Tender For The Work For System Improvement / Strengthening Works In Municipal Area Under Uedd-Vi, Varanasi On Semi Turn-Key Basis In System Strengthening Scheme 2023-24- 1 The Work For Verious System Improvement / Strengthening Works In Municipal Area Under Uedd-Vi, Varanasi 2 Stay Clamp For St Pole With N&B 3 Lt. Clamp For Stp / Pcc With N&B 4 Lt Shackle Insulator 5 Loop / Stay Insulator 6 Ms X-Arm Clamp For Stp 9 / 11 Mtr 7 Eye Bolt 8 T / F Base Clamp With N&B 9 Cable Holding Clamp 10 Holding Clamp For Gi Pipe 11 Hdpe Pipe 110Mm 12 Gi Pipe 100Mm 13 M.S. Nut & Bolts Off Size 14 Dead End Clamp With Eye Hook 15 Suspension Clamp With Eye Hook 16 Clamp For Eye Hook With N&B 17 Lt Cable S / C 1X35 Sq Mm 18 Lt Distribution Box With Clamp And N&B 19 Lt Insulated Piercing Clamp For Enagiging D / B 20 Lt Bare Netural Connector ( P.G. Clamp ) 21 Allu Lug For 95 Sq.Mm 22 Allu. Lugs For 400 Sq Mm 23 Allu. Lugs For 630 Sq Mm 24 Allu. Lugs For 50 Sq Mm 25 Allu. Lugs For 1000 Sq Mm 26 Cost Of Copper Z Clamp For 250 Kva T / F With Nut Bolt & Washer 27 Cost Of Copper Z Clamp For 400 Kva T / F With Nut Bolt & Washer 28 Cost Of Copper Z Clamp For 630 Kva T / F With Nut Bolt & Washer 29 Supply And Errection Of Lt Mccb 800 Amp. 30 Supply And Errection Of Lt Mccb 400 Amp. 31 Supply And Errection Of Lt Mccb 250 Amp. 32 Supply And Errection Of Lt Mccb 100 Amp. 33 Supply And Errection Of Lt Distribution Paneel Type A-2 34 Supply And Errection Of Lt Feeder Piller 35 Supply And Errection Of Lt Service Piller 36 Replacement / Addition Of Lt Poles In Line 37 Carriage Of S.T. Pole 9 Mtr / Pcc Pole 8.5 Mtr Fromstore To Site With Loading & Unloading 38 Dismantling Of Old & Damaged Pole 9 / Pcc Pole 8.5 Meter Long After Dismentling Of Cond. & Accessories From Line And Its Proper Steking . 39 Erection Grouting & Plinthing Of New 9 / Pcc Pole 8.5Meter Long Including Fixing Of Accessories And Resagging & Stringing Of Old Conductor On Re-Errected Pole. 40 Fitting Of Earthing Rod 41 Carriage Of Damaged / Dismentilled Pole From Dumping Store To Raja Talab Store With Loading & Unloading 42 Grouting Of Stay, Nozelling & Fixing Of Stay Wire Etc. 43 Guarding Of Ht Lines 44 Labour Charge For Laying And Stringing Of Two Nos Gi Wire With Lacing And Binding 45 Fabrication And Fixing Of Fitting 46 Carriage Of Material From Store To Work Site Including Loading And Unloading. 47 A. Replacement / Addition Of Poles In H.T Line 33Kv Or 11Kv 48 Carriage Of S.T. Pole 11 Mtrfromstore To Site With Loading & Unloading 49 Dismantling Of Old & Damaged Pole 11 Meter Long After Dismentling Of Cond. & Accessories From Line And Its Proper Steking . 