|
| 1 | Annual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS,Fire Detection & Protection System,DPPS |
| 2 | Mandatory PartAnnual Maintenance Contract of Field Instruments of U#7, U#8/ DPPS including U#7 & U#8 PWPS, Intake Raw Water System, FAHS,Fire Detection & Protection System,DPPS |
| 3 | Optional Job: A |
| 4 | All Flame Scanner Cleaning and Calibrationincluding optical fiber cable checking. |
| 5 | All Furnace Pressure Switch Dismantling, Calibration and refitting. |
| 6 | All SADC Dismantling, calibration and Refitting(B/M to assist for dismantling and refitting) |
| 7 | All Igniter Servicing (B/M to assist for dismantling and refitting) |
| 8 | Burner Tilt Power cylinder Dismantling,calibration & Refitting (B/M to assist for dismantling and refitting) |
| 9 | Oxygen Probes Dismantling, calibration & Refitting job. |
| 10 | Dismantling , calibration checking & Refitting of ASLD. |
| 11 | MaxDNA DCS/ABB DCS/TSI/ETS/FLAME Scanner/FSSS/Vibration Panel/PLC cleaning and Fan replacement. |
| 12 | Power cylinder dismantling, servicing & refitting at Ash Handling plant. |
| 13 | Checking of limit switches of different Gates / Drives/ Actuators at DM plant. |
| 14 | HAG/CAG/Feeder outlet gate/Hot PA Shutoff Lock power cylinders dismantling, servicing & refitting. |
| 15 | Servicing & Seal Kit Change of solenoid valves , Dismantling & Refitting. |
| 16 | Dismantling, Calibration & Refitting of Pressure Switches for Air/Water/Stream. |
| 17 | Dismantling, Refitting & Checking of RTD/Thermocouple. |
| 18 | Dismantling & Refitting of Vibration sensors. |
| 19 | Mill, PA,ID & FD Lub Oil Switches Calibration. |
| 20 | Dismantling & Refitting of Gauges. |
| 21 | Power Cylinder Checking & serving of MillHAD,CAD, FD,PA Blade pitch, ID IGV & Scoop, Mill O/L Gate, Mill reject System etc. |
| 22 | All Pneumatic Control & Shut Off V/V Positioner, Position Feedback System Checking& Calibration.(FCV, SH & RH Spray, BMS,FO, PRDS etc.) |
| 23 | AFR/Air Lock/ Volume Booster/ QuickExhauster Dismantling, Cleaning /Servicing &Mounting/ Refitting. |
| 24 | Calibration of Blade Pitch/ Scoop/ IGV ofFD/PA/ID Fans. |
| 25 | Disconnecting & reconnecting of RTDs. |
| 26 | Temperature Sensors along with Guide PipeChecking. |
| 27 | Cleaning ,sealing and Polythene Wrapping (During Boiler, ESP washing) of JBs. |
| 28 | Impulse line purging of different Transmitter & switches. |
| 29 | Checking/Cleaning & calibration of CoalFeeder panel. |
| 30 | Boiler drum Hydrastep Servicing/Cleaning. |
| 31 | Pulsejet Dismantling, checking & Refitting. |
| 32 | Isolation valve replacement of Pneumatic Line. |
| 33 | Transmitter dismantling & Refitting. |
| 34 | Air hose pipe dismantling and refitting(SADC/ Mill etc.) |
| 35 | IP converter Dismantling, calibration& Refitting. |
| 36 | Transmitter Cleaning, calibration, Testing. |
| 37 | Boiler Interlock & Protection Checking. |
| 38 | Miscellaneous Job. |
| 39 | Optional Job: B |
| 40 | All Flame Scanner Cleaning and Calibration including optical fiber cable checking. |
| 41 | All Furnace Pressure Switch Dismantling, Calibration and Refitting. |
| 42 | All SADC Dismantling, calibration and Refitting (B/M to assist for dismantling and refitting) |
| 43 | All Igniter Servicing (B/M to assist for dismantling and refitting) |
