch ) Of Ship Names In English & Hindi Letters. 37 Helo Deck Marking With Florescent Paint With Two Coats Of Orange, Green, Red, White And Lemon Yellow 38 Painting Of White Boarder 4 To 9 Around The Ship / Line Cutting Between Boot Top And Top Side. 39 Port Holes 40 Port Hole Eye Brow: Cleaning & Painting Of Port Hole Eye Brow 41 Port Holes / Anodes / Windows / Propellers / Echo Sounder / Log: Apply And Removal Of Grease And Clean With Thinner. 42 Anchor Chain Cables And Anchor ( P&S ) 43 Anchor Chain Cable Of Link Dia Upto 25Mm 44 Cleaning, Wire Brushing Of Anchor Chain 45 Chipping, Wire Brushingand Cleaning Of Chain 46 Hose Down Ofchain And Anchor 47 High Pressure Water Jet Ofchain And Anchor 48 Application Of One Coat Of Paint For Chain 49 Chipping, Wire Brushing, Cleaning And Painting Of Anchor 50 Anchor Chain Cable Of Link Dia From 26 Mm To 50Mm 51 Cleaning, Wire Brushing Of Anchor Cable 52 Chipping, Wire Brushingand Cleaning Of Chain 53 Hose Down Ofchain And Anchor 54 High Pressure Water Jet Ofchain And Anchor 55 Application Of One Coat Of Paint For Chain 56 Chipping, Wire Brushing, Cleaning And Painting Of Anchor 57 Anchor Chain Cable Of Link Dia Above 50Mm 58 Cleaning, Wire Brushing Of Anchor Cable 59 Chipping, Wire Brushingand Cleaning Of Chain 60 Hose Down Ofchain And Anchor 61 High Pressure Water Jet Ofchain And Anchor 62 Application Of One Coat Of Paint For Chain 63 Chipping, Wire Brushing, Cleaning And Painting Of Anchor 64 Pipes ( Measurements Outer Dia ) 65 Chipping, Cleaning And Applying One Coat Of Paint 66 Upto 80 Mm 67 80 Mm To 200 Mm 68 201 Mm To 300 Mm 69 301Mm To 500Mm 70 501Mm To 1000Mm 71 Chemical Cleaning 72 Upto 80 Mm 73 80 Mm To 200 Mm 74 201 Mm To 300 Mm 75 301Mm To 500Mm 76 501Mm To 1000Mm 77 Application Of Addl. Coat Of Paint. 78 Upto 80 Mm 79 80 Mm To 200 Mm 80 201 Mm To 300 Mm 81 301Mm To 500Mm 82 501Mm To 1000Mm 83 Pipes Of Above 1000 Mm Dia Shall Be Considered As Per Item No.I. 84 Inter Connecting Pipe Between Forward Machinery And Pump Room In The Center Keelson: Choke Cleaning Of Pipes Insitu. 85 Up To 500 Mm Pipe 86 501 To 1000 Mm Pipe