50 Erection Grouting & Plinthing Of New 11 Meter Long Including Fixing Of Accessories And Resagging & Stringing Of Old Conductor On Re-Errected Pole. 51 Fitting Of Earthing Rod 52 Carriage Of Damaged / Dismentilled Pole From Dumping Store To Raja Talab Store With Loading & Unloading 53 Grouting Of Stay, Nozelling & Fixing Of Stay Wire Etc. 54 Bifurcation Of 11 Kv Overloaded Feeders* 55 Loading Unloading & Carriage Ofconductor, Earth Rod, Stay Set, G.I. Wire, Angle, Channel Etcfrom Raja Talab Central Store To Site 56 Loading Unloading & Carriage Of Stp 11 Mtr Longfrom Raja Talab Central Store To Site 57 Loading Unloading & Carriage Of 11 Kv Cable, From Raja Talab Central Store To Site 58 Erection Grouting Of 11 Mtr D / P With Fitting Of All Accessories Including In Cost Of Grouting Material 59 Grouting & Nozzling Of Stay Including Cost Of Grouting Material. 60 Laying & Dressing Of U / G11 Kv 3X185 Sq Mm Xlpe Cabled / C After Digging Of Roadincluding In Cost Of Brick, Patiya & Sand And C.I. Pipe Required Of Road X-Ing As Per Norms 61 Laying & Dressing Of U / G11 Kv 3X185 Sq Mm Xlpe Cable Through Hdd Methode Required Of Road X-Ing As Per Norms 62 Laying, Testing & Commissioning Of 11 Kv 3X185sq Mm Xlpe Cable D / C ( 2X100mtr ) Inhdpe Pipe After Supply & Laying Of D / C Hdpe Pipe ( 2X50mtr ) Of 200 Mm Dai By Horrizontal Drilling Mathod With Drilling Machine The Pipe Shall Be Leid At The2.5 Mtr Deep Below Railway Track. Sp. Earthing Of D / P On Both Side As Per Norms .G.I.Pipe Of Size 4 Dia 3 Mtr Long, Suitable Clamp & Nut Bolts Fixing Of All Accessoriesandearthing Material Etc. 63 Documentation Charge For Railway X-Ing 64 Earthing Of Pole By Earthing Rod 65 Fitting Of Cable Marker With Cost Of Cable Marker 66 Jointing Of 11 Kv O / D H.S. J. Kit For 3X185 Sq Mm Xlpe Cable 67 Jointing Of 11 Kv S / T H.S. J. Kit For 3X185 Sq Mm Xlpe Cable 68 Hoisting Of 11 Kv 3X185 Sq Mm Cable On Double Pole Through G.I.Pipe Of Size 6 Dia, 3 Mtr Long Including Its Jumpring Complete 69 Painting Of Stp 11 Mtr & Fitting With 01 Coat Red Oxide & 02 Coat Allu. Paints After Prepartion Of Sulface Including Cost Of Material 70 Additional Lt Circuits* 71 Cartage Of Following Material From Raja Ka Talab Storeto Site Including Loading & Unloading 72 Cartage Of Abc Size ( 3X120+1X95+1X16 ) Sqmm And Other Material As Per Estimate 73 Cartage Of S T Pole 9 Meterlong From Storeto Site Including Loading & Unloading 74 Errection, Grouting & Plinthing Of Stp 9 Mtr Including Cost Of Grouting Material 75 Erection & Commissioning Of ( 3X120 ) And 3X95 Sq Mm Xlpe Abc With All Accessories Dead End Clamps, Suspension Clamps, Lt Cable S / C, Connector Such As Clamp For Pole And Eye Hook Etc 76 Grouting Of Stay It Nozelling Fixing Of Stay Wire Complete Including Cost Of Grauting Material 77 Fixing Of Dist. Boxes On Lt Pole Including All Clamps And Material For Mounting, Connection & Sealing 78 Connection Of Consumer Service Cable Hrough Distribution Boxes After Commissioning Of Abc Line. 79 Earthing Of Pole By Earth Rod 80 Painting Of Stp 11 Mtr & Fitting With One Coat Of Red-Oxide Post Man Colour & Two Coat Al. Paints Including Cost Of Materials 81 Increasing Capacity Of Distribution Transformers From 63 / 100 To 250 Kva 82 Loading Unloading & Carriage Of 250 Kva T / F From Raja Talab Central Store To Site 83 Loading Unloading & Carriage Of Other Material From Raja Talab Central Store To Site 84 Dismentaling Of Old 100 Kva T / F And Shuifting From Work Site To Store Including Loading And Unloadiung. 