Tender For Mechanical Fabrication And Erection Jobs-- 1 Dismantling Up To 12” 2 Fabricate Erection Up To 12” Dia Size 3 Dismantling Above 12” 4 Fabricate And Erection Above 12” 5 Flangesflanges, Bends, Nipples, Reducer & Blind E.T.C Dismantlingand Erection Up To 12” Dia Size 6 Flanges, Bends Nipples, Reducer Blind E.T.C Dismantlingand Erection Above 12” Dia Size 7 Dismantling Of Only Flanges From Old Pipe Lines For Reuse 8 Fabrication Of Flanges From M.S. Plate 9 Fabrication Of Bend Up To 24” 10 Fabrication Of Bend Above 24” 11 Fabrication Of Flanges, Nipples, Reducer Up To 24” 12 Fabrication Of Flanges, Nipples, Reducer Above 24” 13 Valvesreplacement Of Valve Up To 12” Dia 14 Fitting Of New Valve Up To 12” Dia 15 Replacement Of Valve Above 12” 16 Fitting Of New Valve Above 12” 17 Fitting Of Angle Valve Above 20” To 42” 18 C.I. Pipe Line & Crossreplacement Of Frp Pipe 6” 19 Replacement Of Frp Cross 6” 20 M.S & S.S. Plant Fabricated Jobs ( Tanks, Gutter, Chute, Bottle, Cone Etc ) Fabrication, Erection & Replacement Of Old Tank Above 3 Mm Plate 21 Structure Work ( Staging, Columns, Trusses, Purline Pipe Support, Beam, Channel Support, Platform, Stairs ) Dismantling Fabrication & Erection 22 Hand Railing 23 Replacement Of Old Railing 24 Fabrication O& Erection Of New Railing 25 Rake Carrier / Be / B.C / R.B.C / Corss Carrier Trough. Runners, Tanks Bottomsreplacement Of Old Troughs, Tanks Bottoms 26 Replacement Of Old 3 Mm Thick S.S Plates 27 Replacement Of Old M.S. Runners 28 Replacement Of Old Donga Plate 29 Replacement Of Carriers Beam 30 Patch Workreplacement Of M.S. Patches 31 S.S Tubes ( Evaporators / Juice Heaters ) Replacement Of Old Brass Tubes & Ss Tube With Hydraulic Testing 32 Brass Tubes & Ss Tube ( Pans ) Replacement Of Old Brass Tubes & Ss Tube With Hydraulic Testing 33 Replacement Of Old Water Gutter / Ritz Of Factory Building 34 Replacement Of Old G.I. / A.C.C. Sheets Of Factory / Godowns 35 Replacement Of Damaged Ammonia Coils Of Evaporators 36 Replacement Of Damaged Ammonia Boils Of Pans 37 Replacement Of Damaged Ammonia Coils Of Juice Heater 38 Welding Of Top Plate Of Condensate Bottle Of Quad After Removing Flange 39 Dismantling Fabrication And Erection Condensate / Juice Receiving Bottle Quad / Juice Heater O-Lever / Pan 40 Welding And Grinding Of Sq / Coupling Of Mills Roller As Per Given Profile 41 Welding And Grinding Of Tail Bar ( Both End ) As Per Given Profile. 42 Replacement Of Worn-Out Partition Plate Of Juice Heater 43 Replacement Of Worn-Out-Partition Plate Of Juice Heater 44 Welding, Hard Facing With Weighing Of Fiberize Hammers To Equal Weight 45 Repair Of Sprockets Teeth As Per Given Profile 46 Hard Facing Of Under Feed Rollers 47 Arcing Of Mill Rollers 48 Replacement Of Wet Scrubber Sieve Made Of Angles And Flat 49 Replacement Of Feed Pipe, Nipple, Valve Of Batch Type Pan 50 Replacement Of Save All Of Batch Type Pan Or Evaporator Body With Support 51 Fabrication And Creation Of New Bed Of Pump With Motor & Gear Box 52 Fabrication And Erection Of Main Hole Including Blind For Evaporator Body Or Vacuum Pan E.T.C 53 Repairing / Welding Of Crystallizer Broken Shaft 54 Dismantling & Fitting Of Drive Gear Wheel Of Crystallizer 55 Dismantling / Fab. / Erection Of Sulpherfurnance Coil 56 Modification Of Right Angle Valve Above 14” From Metallic Seat To Rubber Seat. 57 Modification & Repair Of Different Type Valve Up To 12” From Metallic Seat To Rubber Seat 58 Replacement Of Runner Sugar Elevator 59 Turbine’S Extraction Pipe Lines To Be Taken Out Towards D.M. Plant Side 60 Welding Of Pads On Cane Carrier Slates 61 Modification Of Screw Conveyor 62 Dismantling The Tower Of Syrup Sulphiter& Juice Sulphiter Lower It Ground Floor & Assemble It Again. 63 Dismantling, Fabrication And Erection Of Masse Cuite Gutters. 