Regarding Work Of Replacement Of Old 11 Kv Vcb And Installation Of New 33 Kv Vcb And La, Isolator And Painting Of 33 / 11 Kv Sub Station Fouji Colonycontrol Room And Sub Station Yard Under Capital ( S.I ) Under Edsd Bazpur Under Electricity Distribution Division Bazpur Kashipur Under In This Circle For The Year 2023-24.; 1 Supply Item 2 Supply Of 24V Battery Charger 3 Supply Of 24V Battery Set 4 Supply Of 33 Kv Isolator Clamp For Panther Conductor 5 Supply Of 33 Kv Ct Clamp For Panther Conductor 6 Supply Of 33 Kv T- Connector For Panther To Panther 7 Supply Of 33 Kv Pg Clamp For Panther Condutor 8 Supply Of Led Flush Flood Light 100 W 9 Supply Of Coppur Cable 1.5Sqr Mm*2 10 Supply Of 10 Way Mcb Box 11 Supply Of Mcb 10 Amp 12 Supply Of Mcb 32 Amp 13 Supply Of M S Flate Earth Strip ( 50X6 Mm ) 14 Supply Of G I Earthing Strip ( 50X6 Mm ) 15 Supply Of M S Earth Electrod ( 32 Mm X 2500 Mm ) 16 Supply Of Earth Electrode Connecting Clamp ( 50X6x150 Mm ) 17 33 Kv Yard Work 18 Cartage Of Following Material From Store Centre Kashipur, By Shiftting The Same From Store To Siteloading Place & Loading On Private Truck With Unloading Place At 33 / 11 Kv S / S Mandi Bazpur 21-50 Km. 19 11Kv Vcb Fdr 400 / 200 / 5A O / G, I / G & Buscoupler 20 33 Kv Vcb 1250 A, 24 V 21 33 Kv Ct / Isolator / 33 Kv La 22 Other Small Material & Contral Cable 23 Dismantling And Shifting Of 11 Kv Vcb , And Bus Coupler From Existing Control Room Mandi S / S To Store Center Kashipur By Private Truck With Loading & Unloadingby Dragind Through Mannual Labour And Hydra 24 Grouting Work Of 11 Kv Vcb Including Alignment And Leveling And Connecting Busbar With Each Vcb 25 Manual Shifting / Pulling From Existed Site To Plinth Nearby Distance To 200Mtr And Installation And Energiging Of 11 Kv Vcb 26 Grouting Work Of 33 Kv Vcb Including Alignment And Leveling Including Material 27 Installation And Energiging Of 33 Kv Vcb 28 Earthing Work Of 11 Kv Vcb , And Bus Coupler & Indoor Equipment In Control Room Including Providing Of Required Material Like Gi Strips Complete Work In All Respect 29 Earthing Work Of 33 Kv Vcb Including Providing Of Required Material Like Gi Strips Complete Work In All Respect 30 Installation Of 33 Kv Line Isolator Including Proper Adjustment And Earthing Including Providing Of Required Material Like Gi Strips Complete Work In All Respect 31 Installation Of 33 Kv Ct Including Testing And Proper Wiring And Providing Of Required Material Like Gi Strips Complete Work In All Respect 32 Installation Of 33 Kv La Including Providing Of Required Material Like Gi Strips Complete Work In All Respect 33 Installation And Energiging Of 24 Volt Battary Bank 34 Testing Work Of 11 Kv Vcb With Wiring And Energigationcomplete Work In All Respect 35 Testing Work Of 33 Kv Newvcb With Wiring And Energisationcomplete Work In All Respect 36 Filling Of Termination Cable Jointing Kit Provided By Upcl 37 Laying Of ( 4X2.5 ) Control Cable 38 Earthing 39 Transformer ( N ) Earth Work By Digging Chemical Earth System And Connect With Gi Strip 50X6 Mm And Making Of Chamber With Cover On It ( With Material ) 40 Control Room Electricals Works 41 Wiring For Light Point / Fan Point / Exhaust Fan Point / Call Bell Point With 1.5 Sq.Mm Frls Pvc Insulated Copper Conductor Single Core Cable In Surface / Recessed Steel Conduit, With Modular Switch, Modular Plate, Suitable Gi Box And Earthing The Point With 1.5 Sq.Mm. Frls Pvc Insulated Copper Conductor Single Core Cable Etc. As Required.Group B At Control Room 42 Wiring For Circuit / Submain Wiring Alongwith Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface / Recessed Medium Class Pvc Conduit As Required. 