85 Errection & Mounting Of New 250 Kva T / F On Existing D / P And Making Connection And Jumpring By Laying Of Lt Cable 86 Sp. Earthing Of 250 Kva T / F Netural Or Body Sepertaly Chemical Pipe And Connection With G.I. Strip Off Size 30X5 Mm Including Cost Of Material 87 Increasing Capacity Of Distribution Transformers From 250 To 400 Kva 88 Loading Unloading & Carriage Of 400 Kva T / Fand Other Material From Raja Talab Central Store To Site 89 Dismentaling Of Old 250 Kva T / F And Shuifting From Work Site To Store Including Loading And Unloadiung. 90 Errection & Mounting Of New 400 Kva T / F On Existing D / P And Making Connection And Jumpring By Laying Of Lt Cable 91 Sp. Earthing Of 400 Kva T / F Netural Or Body Sepertaly Chemical Pipe And Connection With G.I. Strip Off Size 30X5 Mm Including Cost Of Material 92 Increasing Capacity Of Distribution Transformers From 400 / 630 To Add. 250Kva 93 Loading Unloading & Carriage Of 250 Kva T / F From Raja Talab Central Store To Site 94 Loading Unloading & Carriage Of 9 / 11 Mtr St Pole From Raja Talab Central Store To Site 95 Loading Unloading & Carriage Of Condusctor, Abc Size ( 3X120+1X95+1X16 ) Sq Mm , Ms Channel, Angle, Disc, Pin, Earthing & Decentralised Materials From Raja Talab Central Store To Site 96 Erection Of D.P Including Grouting And Plinthing Of Pole Fitting Fixing Of S / S Base Of M.S. Angle / Channel, Fixing Of All Accessories 97 Laying And Sagging Of Weasel For 11Kv Line 98 Errection & Mounting Of250 Kva T / F On D / P And Making Connection And Jumpring. 99 Erection & Commissioning Of ( 3X120+1X95+1X16 ) Sq Mm Xlpe Abc With All Accessories Dead End Clamps, Fixing Of Dist. Boxes Suspension Clamps, Such As Clamp For Pole And Eye Hook Etc. 100 Errection Of Earthing Rod 101 Fitting & Fixing Of Lt Bus Bar 102 Painting Of Stp 9 / 11 Mtr & Fitting With One Coat Of Red-Oxide Post Man Colour & Two Coat Al. Paints Including Cost Of Materials 103 Sp. Earthing Of 250 Kva T / F Netural & Body Sepertaly With Chemical Pipe And Connection With G.I. Strip Off Size 30X5 Mm Including Cost Of Material 104 Replacement Of Components In 33 / 11 Kv Ss 105 Loading Unloading & Carriage Of All Required Materials Includingct, Isolators, Crp, 33Kv Vcb & Decentralised Material Etc. Fromstore To Site 106 Erection, Connection, Fitting And Testing Of 33 Kv Isolator 107 Erection, Connection, Fitting And Testing Of 33 Kv Lightening Arresters 108 Erection, Connection, Fitting And Testing Of 33 Kv Ct 109 Erection, Connection, Fitting And Testing Of 33Kv Pt 110 Errection Of 24 Volt Battery And Charger Including All Connection 111 Earthing Of All Equipment With Earth Strip 112 Earthing Of Distributiontransfomers ( Chemical Earthing ) 113 Sp. Type Earthing Of Distribution Transformer For Neutral Or Body Of Diffrent Capacity By Providing Ans Fixing Of Chemical Pipe And Connectiom With The Help Of Gi Strip 30X5 Mm Duly Galvanized Shall Be Used. Every Dt Shall Have To Such Earthing One Earthing For T / F Body And Second For Neutral Both These Points Shall Be Connected To Earth Through Gi Strip ( 30X5 Mm ) Separately. All Required Materials Shall Be Supplied By The Contractor. 