Tender For Up Keeping And Maintenance Of Drains Along The Sides Of Roads / Shops And Miscellaneous Other Works For Two Years ; 1 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Meansin Foundation Trenches Or Drains ( Not Exceeding 1.5 M In Width ) , Including Dewatering And Shuttering, Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M. 2 Fabrication Of All Types Of Structural Steel Works By Straightening, Cutting & Welding Using All Types Of Steel Sections Plates, Flats Of Any Size And Weight As Per Approved Drawing Or As Instructed, Erecting In Positionto Line And Level By Welding / Bolting Embedding In Concrete Including Cost For 2 Coat Painting With Synthetic Enamel Over A Coat Of Priming With Synchromate Primer, Hire Charges For Tools And Plants, Cost Of Electrodes, Other Incidentals Etc. Complete All As Directed By The Engineer-In-Charge. 3 Using Departmental Steel 4 Using Steel Procured By The Contractor 5 Removingsiltfrom Marg 1 Side Drain And Avenue V Side Drain, Depositing On The Drain Side Bank Carefully Without Damaging Existing Structure / Lawn, Machinery, Uprooting Of All Vegetation From Side Walls / Floor Of Drains, Taking Out Mud & All Works, Disposal Of Silt / Debris Within A Distance Of 2 Km Inside Csl, Including All Labour For Loading, Unloading, Removal And Repositioning Of Steel / Rcc Cover Slabs, Transportingcharges, Hire For Tools, Etc. Complete All As Directed By The Engineer-In-Charge. 6 Cleaning Of Open Or Covered Drains Up To 30Cm Width And Depth Up To 50Cm Attached To Office / Residential, Removal Of Covers And Repositioning Of Covers After Cleaning, Taking Out Mud And Allwastes And Other Debris And Clearing Allwild Growths If Present On Side Berms ( Max. 50Cm ) Disposal Of Debris Within A Distance Of2 Km Using Truck / Auto Cart / Manual Labour Including All Incidental Charges, Hire For Truck / Auto Cart Etc. Complete All As Directed By The Engineer-In-Charge. 7 Cleaning Of Various Open Drains ( Width Above 30 Cms ) Along The Sides Of Roads After Uprooting Of All Kinds Of Vegitationsfrom Side Walls / Floor Of Drains, Taking Out Mud, All Wastes And Other Debris, Neat Sectioning And Clearing Of All Wild Growths On Side Berms ( Max. 50Cm ) Disposal Of Debris Within A Distance Of 2 Km Using Truck / Auto Cart / Manual Labour Including All Incidental Charges, Hire For Truck / Auto Cart Etc. Complete All As Directed By The Engineer-In-Charge. 8 Depth Upto 50Cm 9 Depth Above 50Cms But Upto 100Cm 10 Depth Above 100Cms 11 Cleaning Of Drains Covered With Rcc Covers Of Any Thickness ( Width Above 30 Cms ) Along The Sides Of Roads, Dock Premises, Removal Of Covers And Repositioning Of Covers After Cleaning, Taking Out Mud And Allwastes And Other Debris And Clearing Allwild Growths If Present On Side Berms ( Max. 50Cm ) Disposal Of Debris Within A Distance Of2km Using Truck / Auto Cart / Manual Labour Including All Incidental Charges, Hire For Truck / Auto Cart Etc. Complete All As Directed By The Engineer-In-Charge. 12 Depth Upto 50Cms 13 Depth Above 50Cms But Upto 100Cms 14 Depth Above 100Cms 15 Cleaning Of Drains Covered With Steel Covers / Grills Of Any Thickness / Size ( Width Above 30 Cms ) Along The Sides Of Roads, Dock Premises, Removal Of Covers And Repositioning Of Covers After Cleaning, Taking Out Mud And Allwastes And Other Debris And Clearing Allwild Growths If Present On Side Berms ( Max. 50Cm ) Disposal Of Debris Within A Distance Of 2 Km Using Truck / Auto Cart / Manual Labour Including All Incidental Charges, Hire For Truck / Auto Cart Etc. Complete All As Directed By The Engineer-In-Charge. 