Under Business Plan 2023-24 Part-2, Work Of Replacement Of Dilapidated Wire Of Lt Line And Installation Of Pole In The Middle Of Long Span And Construction Of New Lt Line Under Power Distribution Division- Pukhrayan, Kanpur Dehat.- 1 Carriage Of Various Size Pcc Poles From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 2 Carriage Of Various Size St Poles From Store Center Or From Any Other Place To The Respective Site Of Work Distence Up To 75 Km Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 3 Carriage Of Line Material Viz. Weasel / Rabbit / Racoon / Dog Conductor, G.I. Earth Wire, Cross Arm, Angle, Channel, Cable Boxes, Static Meter Insulators, Clamps And Other Line Material From Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 4 Carriage Of 100 / 63 / 25 Kva T / Ffrom Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work 5 Carriage Of 250 / 400 Kva T / Ffrom Store Center Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Its Dragging Etc. And Also Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work 6 Erection And Grouting Of S.T.P Double Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 7 Erection And Grouting Of S.T.P Single Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 8 Erection And Grouting Of S.T.P Four Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 9 Erection And Grouting Of P.C.C Double Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 10 Erection And Grouting Of P.C.C Single Pole Including The Work Of Complete H.T. Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement. 11 Erection And Grouting Of Stay Set Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T & P Etc. Required For Proper Completion Of Work. 12 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Weasal / Racoon / Dog Conductor On The Newly Erected Pole / Old Poleas Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carries Etc. Required For Proper Completion Of Work. 13 Laying Of Abc Of Different Size ( 3X 50 Sqmm , 3 X 95 Sqmm And 3 X 120 Sqmm ) As Per Respo Manual. 14 Laying Of Different Size Xlpe Cable In The Trecnh / Gi Pipe / Hdpe Pipe And Redressing Of Trench After Laying Of Xlpe Cable For Proper Completion Of Work As Per Respo Manual 15 Construction Of T / F Plinth Suitable For 250 / 400 Kva T / F As Per Respo Norms . 16 Mounting Of 100 / 63 / 25 Kva T / F On The Double Pole / Plinth Structure And Connection Thereof As Per Respo Norms. 17 Mounting Of 250 / 400 Kva T / F On Theplinth Structure And Connection Thereof As Per Respo Norms. 18 Guarding Between Two Poles Like Single / Double / Tri / Four Poles Etc. To Guard Lt / 11 Kv / Telephone Line , Road / River Crossing Ect. With G.I. Wire 6 Swg And G.I. Wire 8 Swgincluding Fixing Of Guarding Channel With Clamp And Nut & Bolts Etc. As Per Relevent Drawing .All Required Material Will Be Provided By Firm . ( Guarding Angel , Guarding Clamp And G.I. Wire 8 / 10 Swg ) 19 Dismantling Of Existing 33Kv / 11 Kv / L.T. Line And Removal Of All Accessories & Fittings From Poles, Re-Rolling Of Conductor And Proper Stacking And Cartage Of Dismantled Conductor & Accessories From Site Of Work To Dvvnl, Store. 20 Supply & Erection Of Clamp With N&B All Size As Per Respo Norms . 21 Supply & Erection Of G.I. Pipe 6 Dia As Per Respo Norms . 24 Supply & Erection Of Clamp With N&B All Size As Per Respo Norms .