2 X 1.5 Sq. Mm + 1 X 1.5 Sq. Mm Earth Wire At Control Room 43 Wiring For Circuit / Submain Wiring Alongwith Earth Wire With The Following Sizes Of Frls Pvc Insulated Copper Conductor, Single Core Cable In Surface / Recessed Medium Class Pvc Conduit As Required. 2 X 2.5 Sq. Mm + 1 X 2.5 Sq. Mm Earth Wire At Control Room 44 Supplying And Fixing Stepped Type Electronic Fan Regulator On The Existing Modular Plate Switch Box Including Connections But Excluding Modular Plate Etc. As Required. At Control Room 45 Supplying And Fixing Following Way, Single Pole And Neutral, Sheet Steel, Mcb Distribution Board, 240 Volts, On Surface / Recess, Complete With Tinned Copper Bus Bar, Neutral Bus Bar, Earth Bar, Din Bar, Interconnections, Powder Painted Including Earthing Etc. As Required. ( But Without Mcb / Rccb / Isolator ) 8 Way , Double Door At Control Room 46 Supplying And Fixing 5 Amps To 32 Amps Rating, 240 / 415 Volts, C Curve, Miniature Circuit Breaker Suitable For Inductive Load Of Following Poles In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required. At Control Room 47 Supplying And Fixing Following Rating, Double Pole, 240 Volts, Isolator In The Existing Mcb Db Complete With Connections, Testing And Commissioning Etc. As Required. 40 Amps At Control Room 48 Supplying And Fixing Following Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.5 / 6 Amps Switch At Control Room 49 Supplying And Fixing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.15 / 16 Amp Switch At Control Room 50 Supplying And Fixing Modular Switch / Socket On The Existing Modular Plate & Switch Box Including Connections But Excluding Modular Plate Etc. As Required.6 Pin 15 / 16 Amp Socket Outlet At Control Room 51 Supplying And Fixing Metal Box Of 180Mm X 100Mm X 60Mm Deep ( Nominal Size ) On Surface Or In Recess With Suitable Size Of Phenolicproviding And Fixing 6 Pin 5 / 6 & 15 / 16 Amps Socket Outlet And 15 / 16 Amps Piano Type Switch, Connection, Painting Etc. As Required. At Control Room 52 Poroviding And Fixing Of Yard Ledlight ( 100 Watt ) 53 Control Room Misc Civil Work 54 P / Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:1½:3 ( 1 Cement: 1½ Coarse Sand: 3 Graded Stone Aggregate 20 Mm Nominal Size ) At Control Room Roof Leveling Work 55 Providing And Fixing On Wall Face Unplasticised Rigid Pvc Rain Water Pipes Conforming To Is : 13592 Type A, Including Jointing With Seal Ring Conforming To Is : 5382, Leaving 10 Mm Gap For Thermal Expansion, ( I ) Single Socketed Pipes 110 Mm Diameter At Control Room 56 12 Mm Cement Plaster Of Mix 1:4 ( 1 Cement: 4 Coarse Sand ) Yard Toe Wll And Yard Toe Wall Top 57 12 Mm Cement Plaster Of Mix : 1:6 ( 1 Cement : 6 Coarse Sand ) Control Room Roof Patta Wall 58 Cement Plaster 1:3 ( 1 Cement: 3 Coarse Sand ) Finished With A Floating Coat Of Neat Cement.20 Mm Cement Plaster At Control Room Roof Part-1 59 