16 Depth Upto 50Cms 17 Depth Above 50Cms But Upto 100Cms 18 Depth Above 100 Cms 19 Cleaning Of Drains Of All Depths Near Docks / Quay Premises, Removal Of All Oily Matters, Mud, Scraps Of Steel, Cotton / Polythene / Plastic Materials And Any Other Debris Including Disposal Of The Debris Within A Distance Of 250 Metres Including All Incidental Charges Etc. Complete All As Directed By The Engineer-In-Charge. 20 Cleaning The Open / Covered Manholes / Catch Pits Of Any Size And Depth Removal And Replacement Of Rcc / Ms Covers If Available, Taking Out Mud, Cotton / Ploythene / Plastic Wastes And Other Debris, Including Mud And Debris Mixed With Sludge Oil Or Any Hazardous Material, Including Disposal Of Debris Within A Distance Of 2 Km Using Truck / Auto Cart / Mannual Labour, Also Including All Incidental Charges, Hire For Truck / Auto Cart Etc. Complete All As Directed By The Engineer-In-Charge. 21 Dismantling / Demolishing The Following Of Any Thickness And Clearing Away The Debris Within A Distance Of 2 Km Etc. Complete. 22 Demolishing Pcc / R.C.C. Work 23 Demolishing Rubble Masonry Work 24 Cement Concrete 1:4:8 Using 40Mmand Down Gradedhard Granite Broken Stones Including Cost And Conveyance Of All Materials, Labour For Mixing, Laying, Consolidating Curing Etc.Complete All Asdirected By The Engineer In Charge But Excluding Cost Of Cement 25 Providing And Laying Plain Cement Concrete 1:3:6 Using 20Mm Down Graded Metal Including Cost And Conveyance Of All Materials, Cost Of Formwork, Labour For Mixing, Laying, Consolidating, Curing Etc. Complete All Asdirected By The Engineer In Charge But Excluding Cost Of Cement 26 Providing And Laying Pcc / Rcc 1:2:4 Using 20Mm Down Graded Metal Including Cost And Conveyance Of All Materials, Cost Of Formwork, Labour For Mixing, Laying, Consolidating, Curing Etc But Excluding Cost Of Cement And Rienforcement Work. 27 Plastering With Cm 1:4, 15Mm Thick Floated Hard And Trowelled Smooth Etc. Complete ( The Rate Is Inclusive Of Picking The Cement Surface, If Any, Before Plastering ) The Rate Includes Cost And Conveyance Of All Materials, Labour Charges Etc. Complete, But Excluding Cost Of Cement. 28 Reinforcement Work For R.C.C. Bent, Tied And Placed In Position Including, Binding Wire, Labour For Strainghtening, Cutting, Bending, Binding Etc. Complete, But Excluding Cost Of Reinforcement. 29 Random Rubble Masonry In Cm1:6 ( Excluding Cost Of Random Rubble ) Including All Labour, Cost And Conveyance Of All Materials, But Excluding Cost Of Rubble And Cement, All As Directed By The Engineer In Charge. 30 Solid Blockmasonry In Cement Mortar 1:6, Including Cost And Conveyance Of All Materials, All Labour, All Other Incidentals Etc. Complete For All Levels, But Excluding Cost Of Cement All As Directed By The Engineer In Charge. 31 Providing And Engaging The Following Labours For Miscellaneous Works As Directed By The Engineer In Charge 32 Wood Cutter For Felling Trees Including Tools, Tackles, Ropes, Fuel, Consumables Etc. ( Per Day Of 8 Hrs ) 33 Wood Cutter For Felling Trees Including Tools, Tackles, Ropes, Fuel, Consumables Etc. ( Per Day Of 4 Hrs ) 34 Man Mazdoor For Miscellaneous Works 35 Supplying And Storing At Site Ordinary Portland Cement / Portland Pozzolana Cement Conforming To Relevant Is. 36 Supplying And Stacking At Site Tor Steel Reinforcement Bars ( Of Approved Make ) Of Different Diameters Conforming To Relevantis.