Tender For Replacement Of Aged Fire Pump House And Product Pump House Apparatus. -- 1 Complete Design & Engineering, Procurement, Supply And Erection Cum Installation, Inspection, Testing, Commissioning, Painting And Packing & Dispatching Drawings / Documents Of The Electric Motor Driven Security Air Compressor Unit With Allaccessories As Per Technical Specification Enclosed. ( Capacity = 15 M3 / Hr. ( Fad ) , Discharge Pressure=7Kg / Cm2, Air Cooled Reciprocating Type ) 2 Supply And Installationof Auto Drain Valve For Main Air Receiver Tanks / Security Air Compressor Tanks / Screw Air Compressor Including Laying Of Cable From Fire Pump House Panel To Receiver Tank Of Fire Pump House. 3 Supply And Installationof Auto Drain Valve For Main Air Receiver Tanks / Security Air Compressor Tanks / Screw Air Compressor Including Laying Of Cable From Fire Pump House Panel To Receiver Tank Of Fire Pump House ( Flp Solenoid Valve-220V ) . 4 Air-Moisture Separator With Auto Drain Facility In Inletof Main Air Receiver Tank Withbypass Line 5 Supply And Installation Of Air Flow Meter 6 Supply And Installation Of Online Hygometer 7 Complete Design & Engineering, Procurement, Supply And Erection Cum Installation, Inspection, Testing, Commissioning, Painting And Packing & Dispatching Drawings / Documents Of The Electric Motor Driven Jockey Pump With Allaccessories As Per Technical Specifications Enclosed. Job Inlcudes Necessary Mdofication In Suction And Discharge Line Of Existing Jockey Pumps. Jockey Pumps Shall Be Multi-Stage. Flow70 M3 / Hr. And Head = 110 M 8 Procurement, Supply And Erection Cum Installation, Inspection, Testing, Commissioning, Painting And Packing & Dispatching, Drawings / Documents Of Cooling Water Pump Along With Drive Motor, Accessories & Spares As Per Technical Specification Enclosed Pump Type : Non-Api Horizontal Centrifugal Pump: 10 M3 / H & Diff. Head : 36.6 M Material Of Construction: Casing - Carbon Steel, Impeller - Ss316, Shaft - Aisi 410 9 Supply And Installation Of Flp Flow Switch And Laying Of Control Cable For The Same To Local Panel 10 Supply And Installation Of Non- Flp Pressure Switch 11 Procurement, Supply And Erection Cum Installation, Inspection, Testing, Commissioning, Painting And Packing & Dispatching, Drawings / Documents Of Water Transfer Pumps Along With Drive Motor, Accessories & Spares As Per Technical Specification Enclosed.Pump Type : Non-Api Horizontal Centrifugal Pump: Flow = 20 M3 / H & Diff. Head : 35.5 M Material Of Construction: Casing - Carbon Steel, Impeller - Ss316, Shaft - Aisi 410 12 Supply And Laying 50Nb Gi Air Line From Tlf To St Plant 13 Supply And Installation Of Remote Operate Valve With Solenoid 14 Supply And Laying Of Gi Strip For Body Earthing Of Fph Equipments ( 32X6 ) 15 Supply And Laying Of Cable For Rov From St Plant To Shed.Armoured Cables Supply & Laying Ofxlpe Insulated Pvc Sheathed Aluminium / Copper Conductor, 1.1 Kv Grade Armoured Cable Conforming To Is:7098, As Per Approved Make In Ground / Trench / Surface / Pipe, Etc. Whereever Required As Per Direction Of Engineer In-Charge. Note: The Rate Of Installation Should Be Inclusive Of Cable Clamps, Tags Saddles, Consumables Etc. Trays / Pipes, Trenches, Fabricated Tray Supports Etc Will Be Covered & Paid In Separate Items 16 Supply And Laying Of Power And Control Cable ( 4C*2.5Sqmm ) For Security Air Compressor. Specification Cable Is Same As Line Item 8.1. 17 Refitting Of Electrical Panel Of Jockey Pumps And Air Compressor With Proper Size, Door Lock With Loto Arrangement, Sfu, Fuses, Micropressor Based Relay, Contractor, Ct And Digital Ammeter. Contractor Needs To Modify The Panel As Per The Type-2 Coordination Chart. This Includes Supply And Fitting Of All The Mentioned Components. 18 Dismantling Of Existing Equipment Along With All Piping, Fittings, Accessories And Shifting To Location Inside Plant As Per Direction Of Eic. Dismantling Electrical Connection Including Cables & All Accessories & Re - Installation The Same As Per Direction Of Eic. 19 Printing And Fixing Of Trilingual Sop Boards 20 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30 Cm In Depth, 1.5M In Widthas Well As 10 Sqm On Plan ) Including Taking Out And Disposal Of Excavated Earth Within Or Outside Site To Unobjectionable Place And Lift Upto 1.5M, As Directed By Engineer-In-Charge. Disposed Earth To Be Levelled And Neatly Dressed. All Kinds Of Soil ( 2M*1M*0.5M ) 21 Supplying And Filling In Plinth With Sand Within Specified Grading Zone Of Fine Aggregates Specified In Table 3.1, Clause 3.1.3 Of Attached Specifications Under Floors, Etc. In Layers Not Exceeding 20Cm In Depth, Each Deposited Layer To Be Compacted By Ramming Including Watering, Consolidating And Dressing Complete.Local Fine Sand Within Grading Zone Iv 22 Providing & Laying Cement Concrete In Retaining Walls, Return Walls, Walls ( Any Thickness ) Including Attached Pilasters, Columns, Piers, Abutments, Pillars, Posts, Struts, Buttresses, String Or Lacing Courses, Parapets, Coping, Bed Blocks, Anchor Blocks, Plain Window Sills, Fillets, Sunken Floor Etc. Up To Floor V Level Excluding The Cost Of Centering, Shuttering And Finishing : Pcc 1 Cement:2 Coarse Sand:4 Graded Stone Aggregate 20Mm- ( 2X1x.1 ) 23 Providing And Laying Inposition Specified Grade Ofreinforced Cement Concreteexcludingthecostofcentering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Levelrcc 1 Cement :1 Coarse Sand: 2 Graded Stone Aggregate 20Mm 24 Supply Of Steel Reinforcement For R.C.C. Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete At All Levelsthermo Mechanically Treated Bars Of Fe- 500D Grade Or More, Conforming To Is1786 25 Demolishing R.C.C. Workmanually / By Mechanicalmeans Including Stacking Of Steel Bars & Disposal Of Unserviceable Material Outside Site To An Unobjectionable Place As / Direction Of Engineer-In-Charge 26 Providing And Laying Cement Plaster On Surfaces With Fine Sand Including Curing And Net Cement On Top And Insidei ) 12 Mm Cement Plaster Of Mix 1:4 ( 1 Cement: 4 Fine Sand ) 27 Centeringand Shutteringincludingstrutting, Proppingetc. And Removal Of Form Work For :- Foundations, Footings, Bases Of Column => Limited