64 Dismantling, Fabrication And Erection Of Coil Of Crystallizer – B &C 65 Dismantling, Fabrication And Erection Of Suction Cone Of Id Fan 66 Dismantling, Fabrication And Erection Of Damper Of Id Fan 67 Dismantling, Fabrication And Erection Of Expansion Joint 68 Dismantling, Fabrication And Erection Of Boiler Ducting And Other Ducting Or Side Plate Etc 69 Replacement Of Water Jacket Of Sulphar Furnace 70 Dismantling Fabrication And Erection Of Furnace Gas Coolers 71 Dismantling, Fabrication And Erection Of After Burner Of Sulphur Furnace 72 Fabrication & Erection Of M.S. Pipe Bagasse Cello Blower 73 Fabrication & Erection M.S Casing For Bagasse Cello Blower 74 Fabrication & Erection M.S Fan For Bagasse Cello Blower 75 Replacement Of Damaged Washing Coils Of Pan 76 Dismantling Fabrication And Erection Of Feed Pipe Of ¾” Coil Dia 2 ½ “ 77 Dismantling, Fabrication And Steam Coil 1 “Dia 8Ft Coun. C / F M / C 78 Support The Save-All In Side & Outside Of Coun. Pan 79 Vapor Pipe Support In Side Of Pan / Quard 80 Modification F Pan Discharge Valve 81 Replacement Of Molasses Guard Top Ring ( Dia 1170 X 5” ) Of Coun. M / C 82 Dismantling, Fabrication And Erection Of Mud Mixture Box 83 Repairing Of Center Shaft Of Door 84 Dismantling Fabrication And Erection Of Agitator Tray Of O-Lever 85 Repairing Of Bottom & Top Side Rubber Grooving Of Juice Heater 86 Dismantling, Fabrication And Erection Of O-Liver Vacuum Condensate Bottle 87 Dismantling, Fabrication And Erection Of Dsm Screen 88 Dismantling, Fabrication And Erection Of Wet Scrubber M.S Screen. 89 Repairing The Multi Tray Of Hopper 90 Fabrication And Erection Of Multi Try Of Hopper 91 Dismantling, Fabrication And Erection Of Bottom Of Clarifier 92 Dismantling, Fabrication And Erection Of Gas Cooler 93 Dismantling, Fabrication And Erection Injection Pump Suction Pipe Jail 94 Running Welding Of Any Job 95 Dismantling, Fabrication And Erection Of Discharge Scrapper Casing 96 Dismantling, Fabrication And Erection Cane Un Loader Sq. Bar Of Bridge & Trolley 97 Dismantling, Repairing Of Fibrizerms. Casing With Ss Plate Welded 98 Dismantling, Fabrication And Erection Of Grabs Ms Box 99 Hrad Facing Of Grabs Finger 100 Replacement & Erection Of Any Type Jail 101 Dismantling, Fabrication And Erection Of Feed Pipe Of Coun. Pan 102 Dismantling, Fabrication And Erection Of Pan / Quad Umbrella 103 Dismantling, Fabrication And Erection Of Pan / Quad ‘J’ Pipe 104 Dismantling, Fabrication And Erection Of Pan / Quad & Jh Condensed Box 105 Dismantling, Fabrication And Erection Of Ss Truff Inter Rack Main Rack Carriers Etc 106 Repairing Of Mill Juice Tray & Bottle Aluminum 107 Dismantling, Fabrication And Erection Down Take Pipe Of Quad / Pan 108 Dismantling, Fabrication And Erection 2” Coil Of Malter / Syrup Tank 109 Dismantling, Fabrication And Erection Of Vertical Crystallizer Coils 110 Repairing Of Vertical Crystallizer Coil 111 Fabrication And Erection Of Air Ducting At C / F Station 1 X 1 Feet 112 Dismantling, Fabrication And Erection Of All Turbine Oil & Pressure Gauges Line 3 / 8” & ½” 113 Dismantling, Fabrication And Erection Of Crystallizer Arms 114 Dismantling, Fabrication And Erection Of I Channel Of Mill House Crane With Alignment 115 Repairing Of Arrester Box Of B & C Cont. Pan With Support 116 Replacement Of Steam Pipe Line, Drain Etc, With Valve 117 Dismantling, Fabrication And Erection Of Mud Mixture Casing 118 Replacement / Fitting Of Rubber Gutka Size 42 / 45 & 98 / 102 With Tie Rod At Evaporator / Pan / Juice Heater. 119 Welding Of Tie Rod Of Evaporator / Pan / Juice Heater 120 Dismantling & Fabrication & Erection Of Vapour Pipe Pan / Quad 121 Replacement Of Damaged Portion Of Save All & Roof Of Cont. Pan 4 122 Dismantling & Fabrication & Erection Of Shell Of Melter 123 Dismantling & Fabrication & Erection Of Fibrizer Casing 124 Dismantling & Fabrication & Erection Of Pusher Casing 125 Fabrication Of Ms Cover For Under Feed Roller 126 Cane Stopper Flap Of Cane Leveler & Chopper 127 Dismantling & Commissioning Of I D Fan Dia 2100 Mm 128 Dismantling & Commissioning Of I D Fan Dia 1100 Mm