114 Requirement Of Mobile Distribution Transformer With Trolley* 115 Providing And Fixing Of Movable Trolly For 630 Kva Distribution Transformer Complete In All Respect 116 Loading Unloading & Carriage Of 630 Kva T / F From Raja Talab Central Store To Site 117 Errection & Mounting Of 630 Kva T / F On New Trolly And Making Connection And Jumpring By Laying Of Lt Cable 118 Strengthening Of L.T Line 119 Loading Unloading & Carriage Of All Materialfrom Raja Talab Central Store To Dump Store Anddump Store To Site 120 Fabrication Of Lt Bus Bar And Fixing On Existing Dp Then Bus Bar With Acsr Dog Conductor 121 Fabrication Of Areal Fuse Unit And Fixing On Bus Bar Then Making All Lt Circuit Connection Complete 122 Errection Of Lt Distribution Piller, Feeder Piller And Service Piller Alog With Grouting And Connection 123 Laying Of Lt Cable By Digging Of Road And Providing Of Brick And Sand 124 Lugging And Connection Of Lt Cable With Service Piller 125 Earthing Of All Lt Pannel 126 Strengthening Of 33Kv U / G Line 127 Loading Unloading & Carriage Of Stp 11 Mtr Long , Conductor, Earth Rod, Stay Set, G.I. Wire, Angle, Channel Etcfrom Raja Talab Central Store To Site 128 Loading Unloading & Carriage Of 33 Kv Cable, From Raja Talab Central Store To Site 129 Erection Grouting Of 11 Mtr D / P With Fitting Of All Accessories Including In Cost Of Grouting Material 130 Laying & Dressing Of U / G 33 Kv 3X300 Sq Mm Xlpe Cable After Digging Of Roadincluding In Cost Of Brick, Patiya & Sand And C.I. Pipe Required Of Road X-Ing As Per Norms 131 Laying & Dressing Of U / G 33 Kv 3X300 Sq Mm Xlpe Cable Through Hdd Methode As Per Norms 132 Earthing Of Pole By Earthing Rod 133 Fitting Of Cable Marker With Cost Of Cable Marker 134 Jointing Of 33 Kv O / D H.S. J. Kit For 3X300 Sq Mm Xlpe Cable 135 Jointing Of 33 Kv S / T H.S. J. Kit For 3X300 Sq Mm Xlpe Cable 136 Hoisting Of 33 Kv 3X300 Sq Mm Cable On Double Pole Through G.I.Pipe Of Size 6 Dia, 3 Mtr Long Including Its Jumpring Complete 137 Painting Of Stp 11 Mtr & Fitting With 01 Coat Red Oxide & 02 Coat Allu. Paints After Prepartion Of Sulface Including Cost Of Material 138 Inc. Capacity Of 33 / 11Kv S / S - 1 Nos 139 Dismentling Of Existing Power Transformer And Shifting To Out Side Of Switch Yard 140 Errection And Commissioning Of 5 / 10Mva Transformer On Plinth And Fixing Of All Accessories Along With Top Up Of Transformer Oil Complete In All Respect. 141 Installation Of 11 Kv Switch Gear & Control Panel In Control Room Complete Work Including 142 Febrication & Fitting Fixing And Grouting Of Cable Stand With Grouting Material Etc 143 Earthing Of Indoor Equipment Including Cost Of Material Complete As Per Desing Prescribed By Resspo. 144 Leveling Of Switchyard & Laying Of Stone Blast In S-Yard As Per Norms 145 Construction Of Path Way & Lighting Of Switchyard Complete With Cost Of Material 146 Sp. Pipe Earthing Of Power T / F Nutral & Body Seperatewith 60 Deep G.I. Pipe 40 Mm Dia Including Material