Distempering With Oil Bound Washable Distemper Of Approved Brand And Manufacture To Give An Even Shade : New Work ( Two Or More Coats ) Over And Including Water Tinnable Priming Coat With Cement Primer As Per A-D Point No.6 60 Finishing Walls With Acrylic Smooth Exterior Paint Of Required Shade :New Work ( Two Or More Coat Applied @ 1.67 Ltr / 10 Sqm Over And Including Priming Coat Of Exterior Primer Applied @ 2.20 Kg / 10 Sqm ) 61 Painting With Synthetic Enamel Paint Of Approved Brand Andmanufacture To Give An Even Shade :Two Or More Coats On New Work Pale Fencing And Painting Work On Yard Structure ( I.E. La ( 2 Nos ) , Vca ( 2 Nos ) , Ct / Pt ( 3 Nos ) / Isolator ( 3 Nos ) Post ( 2 Nos ) , Main 33Kv Incommer, Outgoing & Bushbar ( 4 Nos ) , 1 Pole ( 6 Nos ) , 4 Pole ( 1 Nos ) , Double Pole ( 4 Nos ) , Fuse ( Set 2 Nos ) 62 Repairs To Plaster Of Thickness 12 Mm To 20 Mm In Patches Of Area 2.5 Sq. Meters And Under, Including Cutting The Patch In Proper Shape, Raking Out Joints And Preparing And Plastering The Surface Of Thewalls Complete, Including 50 Metres Lead :With Cement Mortar 1:4 ( 1Cement: 4 Coarse Sand ) At Control Room Inner & Outer Side 63 Providing And Fixing Wash Basin With C.I. Brackets, 15 Mm C.P. Brasspillar Taps, 32 Mm C.P. Brass Waste Of Standard Pattern, Including Painting Of Fittings And Brackets, Cutting And Making Good The Walls Wherever Providing And Fixing Wash Basin With C.I. Brackets, 15 Mm C.P. Brass Pillar Taps, 32 Mm C.P. Brass Waste Of Standard Pattern, Including Painting Of Fittings And Brackets, Cutting And Making Good The Walls Wherever Require: At Toilet 64 Providing And Fixing White Vitreous China Pedestal For Wash Basin Completely Recessed At The Back For The Reception Of Pipes And Fittings. At Toilet 65 Providing And Fixing C.P. Brass Long Body Bib Cock Of Approved Quality Conforming To Is Standards And Weighing Not Less Than 690 Gms. ( 15 Mm Nominal Bore ) At Toilet 66 Providing And Fixing C.P. Brass Stop Cock ( Concealed ) Of Standard Design And Of Approved Make Conforming To Is:8931. ( 15 Mm Nominal Bore ) At Toilet 67 Providing And Fixing C.P. Brass Angle Valve For Basin Mixer And Geyser Points Of Approved Quality Conforming To Is:8931 A ) 15 Mm Nominal Bore15mm Nominal Bore At Toilet. 68 P / Laying Water Proofing Treatment On Roofs Of Slabs By Applyingcement Slurry Mixed With Water Proofing Cement Compound Consisting Of Applying: A ) After Surface Preparation, First Layer Of Slurry Of Cement @ 0.488 Kg / Sqm Mixed With Water Proofing Cement Compound @ 0.253 Kg / Sqm. B ) Laying Second Layer Of Fibre Glass Cloth When The First Layer Is Still Green. Overlaps Of Joints Of Fibre Cloth Should Not Be Less Than 10 Cm. C ) Third Layer Of 1.5 Mm Thickness Consisting Of Slurry Of Cement @ 1.289 Kg / Sqm Mixed With Water Proofing Cement Compound @ 0.670 Kg / Sqm And Coarse Sand @ 1.289 Kg / Sqm. This Will Be Allowed To Air Cure For 4 Hours Followed By Water Curing For 48 Hours. The Entire Treatment Will Be Taken Upto 30 Cm On Parapet Wall And Tucked Into Groove In Parapet All Around. D ) Fourth And Final Layer Of Brick Tiling With Cement Mortar ( Which Will Be Aid For Separately. For The Purpose Of Measurement The Entire Treatedsurface Will Be Measured. At Control Room Roof Part-1