| 44 | Burner Tilt Power cylinder Dismantling, calibration& Refitting (B/M to assist for dismantling and refitting) |
| 45 | Oxygen Probes Dismantling, calibration & Refittingjob. |
| 46 | Dismantling , calibration checking & Refitting ofASLD |
| 47 | MaxDNA DCS/ABB DCS/TSI/ETS/FLAMEScanner/FSSS/Vibration Panel/PLC cleaning and Fan replacement. |
| 48 | Power cylinder dismantling, servicing & refitting at Ash Handling plant. |
| 49 | Checking of limit switches of different Gates / Drives/ Actuators at DM plant. |
| 50 | HAG/CAG/Feeder outlet gate/Hot PA Shutoff Lock power cylinders dismantling, servicing & refitting. |
| 51 | Servicing & Seal Kit Change of Solenoid valves , Dismantling & Refitting. |
| 52 | Dismantling, calibration & Refitting of PressureSwitches. |
| 53 | Dismantling, Refitting & Checking of RTDs/TCs. |
| 54 | Dismantling & Refitting of Vibration sensors. |
| 55 | Mill, PA,ID & FD Lub Oil, Working oil SwitchesCalibration. |
| 56 | Dismantling & Refitting of Gauges. |
| 57 | Power Cylinder Checking & serving of Mill HAD,CAD, FD,PA Blade pitch ,ID IGV & Scoop, Mill O/L Gate, Mill reject System etc. |
| 58 | All Pneumatic Control & ShutOff V/V Positioner, Position Feedback System Checking & Calibration.(FCV, SH & RH Spray, BMS, FO,PRDS etc.) |
| 59 | AFR/Air Lock/ Volume Booster/ Quick Exhauster Dismantling, Cleaning /Servicing & Mounting/Refitting. |
| 60 | Calibration of Blade Pitch/ Scoop/ IGV of FD/PA/ID Fans. |
| 61 | Disconnecting & reconnecting of RTDs./TCs |
| 62 | Temperature Sensors along with Guide Pipe Checking. |
| 63 | Cleaning ,sealing and Polythene Wrapping(During Boiler, ESP washing etc.) of JBs. |
| 64 | Impulse line purging of different Transmitter & switches. |
| 65 | Checking/Cleaning & calibration of Coal Feeder panel. |
| 66 | Boiler drum hydrastep servicing/cleaning. |
| 67 | Pulsejet Dismantling, checking & Refitting. |
| 68 | Isolation valve replacement of Pneumatic Line. |
| 69 | Transmitter dismantling & Refitting. |
| 70 | Air hose pipe dismantling and refitting(SADC/ Mill etc.) |
| 71 | IP converter Dismantling, Calibration &Refitting. |
| 72 | Transmitter Cleaning ,Calibration, Testing. |
| 73 | All Major Interlock & Protection Checking. |
| 74 | BFP Scoop Calibration & Checking. |
| 75 | BFP RPM Indicator and Proximity Sensor Checking. |
| 76 | Hotwell, Deaerator, MOT etc Level Switch Checking. |
| 77 | CW Sump / Forebay Level Transmitter Calibration Checking. |
| 78 | Dismantling, Servicing & Refitting of Auto Drain Valve. |
| 79 | Seal Oil Level Switch Dismantling, Checking & Refitting. |
| 80 | Centrifuge Level Switch Checking & Refitting. |
| 81 | Canopy Making over various Instruments. |
| 82 | Network Connectivity Checking. |
| 83 | Miscellaneous Job. |
| 84 | Optional Job: C |
| 85 | New T/C capillary Wire Laying |
| 86 | Copper/SS Tubing |
| 87 | Optical fiber jointing |
| 88 | Optical fiber checking |
| 89 | Checking, Termination of UTP able |
| 90 | UTP cable Laying related with UCP/DCS/Network Panel/MMI |
| 91 | Low pressure argon welding |
| 92 | Up to 12 core cable laying with both end termination |
| 93 | Above 12 core cable laying with both end termination |
| 94 | New JB fabrication/Modification & Erection. |
| 95 | New Spring TB Mounting for new & Old JB |
| 96 | Canopy making over various Instruments/LIR |